Skip to main content

Lifecycle and State Extensions for TVR Schedule YANG Model
draft-contreras-tvr-schedule-lifecycle-yang-01

Document Type Active Internet-Draft (individual)
Author Luis M. Contreras
Last updated 2026-11-02
RFC stream (None)
Intended RFC status (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state I-D Exists
Telechat date (None)
Responsible AD (None)
Send notices to (None)
draft-contreras-tvr-schedule-lifecycle-yang-01
TVR                                                      L. M. Contreras
Internet-Draft                                                Telefonica
Intended status: Informational                           2 November 2026
Expires: 6 May 2027

       Lifecycle and State Extensions for TVR Schedule YANG Model
             draft-contreras-tvr-schedule-lifecycle-yang-01

Abstract

   The Time-Variant Routing (TVR) YANG data model
   [I-D.ietf-tvr-schedule-yang] defines a mechanism to describe
   scheduled changes in network resources (such as nodes and topology)
   as a function of time.  However, the base model does not provide
   explicit lifecycle management semantics for the schedules, such as
   activation, suspension, or deprecation.

   This document defines an optional augmentation of the base YANG model
   to introduce lifecycle and administrative state control, enabling
   more flexible operational handling of schedules without modifying the
   base model semantics.

Status of This Memo

   This Internet-Draft is submitted in full conformance with the
   provisions of BCP 78 and BCP 79.

   Internet-Drafts are working documents of the Internet Engineering
   Task Force (IETF).  Note that other groups may also distribute
   working documents as Internet-Drafts.  The list of current Internet-
   Drafts is at https://datatracker.ietf.org/drafts/current/.

   Internet-Drafts are draft documents valid for a maximum of six months
   and may be updated, replaced, or obsoleted by other documents at any
   time.  It is inappropriate to use Internet-Drafts as reference
   material or to cite them other than as "work in progress."

   This Internet-Draft will expire on 6 May 2027.

Copyright Notice

   Copyright (c) 2026 IETF Trust and the persons identified as the
   document authors.  All rights reserved.

   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents (https://trustee.ietf.org/
   license-info) in effect on the date of publication of this document.

Contreras                  Expires 6 May 2027                   [Page 1]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

   Please review these documents carefully, as they describe your rights
   and restrictions with respect to this document.  Code Components
   extracted from this document must include Revised BSD License text as
   described in Section 4.e of the Trust Legal Provisions and are
   provided without warranty as described in the Revised BSD License.

Table of Contents

   1.  Introduction  . . . . . . . . . . . . . . . . . . . . . . . .   2
   2.  Terminology . . . . . . . . . . . . . . . . . . . . . . . . .   3
   3.  Motivation  . . . . . . . . . . . . . . . . . . . . . . . . .   3
     3.1.  Operational Situations for Lifecycle Control: . . . . . .   4
     3.2.  Aligment with the TVR YANG Model  . . . . . . . . . . . .   4
   4.  Design Overview . . . . . . . . . . . . . . . . . . . . . . .   5
     4.1.  Administrative states . . . . . . . . . . . . . . . . . .   5
     4.2.  Additional parameters . . . . . . . . . . . . . . . . . .   6
     4.3.  Applicability of the schedule . . . . . . . . . . . . . .   7
   5.  YANG Model for Lifecycle Management of TVR Schedules  . . . .   7
     5.1.  YANG tree schema  . . . . . . . . . . . . . . . . . . . .   7
     5.2.  YANG module . . . . . . . . . . . . . . . . . . . . . . .   8
   6.  Operational Considerations  . . . . . . . . . . . . . . . . .  10
   7.  Security Considerations . . . . . . . . . . . . . . . . . . .  10
   8.  References  . . . . . . . . . . . . . . . . . . . . . . . . .  11
     8.1.  Normative References  . . . . . . . . . . . . . . . . . .  11
     8.2.  Informative References  . . . . . . . . . . . . . . . . .  11
   Author's Address  . . . . . . . . . . . . . . . . . . . . . . . .  12

1.  Introduction

   The TVR schedule model [I-D.ietf-tvr-schedule-yang] focuses on
   describing the temporal validity of network attributes.  In the
   current specification, schedule applicability is implicitly
   determined by time intervals.

   However, operational deployments can require additional control
   mechanisms to manage schedules throughout their lifecycle, including
   temporary deactivation, staged deployment, rollback, and conflict
   resolution.  The absence of explicit lifecycle management mechanisms
   may lead to ambiguities in operational environments where schedules
   are dynamically provisioned, updated, or superseded.

