Common Control and Measurement Plane
charter-ietf-ccamp-09
Revision differences
Document history
| Date | Rev. | By | Action |
|---|---|---|---|
|
2026-04-03
|
09 | Liz Flynn | New version available: charter-ietf-ccamp-09.txt |
|
2026-04-03
|
08-05 | Liz Flynn | State changed to Approved from External Review (Message to Community, Selected by Secretariat) |
|
2026-04-03
|
08-05 | Liz Flynn | IESG has approved the charter |
|
2026-04-03
|
08-05 | Liz Flynn | Closed "Approve" ballot |
|
2026-04-02
|
08-05 | Ketan Talaulikar | New version available: charter-ietf-ccamp-08-05.txt |
|
2026-04-02
|
08-04 | Éric Vyncke | [Ballot comment] Thanks for the rechartering and for being clear about the intended publication status of the documents. Nevertheless about the 2nd paragrapg, I find … [Ballot comment] Thanks for the rechartering and for being clear about the intended publication status of the documents. Nevertheless about the 2nd paragrapg, I find the use of 'non-packet' in the current and proposed charter rather vague, should it rather be 'sub-IP frames' or 'layer 1-2 frames' ? Mixing layer-2 Ethernet switches with layer-1 DWDM/OXC/... seems weird to me. |
|
2026-04-02
|
08-04 | Éric Vyncke | [Ballot Position Update] New position, No Objection, has been recorded for Éric Vyncke |
|
2026-04-01
|
08-04 | Charles Eckel | [Ballot comment] I have a few suggestions that I hope are helpful. Overview: OLD "The WG develops protocol extensions related to non-packet technologies networks including … [Ballot comment] I have a few suggestions that I hope are helpful. Overview: OLD "The WG develops protocol extensions related to non-packet technologies networks including for some routing and signaling protocols developed by other routing area WGs." NEW "The WG develops protocol extensions related to non-packet technologies networks, including some for routing and signaling protocols developed by other routing area WGs." Work scope: "Description of non-packet-specific aspects of TE including for multi-area/multi-AS/multi-layer scenarios and definition of protocol extensions for them." Expand the acronym "TE" here, or wherever it is first used. It is currently expanded in the last bullet of the work scope. Coordination: OLD "The protocol extension work (especially definition of protocol formats and procedures) done in the WG will be done either jointly with or through reviews from the WGs such as LSR and TEAS WGs that maintain those base protocols (viz. OSPF, IS-IS, and RSVP-TE)" NEW "The protocol extension work, especially definition of protocol formats and procedures, will be done jointly with, or through reviews from, the WGs (e.g., LSR, TEAS) that maintain those base protocols (e.g., OSPF, IS-IS, RSVP-TE)." |
|
2026-04-01
|
08-04 | Charles Eckel | [Ballot Position Update] New position, No Objection, has been recorded for Charles Eckel |
|
2026-04-01
|
08-04 | Deb Cooley | [Ballot comment] I'm not going to send this one, because it is super simple: typo? transpoonders/transponders? |
|
2026-04-01
|
08-04 | Deb Cooley | [Ballot Position Update] New position, No Objection, has been recorded for Deb Cooley |
|
2026-04-01
|
08-04 | Ketan Talaulikar | New version available: charter-ietf-ccamp-08-04.txt |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Adopt YANG model of Ethernet Tunnel Working Group draft", set due date to May 2026 from April 2026 |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit Transceiver-Related Information within RSVP-TE Signaling to IESG for publication", set due date to May 2026 from March 2026 |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Adopt client tunnel YANG model working group draft", set due date to May 2026 from March 2026 |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit DWDM Interface YANG model to IESG for publication", set due date to May 2026 from February 2026 |
|
2026-04-01
|
08-03 | Gunter Van de Velde | [Ballot comment] Thanks to Ketan to add more guardrails on the demarcation between LSR and CCAMP WG responsibilities ------------------------------- Hi all, Please find my comments … [Ballot comment] Thanks to Ketan to add more guardrails on the demarcation between LSR and CCAMP WG responsibilities ------------------------------- Hi all, Please find my comments on the proposed charter. The current charter already covers CCAMP’s scope well, however I would like clearer wording on the boundary with LSR. I do not assume CCAMP will define new IGP TLVs, as this is within LSR’s scope. The text also suggests using IS-IS/OSPF to flood non-routing information. If that is intended, it should be discussed with LSR. The IGP is an foundational underlay technology; adding non-routing data impacts the LSDB, flooding, and stability. Some observations from the newly proposed Charter: " - Functional specification of extensions for GMPLS-related routing (OSPF, IS-IS) and signaling (RSVP-TE) protocols required for path establishment and maintenance in non-packet technology-specific networks. " GV> Any new OSPF/IS-IS procedures should be defined with LSR. It would help to list which extensions CCAMP owns and how joint work with LSR is handled. " - Define how the properties of network resources gathered by a measurement protocol (or by other means such as configuration) can be distributed in existing routing protocols, such as OSPF, IS-IS, and BGP-LS. " GV> Using IGPs to distribute non-routing properties tends to be avoided by IGPs. It is not what IGPs were originally designed for. This needs clearer scope, requirements, and alignment with LSR. " - Maintenance of specifications related to protocol extensions and data models for non-packet technology-specific networks (Ethernet, TDM, OTN) published by CCAMP. This includes extensions to RSVP-TE, OSPF, IS-IS, and Link Management Protocol (LMP). " GV> Does this imply CCAMP owns extensions to these protocols instead of LSR? " Coordination: The protocol extension work (especially definition of protocol formats and procedures) done in the WG will be done either jointly or in coordination with the WGs such as LSR and TEAS WGs that maintain those base protocols (viz. OSPF, IS-IS, and RSVP-TE). The WG will coordinate with the TEAS WG on all aspects related to TE and specifically to determine whether such protocol extensions should be generalized for TE in any network. The WG will coordinate with the PCE WG when it comes to the Path Computation Element Protocol (PCEP) and path computation aspects in non-packet technology-specific networks. Data model design will be coordinated with other related WGs, such as TEAS, OPSAWG, IVY, NMOP, and GREEN. " GV> This conflicts with earlier text implying CCAMP ownership by work scope. Please clarify responsibilities and the boundary with LSR at relevant places. Be well, Thanks, G/ Routing AD |
|
2026-04-01
|
