Internet Engineering Task Force P. Ashwood-Smith
Internet-Draft Huawei Technologies
Intended status: Informational R. Iyengar
Expires: July 5, 2013 T. Tsou
Huawei Technologies USA
A. Sajassi
Cisco Technologies
M. Boucadair
C. Jacquenet
France Telecom
M. Daikoku
KDDI corporation
January 2013
NVO3 Operational Requirements
draft-ashwood-nvo3-operational-requirement-02
Abstract
This document provides framework and requirements for Network
Virtualization over Layer 3 (NVO3) Operations, Administration, and
Maintenance (OAM). This document for the most part gathers
requirements from existing IETF drafts and RFCs which have already
extensively studied this subject for different data planes and
layering. As a result this draft is high level and broad. We begin
to ask which are truly required for NVO3 and expect the list to be
narrowed by the working group as subsequent versions of this draft
are created.
Status of this Memo
This Internet-Draft is submitted in full conformance with the
provisions of BCP 78 and BCP 79.
Internet-Drafts are working documents of the Internet Engineering
Task Force (IETF). Note that other groups may also distribute
working documents as Internet-Drafts. The list of current Internet-
Drafts is at http://datatracker.ietf.org/drafts/current/.
Internet-Drafts are draft documents valid for a maximum of six months
and may be updated, replaced, or obsoleted by other documents at any
time. It is inappropriate to use Internet-Drafts as reference
material or to cite them other than as "work in progress."
This Internet-Draft will expire on July 5, 2013.
Copyright Notice
Ashwood-Smith, et al. Expires July 5, 2013 [Page 1]
Internet-Draft NVO3 Operational Requirements January 2013
Copyright (c) 2013 IETF Trust and the persons identified as the
document authors. All rights reserved.
This document is subject to BCP 78 and the IETF Trust's Legal
Provisions Relating to IETF Documents
(http://trustee.ietf.org/license-info) in effect on the date of
publication of this document. Please review these documents
carefully, as they describe your rights and restrictions with respect
to this document. Code Components extracted from this document must
include Simplified BSD License text as described in Section 4.e of
the Trust Legal Provisions and are provided without warranty as
described in the Simplified BSD License.
Ashwood-Smith, et al. Expires July 5, 2013 [Page 2]
Internet-Draft NVO3 Operational Requirements January 2013
Table of Contents
1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.1. OSI Definitions of OAM . . . . . . . . . . . . . . . . . . 4
1.2. Requirements Language . . . . . . . . . . . . . . . . . . 6
1.3. Relationship with Other OAM Work . . . . . . . . . . . . . 6
2. Terminology . . . . . . . . . . . . . . . . . . . . . . . . . 6
3. NVO3 Reference Model . . . . . . . . . . . . . . . . . . . . . 6
4. OAM Framework for NVO3 . . . . . . . . . . . . . . . . . . . . 8
4.1. OAM Layering . . . . . . . . . . . . . . . . . . . . . . . 8
4.2. OAM Domains . . . . . . . . . . . . . . . . . . . . . . . 9
5. NVO3 OAM Requirements . . . . . . . . . . . . . . . . . . . . 10
5.1. Discovery . . . . . . . . . . . . . . . . . . . . . . . . 10
5.2. Connectivity Fault Management . . . . . . . . . . . . . . 10
5.2.1. Connectivity Fault Detection . . . . . . . . . . . . . 10
5.2.2. Connectivity Fault Verification . . . . . . . . . . . 10
5.2.3. Connectivity Fault localization . . . . . . . . . . . 10
5.2.4. Connectivity Fault Notification and Alarm
Suppression . . . . . . . . . . . . . . . . . . . . . 11
5.3. Frame Loss . . . . . . . . . . . . . . . . . . . . . . . . 11
5.4. Frame Delay . . . . . . . . . . . . . . . . . . . . . . . 11
5.5. Frame Delay Variation . . . . . . . . . . . . . . . . . . 11