   [RFC9657] describes a number of TVR use cases.  While some use cases
   (e.g., mobile satellites) are deterministic in the sense of
   describing a continuous variance of the routing along time, some
   others (e.g., energy efficiency) are based on assumptions about
   future behavior that could be altered by events or operational
   circunstances (e.g., change on the traffic with respecto to the
   initial forecast, failures or unplanned changes in the network, etc)

Contreras                  Expires 6 May 2027                   [Page 2]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

   that could motivate the need of revoking the originally intended
   schedule.  Similarly [I-D.ietf-tvr-off-path-exposure] describes a use
   case of planned network maintenance (e.g., software upgrade, line
   card replacement, etc) where having administrative control of the
   schedules is necessary because the intervention can be impacted by
   unforeseen situations at the time fo defining the schedule.

   This extension is intended to complement the TVR scheduling model by
   introducing an optional augmentation to the TVR schedule model in
   order to provide a mechanism for explicit lifecycle control,
   preserving compatibility with implementations of the base model,
   introducing administrative control attributes that enable explicit
   management of schedule applicability without altering their temporal
   definition.  The extension does not modify the temporal semantics of
   the base TVR schedule model.  Implementations that do not support
   this augmentation continue to process schedules according to the base
   model.

2.  Terminology

   The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL
   NOT","SHOULD", "SHOULD NOT", "RECOMMENDED", "MAY", and "OPTIONAL" in
   this document are to be interpreted as described in [RFC2119] and
   [RFC8174].

   The following definitions are used in this document:

   *  Administrative state: an explicitly configured state that
      determines whether a schedule is eligible for application
      independently of its temporal validity.

   *  Temporal validity: The condition resulting from evaluation of the
      temporal parameters of a schedule.

   *  Applicable schedule: A schedule that is both administratively
      eligible and temporally valid.

   In addition, the terms defined in [I-D.ietf-tvr-requirements] are
   also used in this document.

3.  Motivation

   TVR enables the possibility of advertised predictable changes in
   network resources (nodes and/or topology).  This means that future
   changes are predicted to happen in a given point of time under
   current assumptions and circumstances.  However, it could be the case
   that such assumptions and circumstances are not longer valid from the
   time of definition of the schedule for the changes up to the

Contreras                  Expires 6 May 2027                   [Page 3]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

   realization of those predicted changes.  Then there is a need for
   defining administrative control for planned changes in network
   resources so that schedules defined in some point of time can be
   modified to adjust the changes planned in the past to new operational
   situations.

3.1.  Operational Situations for Lifecycle Control:

   A number of operational situations can require lifecycle control.

   *  Temporary suspension of schedules due to unexpected events or
      maintenance operations (e.g., indicated with other schedules).

   *  Controlled activation after validation or staging, enabling the
      schedules to be provisioned and validated in advance, and then
      activated in a controlled manner when required.

   *  Coexistence of multiple schedule versions, enabling selection of
      the appropriate one without removing others (e.g., for
      traceability).

   *  Conflict resolution between overlapping schedules, enabling
      explicit prioritization and selection according to predifined
      rules.

   *  Rollback to previously defined schedules, allowing schedules to be
      reactivated without redefining their temporal parameters.

   Thus, the administrative lifecycle control allows a previously
   applicable schedule to be made inapplicable without modifying or
   deleting its temporal definition.  This can also support reverting
   administrative selection to another previously provisioned schedule.

3.2.  Aligment with the TVR YANG Model

   The TVR requirements document [I-D.ietf-tvr-requirements] defines the
   functional expectations for systems performing Time-Variant Routing
   (TVR), including the modeling of time-dependent properties and the
   computation of routes as a function of time.  The base YANG data
   model for scheduled attributes [I-D.ietf-tvr-schedule-yang] fulfills
   these requirements by providing a mechanism to represent time-based
   variations of network properties.  This document introduces an
   optional augmentation that provides administrative control over
   schedules.  This control operates orthogonally to the temporal
   dimension of the model.

   In particular, this document addresses operational gaps that arise
   when deploying TVR systems in practice, including:

Contreras                  Expires 6 May 2027                   [Page 4]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

   *  The ability to distinguish between defined schedules and those
      actively enforced in the network.

   *  The capability to administratively activate, suspend, or deprecate
      schedules without modifying their temporal contents.

   *  Support for controlled deployment workflows, including staging and
      rollback of schedules.