08-03 | Gunter Van de Velde | [Ballot Position Update] Position for Gunter Van de Velde has been changed to No Objection from Block |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Deleted charter milestone "Submit DWDM interface LMP and YANG to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit DWDM interface LMP and YANG to IESG for review", set description to "Submit DWDM interface LMP and YANG to IESG for … Changed charter milestone "Submit DWDM interface LMP and YANG to IESG for review", set description to "Submit DWDM interface LMP and YANG to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit Data model for OTN end WDM path computation to IESG for review", set description to "Submit Data model for OTN end … Changed charter milestone "Submit Data model for OTN end WDM path computation to IESG for review", set description to "Submit Data model for OTN end WDM path computation to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit Data Model for Ethernet topology to IESG for review", set description to "Submit Data Model for Ethernet topology to IESG for … Changed charter milestone "Submit Data Model for Ethernet topology to IESG for review", set description to "Submit Data Model for Ethernet topology to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit client signal YANG model to IESG for review", set description to "Submit client signal YANG model to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit Data Modelling and Gap Analysis of Optical Pluggables in Packet Over Optical Network to IESG for review", set description to "Submit … Changed charter milestone "Submit Data Modelling and Gap Analysis of Optical Pluggables in Packet Over Optical Network to IESG for review", set description to "Submit Data Modelling and Gap Analysis of Optical Pluggables in Packet Over Optical Network to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit YANG Data Model for FlexE Management to IESG for review", set description to "Submit YANG Data Model for FlexE Management to … Changed charter milestone "Submit YANG Data Model for FlexE Management to IESG for review", set description to "Submit YANG Data Model for FlexE Management to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit DWDM interface LMP and YANG to IESG for review", set description to "Submit DWDM interface LMP and YANG to IESG for … Changed charter milestone "Submit DWDM interface LMP and YANG to IESG for review", set description to "Submit DWDM interface LMP and YANG to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit OTN slicing YANG model to IESG for review", set description to "Submit OTN slicing YANG model to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit OTN tunnel model to IESG for review", set description to "Submit OTN tunnel model to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit YANG model of OTN topology & Flexi-grid topology to IESG for review", set description to "Submit YANG model of OTN topology … Changed charter milestone "Submit YANG model of OTN topology & Flexi-grid topology to IESG for review", set description to "Submit YANG model of OTN topology & Flexi-grid topology to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone ""Submit Integrating YANG Configuration and Management into an ACTN System for Optical Networks to IESG for review", set description to "Submit Integrating … Changed charter milestone ""Submit Integrating YANG Configuration and Management into an ACTN System for Optical Networks to IESG for review", set description to "Submit Integrating YANG Configuration and Management into an ACTN System for Optical Networks to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit T-NBI model applicability to IESG for review", set description to "Submit T-NBI model applicability to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit WDM tunnel model to IESG for review", set description to "Submit WDM tunnel model to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit YANG modelling for flexi grid draft to IESG for review", set description to "Submit YANG modelling for flexi grid draft to … Changed charter milestone "Submit YANG modelling for flexi grid draft to IESG for review", set description to "Submit YANG modelling for flexi grid draft to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit Transceiver-Related Information within RSVP-TE Signaling to IESG for review", set description to "Submit Transceiver-Related Information within RSVP-TE Signaling to IESG for … Changed charter milestone "Submit Transceiver-Related Information within RSVP-TE Signaling to IESG for review", set description to "Submit Transceiver-Related Information within RSVP-TE Signaling to IESG for publication" |
|
2026-04-01
|
08-03 | Ketan Talaulikar | Changed charter milestone "Submit DWDM Interface YANG model to IESG for review", set description to "Submit DWDM Interface YANG model to IESG for publication" |
|
2026-04-01
|
08-03 | Gunter Van de Velde | [Ballot block] Hi all, Please find my comments on the proposed charter. The current charter already covers CCAMP’s scope well, however I would like clearer … [Ballot block] Hi all, Please find my comments on the proposed charter. The current charter already covers CCAMP’s scope well, however I would like clearer wording on the boundary with LSR. I do not assume CCAMP will define new IGP TLVs, as this is within LSR’s scope. The text also suggests using IS-IS/OSPF to flood non-routing information. If that is intended, it should be discussed with LSR. The IGP is an foundational underlay technology; adding non-routing data impacts the LSDB, flooding, and stability. Some observations from the newly proposed Charter: " - Functional specification of extensions for GMPLS-related routing (OSPF, IS-IS) and signaling (RSVP-TE) protocols required for path establishment and maintenance in non-packet technology-specific networks. " GV> Any new OSPF/IS-IS procedures should be defined with LSR. It would help to list which extensions CCAMP owns and how joint work with LSR is handled. " - Define how the properties of network resources gathered by a measurement protocol (or by other means such as configuration) can be distributed in existing routing protocols, such as OSPF, IS-IS, and BGP-LS. " GV> Using IGPs to distribute non-routing properties tends to be avoided by IGPs. It is not what IGPs were originally designed for. This needs clearer scope, requirements, and alignment with LSR. " - Maintenance of specifications related to protocol extensions and data models for non-packet technology-specific networks (Ethernet, TDM, OTN) published by CCAMP. This includes extensions to RSVP-TE, OSPF, IS-IS, and Link Management Protocol (LMP). " GV> Does this imply CCAMP owns extensions to these protocols instead of LSR? " Coordination: The protocol extension work (especially definition of protocol formats and procedures) done in the WG will be done either jointly or in coordination with the WGs such as LSR and TEAS WGs that maintain those base protocols (viz. OSPF, IS-IS, and RSVP-TE). The WG will coordinate with the TEAS WG on all aspects related to TE and specifically to determine whether such protocol extensions should be generalized for TE in any network. The WG will coordinate with the PCE WG when it comes to the Path Computation Element Protocol (PCEP) and path computation aspects in non-packet technology-specific networks. Data model design will be coordinated with other related WGs, such as TEAS, OPSAWG, IVY, NMOP, and GREEN. " GV> This conflicts with earlier text implying CCAMP ownership by work scope. Please clarify responsibilities and the boundary with LSR at relevant places. Be well, Thanks, G/ Routing AD |
|
2026-04-01
|
08-03 | Gunter Van de Velde | [Ballot Position Update] New position, Block, has been recorded for Gunter Van de Velde |
|
2026-03-31
|
