|
Done
|
Hold the first Working Group meeting and discuss the charter and the state of progress on the chartered items.
|
|
Done
|
Update the PIM-DM version 2 Internet-draft. Go to WG last call. Submission to IESG for considerations as proposed standard.
|
|
Done
|
Resubmit the latest PIM-SM version 2 specification to IESG for consideration as a proposed standard RFC
|
|
Done
|
Submit PIM-SM Applicability Statements
|
|
Done
|
Submit PIMv2 MIB to IESG for consideration as proposed standard.
|
|
Done
|
Submit updated PIM-SM and PIM-DM internet-drafts, clarifying any inconsistencies or ambiguities in the previous drafts.
|
|
Done
|
Submit PIM-SM version 2 and PIM-DM version 2 specifications to IESG for consideration as Draft Standards.
|
|
Done
|
Submit PIMv2 MIB to IESG for consideration as draft standard.
|
|
Done
|
Ratify new WG charter and milestones
|
|
Done
|
Submit the BSR spec as a Proposed Standard to the IESG
|
|
Done
|
Submit the BSR MIB as a Proposed Standard to the IESG
|
|
Done
|
Submit a generic TLV PIM Join Attribute PS draft to the IESG
|
|
Done
|
Submit RPF Vector (use of PIM Join Attribute) as PS to the IESG
|
|
Done
|
Submit a way to authenticate PIM link local messages as PS to the IESG
|
|
Done
|
Submit an Informational PIM last hop threats document to the IESG
|
|
Aug 2011
|
First WG version of udated RFC 4601
|
|
Aug 2011
|
Submit a more reliable PIM solution (refresh reduction) to the IESG
|
|
Nov 2011
|
Submit a population count extension to PIM to the IESG
|
|
Dec 2011
|
Submit update of RFC 4601 to IESG for advancement to Draft Standard
|