   *  Resolution of conflicts between multiple overlapping schedules by
      means of administrative prioritization.

   These capabilities enable more robust operational handling of time-
   variant data, particularly in architectures involving multiple
   components such as schedule generators, controllers, and managed
   devices.  The introduction of an administrative state does not change
   the interpretation of time-variant properties.  A schedule remains
   temporally valid according to its defined intervals, while its
   applicability is additionally conditioned by its administrative
   state.

   This extension is proposed as optional to be used in the TVR use
   cases that benefit from the management of the lifecycle of the
   schedules.

4.  Design Overview

   The base TVR schedule model defines schedule validity based on time.
   This document introduces an additional optional layer of
   administrative control.  As a result, a schedule is considered
   applicable if both time-based and administrative conditions are
   satisfied.

4.1.  Administrative states

   The following administrative states are considered:

   *  Active, when the schedule is administratively enabled and MUST be
      considered for application when its temporal conditions are
      satisfied.

   *  Inactive, if the schedule is administratively disabled and MUST
      NOT be applied, regardless of its temporal validity.

   *  Deprecated, representing that the schedule is marked as no longer
      recommended for use and SHOULD NOT be applied.  (Note: for
      discussion to define what to do if no alternative active schedules
      are available).

Contreras                  Expires 6 May 2027                   [Page 5]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

   *  Pending, when the schedule has been provisioned but is not yet
      active and MUST NOT be applied until its administrative state is
      changed to "active".

   (Note: to be discussed if additional states can be required e.g.,
   removed, etc)

   The inactive and deprecated states have different operational intent.
   Inactive represents a reversible administrative suspension of a
   schedule that can become active again in some point of time.
   Deprecated indicates that the schedule is no longer intended for
   normal use and is retained principally for lifecycle management or
   traceability.  For instance, when a schedule is superseded, the old
   schedule can be retained in deprecated state for traceability while
   the replacement schedule is independently provisioned and activated.

   Figure 1 details the transition among states.

       +----------+      +----------+      +----------+
       |          |      |          |----->|          |
       | Pending  |----->|  Active  |      | Inactive |
       |          |      |          |<-----|          |
       +----------+      +----------+      +----------+
                              |
                              |
                              v
                         +----------+
                         |          |
                         |Deprecated|
                         |          |
                         +----------+

   Figure 1.  Administrative states transition.

4.2.  Additional parameters

   In order to allow finer control of the schedules, the model includes
   additional parameters, as follows:

   *  Version, to allow keeping track of schedule modifications along
      time.

   *  Priority, in order to signal the priority of a specific schedule
      in case of conflict (i.e., overlapping) with some other predifined
      schedule.

   *  Origin, to identify the responsible for the definition of a given
      schedule.

Contreras                  Expires 6 May 2027                   [Page 6]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

4.3.  Applicability of the schedule

   A schedule MUST be considered applicable only if both of the
   following conditions are satisfied:

   *  The current time is within the defined schedule interval.

   *  The administrative state of the schedule is set to "active".

   If the administrative state is not "active", the schedule MUST NOT be
   applied, regardless of its temporal validity.  This approach
   preserves the semantics of the base model while enabling enhanced
   operational control.

   Moreover, in scenarios where multiple schedules overlap in time,
   implementations MUST determine the applicable schedule based on
   administrative state and priority.  Thus, only schedules with admin-
   status set to "active" MUST be considered to be applied.  Among
   those, the schedule with the highest priority value SHOULD be
   selected.  In case of equal priority, the selection is
   implementation-specific, for instance, based on the originator of the
   schedule.

5.  YANG Model for Lifecycle Management of TVR Schedules

5.1.  YANG tree schema

   The following tree diagram illustrates the structure of the lifecycle
   augmentation applied to the TVR schedule model:

   module: ietf-tvr-schedule-lifecycle

     augment /tvr-schd:schedules:

       +--rw admin-status?   enumeration
       |  +-- active
       |  +-- inactive
       |  +-- deprecated
       |  +-- pending
       |
       +--rw version?        string
       |
       +--rw priority?       uint8
       |
       +--rw last-modified?  yang:date-and-time
       |
       +--rw origin?         string   (optional)

Contreras                  Expires 6 May 2027                   [Page 7]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

5.2.  YANG module

   The YANG module is described as follows.