08-03 | Mahesh Jethanandani | [Ballot comment] "WG", paragraph 0 > ##Work scope: > CCAMP WG work scope includes: > - Definition of protocol-independent metrics and parameters (measurement > attributes) … [Ballot comment] "WG", paragraph 0 > ##Work scope: > CCAMP WG work scope includes: > - Definition of protocol-independent metrics and parameters (measurement > attributes) for describing links and paths that are required for routing and > signaling in non-packet technology-specific networks. These will be developed > in conjunction with requests and requirements from other WGs to ensure overall > usefulness. - Functional specification of extensions for GMPLS-related routing > (OSPF, IS-IS) and signaling (RSVP-TE) protocols required for path establishment > and maintenance in non-packet technology-specific networks. - Description of > non-packet-specific aspects of TE including for multi-area/multi-AS/multi-layer > scenarios and definition of protocol extensions for them. - Define how the > properties of network resources gathered by a measurement protocol (or by other > means such as configuration) can be distributed in existing routing protocols, > such as OSPF, IS-IS, and BGP-LS. - Necessary protocol extensions to support > data planes standardized outside the IETF (e.g. ITU-T), where such extensions > fall within the established architectural scope of the WG. This work will be > performed in coordination with the relevant SDOs. The definition, modification, > or evolution of the data plane itself is out of scope. - Definition of > technology-specific data models for network control and management of > non-packet technology-specific networks, including network representation (from > network, connection, and service perspectives) and management functionalities. > - Definition of management objects (e.g., as part YANG data models) and control > of OAM techniques relevant to the protocols and extensions specified within the > WG in alignment with OAM specifications developed by other WGs. - The > applicability of Abstraction and Control of Traffic Engineering (TE) Networks > (ACTN) for non-packet technology networks. The approved charter (08) explicitly listed Link Management Protocol (LMP) maintenance as both a work scope item and a current focus item. The proposed charter removes LMP from both lists — it appears only parenthetically as "LMP" in the maintenance bullet of Current Focus. LMP is thus retained implicitly in Current Focus, but removed from Work Scope. This creates an inconsistency in my mind: if LMP maintenance is in Current Focus, it should be in Work Scope. More importantly, if the WG is intentionally reducing its LMP scope (e.g., because LMP maintenance activity has wound down), this should be stated explicitly. The milestone list still includes draft-ietf-ccamp-dwdm-if-lmp (twice), indicating active LMP work remains. The scope text should be reconciled with what the WG is actually doing. "PCE", paragraph 5 > Feb 2026 - Submit DWDM Interface YANG model to IESG for review > o draft-ietf-ccamp-dwdm-if-param-yang > > Mar 2026 - Adopt client tunnel YANG model working group draft > > Mar 2026 - Submit Transceiver-Related Information within RSVP-TE Signaling to IESG for > review > o draft-ietf-ccamp-tsvmode-signaling The proposed charter includes these three milestones: Past-dated milestones at the time of charter approval are not a blocking issue, but they should either be updated to reflect the actual state (e.g., "Completed" or given realistic future dates) or removed. Having multiple already-elapsed milestones makes the charter appear stale. "PCE", paragraph 16 > Jul 2027 - Submit Data Modelling and Gap Analysis of Optical Pluggables in Packet Over > Optical Network to IESG for review > o draft-ietf-ccamp-actn-poi-pluggable-usecases-gaps Isn't this a gap analysis/use-case document, and not a protocol or data model specification? The charter should be clearer about what normative deliverables are expected from this new work area. "PCE", paragraph 19 > Jun 2028 - Submit DWDM interface LMP and YANG to IESG for review > o draft-ietf-ccamp-dwdm-if-lmp The milestone list contains draft-ietf-ccamp-dwdm-if-lmp twice: Here and as May 2027: "Submit DWDM interface LMP and YANG to IESG for review". Is this a cut-and-paste error? |
|
2026-03-31
|
08-03 | Mahesh Jethanandani | [Ballot Position Update] New position, No Objection, has been recorded for Mahesh Jethanandani |
|
2026-03-31
|
08-03 | Mohamed Boucadair | [Ballot comment] Hi all, Assuming [1], this version looks good to me. I have only nitty nits this round: # Format parallelism OLD: Overview: … [Ballot comment] Hi all, Assuming [1], this version looks good to me. I have only nitty nits this round: # Format parallelism OLD: Overview: .. Work scope: .. Current Focus .. Coordination: NEW: Overview .. Work scope .. Current Focus .. Coordination Or NEW: Overview: .. Work scope: .. Current Focus: .. Coordination: # Publication is the goal, not the review per se All "Submit xxx to IESG for review” constructs should be "Submit xxx to IESG for publication”. Cheers, Med [1] https://mailarchive.ietf.org/arch/msg/ccamp/abha9feKn_3mm17sLf0zFaFPja4/ |
|
2026-03-31
|
08-03 | Mohamed Boucadair | [Ballot Position Update] New position, Yes, has been recorded for Mohamed Boucadair |
|
2026-03-30
|
08-03 | Jim Guichard | [Ballot Position Update] New position, No Objection, has been recorded for Jim Guichard |
|
2026-03-26
|
08-03 | Ketan Talaulikar | [Ballot Position Update] New position, Yes, has been recorded for Ketan Talaulikar |
|
2026-03-24
|
08-03 | Andy Newton | [Ballot Position Update] New position, No Objection, has been recorded for Andy Newton |
|
2026-03-05
|
08-03 | Morgan Condie | Telechat date has been changed to 2026-04-02 (Previous date was 2026-03-05) |
|
2026-03-05
|
08-03 | Morgan Condie | Created "Approve" ballot |
|
2026-03-05
|
08-03 | Morgan Condie | Closed "Ready for external review" ballot |
|
2026-03-05
|
08-03 | Morgan Condie | State changed to External Review (Message to Community, Selected by Secretariat) from Start Chartering/Rechartering (Internal Steering Group/IAB Review) |
|
2026-03-05
|
08-03 | Morgan Condie | WG new work message text was changed |
|
2026-03-05
|
08-03 | Morgan Condie | WG review text was changed |
|
2026-03-05
|
08-03 | Morgan Condie | WG review text was changed |
|
2026-03-05
|
08-03 | Morgan Condie | WG review text was changed |
|
2026-03-05
|
08-03 | Roman Danyliw | [Ballot Position Update] Position for Roman Danyliw has been changed to No Objection from Block |
|
2026-03-05
|
08-03 | Mohamed Boucadair | [Ballot comment] Hi all, Thanks for the changes made so far [1]. These are good ones as it insists that the models are technology-specific. Ketan's … [Ballot comment] Hi all, Thanks for the changes made so far [1]. These are good ones as it insists that the models are technology-specific. Ketan's proposal [2] makes sense to me. Cheers, Med [1] https://author-tools.ietf.org/iddiff?url1=https%3A%2F%2Fdatatracker.ietf.org%2Fdoc%2Fcharter-ietf-ccamp%2Fwithmilestones-08-02.txt&url2=https%3A%2F%2Fdatatracker.ietf.org%2Fdoc%2Fcharter-ietf-ccamp%2Fwithmilestones-08-03.txt&difftype=--hwdiff [2] https://mailarchive.ietf.org/arch/msg/ccamp/abha9feKn_3mm17sLf0zFaFPja4/ |
|
2026-03-05
|
08-03 | Mohamed Boucadair | [Ballot Position Update] Position for Mohamed Boucadair has been changed to Yes from Block |
|
2026-03-05
|
08-03 | Ketan Talaulikar | New version available: charter-ietf-ccamp-08-03.txt |
|
2026-03-04
|
08-02 | Roman Danyliw | [Ballot block] Is it possible to make the following work scope more specific as it would seem to enable arbitrary protocol extensions as long as … [Ballot block] Is it possible to make the following work scope more specific as it would seem to enable arbitrary protocol extensions as long as the specification comes from another SDO: "- Protocol work to support data planes that have already been approved by another Standards Development Organizations (SDOs) (e.g., the ITU-T). However, the specification or modification of data planes is out of scope of this WG." |
|
2026-03-04
|
08-02 | Roman Danyliw | [Ballot Position Update] New position, Block, has been recorded for Roman Danyliw |
|
2026-03-04
|
08-02 | Jim Guichard | [Ballot Position Update] New position, No Objection, has been recorded for Jim Guichard |
|
2026-03-04
|
08-02 | Paul Wouters | [Ballot Position Update] New position, No Objection, has been recorded for Paul Wouters |
|
2026-03-02
|
08-02 | Ketan Talaulikar | Changed charter milestone "First version of client signal performance monitoring YANG model working group draft", set description to "Adopt client signal performance monitoring YANG model … Changed charter milestone "First version of client signal performance monitoring YANG model working group draft", set description to "Adopt client signal performance monitoring YANG model working group draft", removed draft-zheng-ccamp-client-pm-yang from milestone |
|
2026-03-02
|
08-02 | Ketan Talaulikar | Changed charter milestone "First version of YANG model of Ethernet Tunnel Working Group drafts", set description to "Adopt YANG model of Ethernet Tunnel Working Group … Changed charter milestone "First version of YANG model of Ethernet Tunnel Working Group drafts", set description to "Adopt YANG model of Ethernet Tunnel Working Group draft", removed draft-zheng-ccamp-client-tunnel-yang from milestone |
|
2026-03-02
|
08-02 | Ketan Talaulikar | Changed charter milestone "First version of client tunnel YANG model working group draft", set description to "Adopt client tunnel YANG model working group draft", removed … Changed charter milestone "First version of client tunnel YANG model working group draft", set description to "Adopt client tunnel YANG model working group draft", removed draft-zheng-ccamp-client-tunnel-yang from milestone |
|
2026-03-02
|
08-02 | Mahesh Jethanandani | [Ballot comment] > Definition of data models > and management objects for network control and management of non-packet > technology-specific network elements, topologies, and abstractions. … [Ballot comment] > Definition of data models > and management objects for network control and management of non-packet > technology-specific network elements, topologies, and abstractions. After discussing with Ketan, I am adding this as a note that the ONSEN BoF is scheduled for IETF 125. If that BoF results in the WG being formed, then the responsible ADs will come together to discuss how the work around data modules for abstraction will be handled as we advance. Separate from that, there is work around data modules for network topology that is already underway in the IVY WG. Therefore, it is not clear whether the topology work identified here is different from the work in IVY. ------------------------------------------------------------------------------- NIT ------------------------------------------------------------------------------- All comments below are about very minor potential issues that you may choose to address in some way - or ignore - as you see fit. Some were flagged by automated tools (via https://github.com/larseggert/ietf-reviewtool), so there will likely be some false positives. There is no need to let me know what you did with these suggestions. "YANG", paragraph 2 > as standards track RFCs with an exception of a few documents (e.g., architec > ^^^^^^^^^^^^ The usual collocation for "exception" in this context is "to", not "of". Did you mean "exception to"? |
|
2026-03-02
|
08-02 | Mahesh Jethanandani | [Ballot Position Update] New position, No Objection, has been recorded for Mahesh Jethanandani |
|
2026-03-02
|
08-02 | Mohamed Boucadair | [Ballot block] Hi all, Thank you for preparing this charter refresh. The proposed updates looks good, overall. However, there is one point that I think … [Ballot block] Hi all, Thank you for preparing this charter refresh. The proposed updates looks good, overall. However, there is one point that I think needs some discussion: # Abstractions CURRENT: * Definition of data models for network control and management of non-packet technology-specific networks, including network representation (from network, connection, and service perspectives) and management functionalities. .. * Definition of data models and management objects for network control and management of non-packet technology-specific network elements, topologies, and abstractions. As you know, there is an ongoing effort to have a single group in the IETF (ONSEN BoF) to be the focal point for service and network abstractions within the IETF. Also, that is motivated by having more emphasis on operational needs of such abstractions. I appreciate that group is not on rails yet, but I think this is worth careful consideration. |
|
2026-03-02
|
08-02 | Mohamed Boucadair | [Ballot comment] # How to interpret the following? CURRENT: Mar 2026 - First version of client tunnel YANG model working group draft … [Ballot comment] # How to interpret the following? CURRENT: Mar 2026 - First version of client tunnel YANG model working group draft o draft-zheng-ccamp-client-tunnel-yang Apr 2026 - First version of YANG model of Ethernet Tunnel Working Group drafts o draft-zheng-ccamp-client-tunnel-yang Jul 2026 - First version of client signal performance monitoring YANG model working group draft o draft-zheng-ccamp-client-pm-yang Does the WG plan to use these Individual I-Ds as WG documents straight? If that’s not the intent, then consider unlink the drafts from these milestones. ## Also, I guess by “first version” you meant adoption by the WG. If so, please consider updating these to say that. |
|
2026-03-02
|
08-02 | Mohamed Boucadair | [Ballot Position Update] New position, Block, has been recorded for Mohamed Boucadair |
|
2026-02-21
|
08-02 | Erik Kline | [Ballot Position Update] New position, No Objection, has been recorded for Erik Kline |
|
2026-02-17
|
08-02 | Morgan Condie | Telechat date has been changed to 2026-03-05 (Previous date was 2026-02-19) |
|
2026-02-17
|
08-02 | Ketan Talaulikar | Telechat date has been changed to 2026-02-19 (Previous date was 2022-05-05) |
|
2026-02-17
|
08-02 | Ketan Talaulikar | [Ballot Position Update] New position, Yes, has been recorded for Ketan Talaulikar |
|
2026-02-17
|
08-02 | Ketan Talaulikar | WG action text was changed |
|
2026-02-17
|
08-02 | Ketan Talaulikar | WG review text was changed |
|
2026-02-17
|
08-02 | Ketan Talaulikar | WG review text was changed |
|
2026-02-17
|
08-02 | Ketan Talaulikar | Created "Ready for external review" ballot |
|
2026-02-17
|
08-02 | Ketan Talaulikar | Closed "Ready for external review" ballot |
|
2026-02-17
|
08-02 | Ketan Talaulikar | State changed to Start Chartering/Rechartering (Internal Steering Group/IAB Review) from Draft Charter |
|
2026-02-17
|
08-02 | Ketan Talaulikar | State changed to Draft Charter from Start Chartering/Rechartering (Internal Steering Group/IAB Review) |
|
2026-02-17
|
08-02 | Ketan Talaulikar | New version available: charter-ietf-ccamp-08-02.txt |
|
2025-12-21
|
08-01 | Ketan Talaulikar | Added charter milestone "Submit Data model for OTN end WDM path computation to IESG for review", due January 2028 |
|
2025-12-21
|
08-01 | Ketan Talaulikar | Added charter milestone "Submit Data Model for Ethernet topology to IESG for review", due November 2027 |
|
2025-12-21
|
08-01 | Ketan Talaulikar | Added charter milestone "Submit Data Modelling and Gap Analysis of Optical Pluggables in Packet Over Optical Network to IESG for review", due July 2027 |
|
2025-12-21
|
08-01 | Ketan Talaulikar | Added charter milestone "Submit YANG Data Model for FlexE Management to IESG for review", due July 2027 |
|
2025-12-21
|
08-01 | Ketan Talaulikar | Added charter milestone "Submit DWDM interface LMP and YANG to IESG for review", due May 2027 |
|
2025-12-21
|
08-01 | Ketan Talaulikar | Added charter milestone ""Submit Integrating YANG Configuration and Management into an ACTN System for Optical Networks to IESG for review", due October 2026 |
|
2025-12-21
|
08-01 | Ketan Talaulikar | Added charter milestone "Submit WDM tunnel model to IESG for review", due July 2026 |
|
2025-12-21
|
08-01 | Ketan Talaulikar | Added charter milestone "Submit Transceiver-Related Information within RSVP-TE Signaling to IESG for review", due March 2026 |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit DWDM interface LMP and YANG to IESG for review", due June 2028, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit client signal YANG model to IESG for review", due October 2027, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit OTN slicing YANG model to IESG for review", due March 2027, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit OTN tunnel model to IESG for review", due January 2027, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit YANG model of OTN topology & Flexi-grid topology to IESG for review", due January 2027, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit T-NBI model applicability to IESG for review", due August 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "First version of client signal performance monitoring YANG model working group draft", due July 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit YANG modelling for flexi grid draft to IESG for review", due May 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "First version of YANG model of Ethernet Tunnel Working Group drafts", due April 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "First version of client tunnel YANG model working group draft", due March 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit DWDM Interface YANG model to IESG for review", due February 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit client signal YANG model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit DWDM interface LMP and YANG to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit OTN slicing YANG model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit OTN tunnel model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit YANG model of OTN topology & Flexi-grid topology to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit T-NBI model applicability to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "First version of client signal performance monitoring YANG model working group draft" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit YANG modelling for flexi grid draft to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "First version of YANG model of Ethernet Tunnel Working Group drafts" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "First version of client tunnel YANG model working group draft" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit DWDM Interface YANG model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit client signal YANG model to IESG for review", due October 2027, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit DWDM interface LMP and YANG to IESG for review", due May 2027, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit OTN slicing YANG model to IESG for review", due March 2027, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit OTN tunnel model to IESG for review", due January 2027, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit YANG model of OTN topology & Flexi-grid topology to IESG for review", due January 2027, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit T-NBI model applicability to IESG for review", due August 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "First version of client signal performance monitoring YANG model working group draft", due July 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit YANG modelling for flexi grid draft to IESG for review", due May 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "First version of YANG model of Ethernet Tunnel Working Group drafts", due April 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "First version of client tunnel YANG model working group draft", due March 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Added milestone "Submit DWDM Interface YANG model to IESG for review", due February 2026, from current group milestones |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit client signal YANG model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit DWDM interface LMP and YANG to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit OTN slicing YANG model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit YANG model of WSON Impairment Topology YANG model to IESG for review;" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit Info Model for WSON with impairments validation to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit Microwave topology model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit OTN tunnel model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "First version of client signal performance monitoring YANG model working group draft" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit DWDM Interface YANG model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "First version of client tunnel YANG model working group draft" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit L1CSM YANG model to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit YANG model of OTN topology & Flexi-grid topology to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit YANG model of Layer 1 Types to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "First version of YANG model of Ethernet Tunnel Working Group drafts" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit T-NBI model applicability to IESG for review" |
|
2025-12-18
|
08-01 | Ketan Talaulikar | Deleted milestone "Submit YANG modelling for flexi grid draft to IESG for review" |
|
2025-04-09
|
08-01 | Liz Flynn | Responsible AD changed to Ketan Talaulikar from John Scudder |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit client signal YANG model to IESG for review", due August 2023, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit DWDM interface LMP and YANG to IESG for review", due March 2023, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit OTN slicing YANG model to IESG for review", due February 2023, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit YANG model of WSON Impairment Topology YANG model to IESG for review;", due December 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit Info Model for WSON with impairments validation to IESG for review", due December 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit Microwave topology model to IESG for review", due November 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit OTN tunnel model to IESG for review", due November 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "First version of client signal performance monitoring YANG model working group draft", due October 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit DWDM Interface YANG model to IESG for review", due September 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "First version of client tunnel YANG model working group draft", due August 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit L1CSM YANG model to IESG for review", due August 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit YANG model of OTN topology & Flexi-grid topology to IESG for review", due July 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit YANG model of Layer 1 Types to IESG for review", due July 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "First version of YANG model of Ethernet Tunnel Working Group drafts", due July 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit T-NBI model applicability to IESG for review", due June 2022, from current group milestones |
|
2023-10-27
|
08-01 | John Scudder | Added milestone "Submit YANG modelling for flexi grid draft to IESG for review", due May 2022, from current group milestones |
|
2022-05-05
|
08-01 | Andrew Alston | [Ballot comment] No objection to this, but I do agree with Eric that an expansion of some of the acronyms may be useful - purely … [Ballot comment] No objection to this, but I do agree with Eric that an expansion of some of the acronyms may be useful - purely for people who are looking for working groups they may be interested in joining and partaking it and who don't wanna have to jump through hoops trying to figure out all the acryonyms in the charter :) |
|
2022-05-05
|
08-01 | Andrew Alston | [Ballot Position Update] New position, No Objection, has been recorded for Andrew Alston |
|
2022-05-05
|
08-01 | Francesca Palombini | [Ballot Position Update] New position, No Objection, has been recorded for Francesca Palombini |
|
2022-05-04
|
08-01 | Murray Kucherawy | [Ballot Position Update] New position, No Objection, has been recorded for Murray Kucherawy |
|
2022-05-03
|
08-01 | Lars Eggert | [Ballot Position Update] New position, No Objection, has been recorded for Lars Eggert |
|
2022-05-03
|
08-01 | Roman Danyliw | [Ballot comment] Please add milestones |
|
2022-05-03
|
08-01 | Roman Danyliw | [Ballot Position Update] New position, No Objection, has been recorded for Roman Danyliw |
|
2022-05-03
|
08-01 | Paul Wouters | [Ballot Position Update] New position, Yes, has been recorded for Paul Wouters |
|
2022-05-03
|
08-01 | Zaheduzzaman Sarker | [Ballot comment] The term "network slicing" was not mentioned in the descriptive part of the charter however it is in the working group scope. To … [Ballot comment] The term "network slicing" was not mentioned in the descriptive part of the charter however it is in the working group scope. To understand the scope better one need to understand the term better. I would suggest to be more descriptive about it so the scope is better understood. |
|
2022-05-03
|
08-01 | Zaheduzzaman Sarker | [Ballot Position Update] New position, No Objection, has been recorded for Zaheduzzaman Sarker |
|
2022-05-03
|
08-01 | Alvaro Retana | [Ballot Position Update] New position, No Objection, has been recorded for Alvaro Retana |
|
2022-05-02
|
08-01 | John Scudder | [Ballot Position Update] New position, Yes, has been recorded for John Scudder |
|
2022-05-02
|
08-01 | Martin Duke | [Ballot Position Update] New position, No Objection, has been recorded for Martin Duke |
|
2022-05-02
|
08-01 | Éric Vyncke | [Ballot comment] I understand that this revised charter is based on the existing -08 and inherits therefore some nits: - many acronyms are not expanded … [Ballot comment] I understand that this revised charter is based on the existing -08 and inherits therefore some nits: - many acronyms are not expanded (they do not need because they are in the RFC editor list but I had to jump to that list to understand), unsure whether OEO, ROADM, ... are really useful and current - the use of "measurement" is also weird in this case but too late to change I guess ;-) - s/been approved by another Standards Development Organization/been specified by another Standards Development Organization/ ? - nit: sometimes it is IS-IS, other times it is ISIS ;-) - s/The CCAMP WG currently works/The CCAMP WG is tasked to work/ ? All in all, no objection as the rechartering appears more like a refresh/cleanup of the existing charter. But, this is really a broad scope WG. |
|
2022-05-02
|
08-01 | Éric Vyncke | Ballot comment text updated for Éric Vyncke |
|
2022-05-02
|
08-01 | Éric Vyncke | [Ballot comment] I understand that this revised charter is based on the existing -08 and inherits therefore some nits: - many acronyms are not expanded … [Ballot comment] I understand that this revised charter is based on the existing -08 and inherits therefore some nits: - many acronyms are not expanded (they do not need because they are in the RFC editor list but I had to jump to that list to understand), unsure whether OEO, ROADM, ... are really useful and current - the use of "measurement" is also weird in this case but too late to change I guess ;-) - s/been approved by another Standards Development Organization/been specified by another Standards Development Organization/ ? - nit: sometimes it is IS-IS, other times it is ISIS ;-) - s/The CCAMP WG currently works/The CCAMP WG is tasked to work/ ? All in all, no objection has the rechartering appears more like a refresh/cleanup of the existing charter. But, this is really a broad scope WG. |
|
2022-05-02
|
08-01 | Éric Vyncke | [Ballot Position Update] New position, No Objection, has been recorded for Éric Vyncke |
|
2022-05-01
|
08-01 | Erik Kline | [Ballot Position Update] New position, No Objection, has been recorded for Erik Kline |
|
2022-04-25
|
08-01 | Cindy Morgan | Telechat date has been changed to 2022-05-05 from 2014-12-04 |
|
2022-04-25
|
08-01 | John Scudder | WG action text was changed |
|
2022-04-25
|
08-01 | John Scudder | WG review text was changed |
|
2022-04-25
|
08-01 | John Scudder | WG review text was changed |
|
2022-04-25
|
08-01 | John Scudder | Created "Ready for external review" ballot |
|
2022-04-25
|
08-01 | John Scudder | Other than formatting (whitespace, etc) the change to the charter is: OLD: Data plane: This work will document how to use IP and/or MPLS, and … Other than formatting (whitespace, etc) the change to the charter is: OLD: Data plane: This work will document how to use IP and/or MPLS, and related OAM, to support a data plane method of flow identification and packet forwarding over Layer 3. Other IETF defined data plane technologies may also be used. NEW: Data plane: This work will document how to use IP and/or MPLS, and related OAM, to support a data plane method of flow identification, and packet treatment (including, for example, forwarding, service protection, and queuing) over Layer 3. Other IETF defined data plane technologies may also be used. The most immediate effect of this is to put queueing in-charter for DETNET. |
|
2022-04-25
|
08-01 | John Scudder | State changed to Start Chartering/Rechartering (Internal Steering Group/IAB Review) from Draft Charter |
|
2021-04-27
|
08-01 | John Scudder | New version available: charter-ietf-ccamp-08-01.txt |
|
2021-04-26
|
08-00 | John Scudder | Text from daniele.ceccarelli=40ericsson.com@dmarc.ietf.org April 13, 2021. |
|
2021-04-26
|
08-00 | John Scudder | State changed to Draft Charter from Approved |
|
2021-04-26
|
08-00 | John Scudder | New version available: charter-ietf-ccamp-08-00.txt |
|
2021-03-10
|
08 | Cindy Morgan | Responsible AD changed to John Scudder from Deborah Brungard |
|
2018-01-30
|
08 | Amy Vezza | Responsible AD changed to Deborah Brungard from Adrian Farrel |
|
2014-12-05
|
08 | Cindy Morgan | New version available: charter-ietf-ccamp-08.txt |
|
2014-12-05
|
08 | Cindy Morgan | State changed to Approved from IESG review |
|
2014-12-05
|
08 | Cindy Morgan | IESG has approved the charter |
|
2014-12-05
|
08 | Cindy Morgan | Closed "Approve" ballot |
|
2014-12-05
|
08 | Cindy Morgan | Closed "Ready for external review" ballot |
|
2014-12-05
|
07-03 | Cindy Morgan | WG action text was changed |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit impairments related solutions for IESG review", due March 2015, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Recharter or close Working Group", due November 2014, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit MPLS-TP Association to IESG", due June 2014, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First versions of impairments related solutions Working Group drafts", due March 2014, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit final OAM configuration solutions for IESG review", due January 2014, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version GMPLS E-NNI Working Group draft", due January 2014, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit WSON signaling related draft for IESG review", due December 2013, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit WSON routing related drafts for IESG review", due December 2013, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit first set of OAM configuration solutions for IESG review", due November 2013, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit last OAM configuration solutions for IESG review", due November 2013, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version flexigrid requirements/framework Working Group draft", due April 2013, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit G.709 enhancements solutions for IESG review", due November 2012, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit G.709 enhancements framework for IESG review", due November 2012, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit LMP Negotiation for IESG review", due October 2012, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit OAM configuration framework for IESG review", due October 2012, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit RSVP-TE extensions for MPLS-TP for IESG review", due March 2011, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit Control Plane Framework for MPLS-TP for IESG review", due December 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version of Working Group draft defining RSVP-TE extensions for MPLS-TP", due September 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version of G.709 enhancements solutions Working Group drafts", due August 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version of OAM configuration solutions Working Group draft", due May 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit WSON impairment framework draft for IESG review", due May 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit WSON framework draft for IESG review", due May 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit Lambda labels draft for IESG review", due May 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit VCAT/LCAS with GMPLS for IESG review", due April 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit TE MIB module IESG review", due April 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version of Working Group draft providing Control Plane Framework for MPLS-TP", due April 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version of G.709 enhancements framework Working Group drafts", due April 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version of LMP Negotiation Working Group draft", due April 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit hierarchy bis for IESG review", due March 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit Ethernet related drafts for IESG review", due March 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version of WSON routing related Working Group drafts", due March 2010, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit Protocol solutions for MLN/MRN I-D for IESG review", due February 2009, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG I-Ds for GMPLS source-controlled and explicitly-routed Ethernet networks", due December 2007, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit Informational I-D for Analysis of inter-domain issues for disjoint and protected paths for IESG review", due December 2007, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit Evaluation of existing protocols for MLN/MRN for IESG review", due February 2007, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit MPLS-GMPLS interworking requirements and solutions I-D for IESG review", due January 2007, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit Requirements for Multi-Layer and Multi-Region Networks I-D for IESG review", due December 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit MPLS to GMPLS migration strategies I-D for IESG review", due October 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit GMPLS routing and signaling interoperability advice I-D for IESG review", due April 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG I-D GMPLS OAM Requirements", due March 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit I-D for Automatic discovery of MPLS-TE mesh membership for IESG review", due March 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG I-D MPLS-GMPLS interworking requirements and solutions", due February 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit LSP Stitching I-D for IESG review", due February 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit GMPLS/ASON lexicography I-D for IESG review", due February 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG Informational I-D for Analysis of inter-domain issues for disjoint and protected paths", due January 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version of WG I-D for OSPF-TE/GMPLS MIB module", due January 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG I-D for Protocol solutions for MLN/MRN", due January 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit I-D for Advertising TE Node Capabilities in ISIS and OSPF for IESG review", due January 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit GMPLS signaling in support of Call Management I-D for IESG review", due January 2006, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG I-D for Evaluation of existing protocols for MLN/MRN", due December 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG I-D Requirements for Multi-Layer and Multi-Region Networks", due December 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version of WG I-D for ASON Routing solutions", due December 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit Per-domain path computation signaling I-D for IESG review", due December 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit RSVP-TE extensions for inter-domain signaling I-D for IESG review", due December 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG I-D MPLS to GMPLS migration strategies", due November 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Cross-WG review of I-D for Advertising TE Node Capabilities in ISIS and OSPF", due November 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit ASON Routing evaluation I-D for IESG review", due November 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG I-D for Automatic discovery of MPLS-TE mesh membership", due October 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "First version WG I-D for Advertising TE Node Capabilities in ISIS and OSPF", due October 2005, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit revised charter and milestones to IESG for IESG consideration of more detailed deliverables and determination of usefulness of continuation of WG", due … Added milestone "Submit revised charter and milestones to IESG for IESG consideration of more detailed deliverables and determination of usefulness of continuation of WG", due March 2004, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit ASON routing requirements doc to IESG", due January 2004, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Produce CCAMP WG document for generic tunnel tracing protocol", due January 2004, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Produce CCAMP WG document for multi-area/AS signaling and routing", due January 2004, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit ASON signaling requirements doc to IESG", due December 2003, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit protection & restoration documents to IESG", due December 2003, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit GMPLS MIBs to IESG", due December 2003, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit LMP MIB to IESG", due November 2003, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit WG document defining common measurement plane protocol", due May 2001, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Submit WG document defining path setup portions of common control plane protocol", due May 2001, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Build appropriate design teams", due March 2001, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Identify and document a limited set of candidate solutions for signalling and for measurement. Among candidate control solutions to be considered are the … Added milestone "Identify and document a limited set of candidate solutions for signalling and for measurement. Among candidate control solutions to be considered are the existing GMPLS drafts.", due February 2001, from current group milestones |
|
2014-12-05
|
07-03 | Cindy Morgan | Added milestone "Post strawman WG goals and charter", due February 2001, from current group milestones |
|
2014-12-04
|
07-03 | Kathleen Moriarty | [Ballot Position Update] New position, No Objection, has been recorded for Kathleen Moriarty |
|
2014-12-04
|
07-03 | Ted Lemon | [Ballot Position Update] New position, No Objection, has been recorded for Ted Lemon |
|
2014-12-04
|
07-03 | Stephen Farrell | [Ballot Position Update] New position, No Objection, has been recorded for Stephen Farrell |
|
2014-12-04
|
07-03 | Jari Arkko | [Ballot Position Update] New position, No Objection, has been recorded for Jari Arkko |
|
2014-12-03
|
07-03 | Joel Jaeggli | [Ballot Position Update] New position, No Objection, has been recorded for Joel Jaeggli |
|
2014-12-03
|
07-03 | Spencer Dawkins | [Ballot Position Update] New position, No Objection, has been recorded for Spencer Dawkins |
|
2014-12-03
|
07-03 | Richard Barnes | [Ballot Position Update] New position, No Objection, has been recorded for Richard Barnes |
|
2014-12-03
|
07-03 | Alia Atlas | [Ballot Position Update] New position, Yes, has been recorded for Alia Atlas |
|
2014-12-03
|
07-03 | Alissa Cooper | [Ballot Position Update] New position, No Objection, has been recorded for Alissa Cooper |
|
2014-12-03
|
07-03 | Pete Resnick | [Ballot Position Update] New position, No Objection, has been recorded for Pete Resnick |
|
2014-12-03
|
07-03 | Brian Haberman | [Ballot Position Update] New position, No Objection, has been recorded for Brian Haberman |
|
2014-12-03
|
07-03 | Benoît Claise | [Ballot Position Update] New position, No Objection, has been recorded for Benoit Claise |
|
2014-12-03
|
07-03 | Barry Leiba | [Ballot Position Update] New position, No Objection, has been recorded for Barry Leiba |
|
2014-12-02
|
07-03 | Adrian Farrel | [Ballot Position Update] New position, Yes, has been recorded for Adrian Farrel |
|
2014-12-02
|
07-03 | Adrian Farrel | Created "Approve" ballot |
|
2014-12-02
|
07-03 | Adrian Farrel | State changed to IESG review from External review |
|
2014-11-25
|
07-03 | Cindy Morgan | Telechat date has been changed to 2014-12-04 from 2014-11-25 |
|
2014-11-25
|
07-03 | Cindy Morgan | State changed to External review from Internal review |
|
2014-11-25
|
07-03 | Cindy Morgan | WG review text was changed |
|
2014-11-25
|
07-02 | Cindy Morgan | WG review text was changed |
|
2014-11-25
|
07-02 | Jari Arkko | [Ballot Position Update] New position, No Objection, has been recorded for Jari Arkko |
|
2014-11-25
|
07-03 | Adrian Farrel | New version available: charter-ietf-ccamp-07-03.txt |
|
2014-11-25
|
07-02 | Benoît Claise | [Ballot comment] OLD: Definition of management objects (e.g., as part of MIB modules or YANG models) and control of OAM techniques relevant to … [Ballot comment] OLD: Definition of management objects (e.g., as part of MIB modules or YANG models) and control of OAM techniques relevant to the protocols and extensions specified within the WG. NEW: Definition of management objects (e.g., as part of MIB modules or YANG models) and control of OAM techniques relevant to the protocols and extensions specified within the WG. The OAM work will be synchronized with the LIME WG |
|
2014-11-25
|
07-02 | Benoît Claise | Ballot comment text updated for Benoit Claise |
|
2014-11-25
|
07-02 | Benoît Claise | [Ballot Position Update] New position, No Objection, has been recorded for Benoit Claise |
|
2014-11-25
|
07-02 | Adrian Farrel | New version available: charter-ietf-ccamp-07-02.txt |
|
2014-11-25
|
07-01 | Martin Stiemerling | [Ballot Position Update] New position, No Objection, has been recorded for Martin Stiemerling |
|
2014-11-24
|
07-01 | Spencer Dawkins | [Ballot Position Update] New position, No Objection, has been recorded for Spencer Dawkins |
|
2014-11-24
|
07-01 | Ted Lemon | [Ballot Position Update] New position, No Objection, has been recorded for Ted Lemon |
|
2014-11-24
|
07-01 | Richard Barnes | [Ballot Position Update] New position, No Objection, has been recorded for Richard Barnes |
|
2014-11-24
|
07-01 | Kathleen Moriarty | [Ballot Position Update] New position, No Objection, has been recorded for Kathleen Moriarty |
|
2014-11-24
|
07-01 | Alissa Cooper | [Ballot Position Update] New position, No Objection, has been recorded for Alissa Cooper |
|
2014-11-24
|
07-01 | Stephen Farrell | [Ballot Position Update] New position, No Objection, has been recorded for Stephen Farrell |
|
2014-11-24
|
07-01 | Adrian Farrel | New version available: charter-ietf-ccamp-07-01.txt |
|
2014-11-24
|
07-00 | Alia Atlas | [Ballot Position Update] New position, Yes, has been recorded for Alia Atlas |
|
2014-11-24
|
07-00 | Pete Resnick | [Ballot comment] The fifth bullet strikes me as a bit odd: - Determine non-packet-specific aspects of traffic engineering including for multi-areas/multi-AS/multi-layer scenarios in … [Ballot comment] The fifth bullet strikes me as a bit odd: - Determine non-packet-specific aspects of traffic engineering including for multi-areas/multi-AS/multi-layer scenarios in cooperation with the TEAS and PCE working groups. "Determine" is a weird verb for a work items. Do you mean "Develop protocols for non-packet-specific aspects of TE", or do you mean something else? |
|
2014-11-24
|
07-00 | Pete Resnick | [Ballot Position Update] New position, No Objection, has been recorded for Pete Resnick |
|
2014-11-24
|
07-00 | Brian Haberman | [Ballot Position Update] New position, No Objection, has been recorded for Brian Haberman |
|
2014-11-23
|
07-00 | Joel Jaeggli | [Ballot Position Update] New position, No Objection, has been recorded for Joel Jaeggli |
|
2014-11-22
|
07-00 | Barry Leiba | [Ballot Position Update] New position, No Objection, has been recorded for Barry Leiba |
|
2014-11-21
|
07-00 | Adrian Farrel | [Ballot Position Update] New position, Yes, has been recorded for Adrian Farrel |
|
2014-11-19
|
07-00 | Cindy Morgan | Placed on agenda for telechat - 2014-11-25 |
|
2014-11-19
|
07-00 | Adrian Farrel | WG action text was changed |
|
2014-11-19
|
07-00 | Adrian Farrel | WG review text was changed |
|
2014-11-19
|
07-00 | Adrian Farrel | Created "Ready for external review" ballot |
|
2014-11-19
|
07-00 | Adrian Farrel | State changed to Internal review from Informal IESG review |
|
2014-11-07
|
07-00 | Adrian Farrel | New charter to take into account the formation of TEAS. This version has not yet been discussed by the working group |
|
2014-11-07
|
07-00 | Adrian Farrel | State changed to Informal IESG review from Approved |
|
2014-11-07
|
07-00 | Adrian Farrel | New version available: charter-ietf-ccamp-07-00.txt |
|
2010-03-17
|
07 | (System) | New version available: charter-ietf-ccamp-07.txt |
|
2010-03-16
|
06 | (System) | New version available: charter-ietf-ccamp-06.txt |
|
2009-08-29
|
05 | (System) | New version available: charter-ietf-ccamp-05.txt |
|
2009-08-29
|
04 | (System) | New version available: charter-ietf-ccamp-04.txt |
|
2009-08-29
|
03 | (System) | New version available: charter-ietf-ccamp-03.txt |
|
2009-08-29
|
02 | (System) | New version available: charter-ietf-ccamp-02.txt |
|
2001-01-31
|
01 | (System) | New version available: charter-ietf-ccamp-01.txt |