module ietf-tvr-schedule-lifecycle {
  yang-version 1.1;
  namespace "urn:ietf:params:xml:ns:yang:ietf-tvr-schedule-lifecycle";
  prefix tvr-schd-lc;

  import ietf-tvr-schedule {
    prefix tvr-schd;
  }

  import ietf-yang-types {
    prefix yang;
  }

  organization
    "IETF TVR Working Group";

  contact
    "WG Web:   <https://datatracker.ietf.org/wg/tvr/>
     WG List:  <mailto:tvr@ietf.org>";

         Author:   Luis M. Contreras
               <luismiguel.contrerasmurillo@telefonica.com>

  description
    "This module augments the TVR schedule model with lifecycle
     and administrative control state.";

  revision 2026-06-20 {
    description
      "Initial version.";
  }

  grouping schedule-lifecycle {
    description
      "Lifecycle attributes for TVR schedules.";

    leaf admin-status {
      type enumeration {
        enum active {
          description "Schedule is active and applied.";
        }
        enum inactive {
          description "Schedule is administratively disabled.";
        }

Contreras                  Expires 6 May 2027                   [Page 8]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

        enum deprecated {
          description "Schedule is no longer recommended.";
        }
        enum pending {
          description "Schedule defined but not yet active.";
        }
      }
      default "active";
      description
        "Administrative state of the schedule.";
    }

    leaf version {
      type string;
      description
        "Version identifier of the schedule.";
    }

    leaf priority {
      type uint8{
                range "0..255";
      }
          description
                "Priority used to resolve conflicts between schedules.
                Higher values indicate higher priority.";

    }

    leaf last-modified {
      type yang:date-and-time;
      description
        "Timestamp of the last modification of the schedule lifecycle attributes.";
    }

        leaf origin {
         type string;
         description
                "Identifier of the entity that provisioned the schedule.";
        }

  }

  augment "/tvr-schd:schedules" {
    description
      "Augment schedules with lifecycle control.";

    uses schedule-lifecycle;

Contreras                  Expires 6 May 2027                   [Page 9]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

  }
}

6.  Operational Considerations

   The operational considerations described in
   [I-D.ietf-tvr-schedule-yang] apply to this document.

   Further operational considerations are related to the lifecycle
   management of the schedules and the usage of the parameters
   considered in the model.  The following is a list of operational
   situations that require attention.

   *  Since the extension here defined is optional, backward
      compatibility SHOULD be guaranteed with devices and/or components
      not supporting this model.  That is, this extension SHOULD NOT be
      used in case the devices and/or control components not support
      this model.

   *  When this augmentation is supported, implementations MUST evaluate
      schedule applicability taking into account both temporal validity
      and administrative state.

   *  When multiple schedules overlap, implementations SHOULD consider
      both administrative state and priority when selecting the active
      schedule.

   *  Implementations SHOULD ensure consistency between the intended
      datastore and operational datastore when lifecycle attributes are
      modified.

   Furthermore, consistent interpretation of the administrative state
   across components and devices.

7.  Security Considerations

   The security considerations described in [I-D.ietf-tvr-schedule-yang]
   and [I-D.ietf-tvr-requirements] also apply to this document.

   Additional security considerations apply to the lifecycle model.  The
   following list describes considerations to take into account.

   *  The ability to activate or deactivate schedules introduces control
      risks.  The frequency of changes can be a vector of attacks.

Contreras                  Expires 6 May 2027                  [Page 10]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

   *  Unauthorized modifications of lifecycle attributes may result in
      unexpected activation or deactivation of schedules, potentially
      impacting routing behavior.  Thus authentication and secure
      transport mechanisms SHOULD be used.

   *  Implementations SHOULD support logging of lifecycle state changes
      sufficient to identify the affected schedule, the resulting state,
      and the management operation responsible for the change.

8.  References

8.1.  Normative References

   [I-D.ietf-tvr-schedule-yang]
              Qu, Y., Lindem, A., Kinzie, E., Fedyk, D., and M.
              Blanchet, "A YANG Data Model for Scheduled Attributes",
              Work in Progress, Internet-Draft, draft-ietf-tvr-schedule-
              yang-12, 10 June 2026,
              <https://datatracker.ietf.org/doc/html/draft-ietf-tvr-
              schedule-yang-12>.

8.2.  Informative References

   [I-D.ietf-tvr-off-path-exposure]
              Contreras, L. M., "Using off-path mechanisms for exposing
              Time-Variant Routing information", Work in Progress,
              Internet-Draft, draft-ietf-tvr-off-path-exposure-03, 26
              July 2026, <https://datatracker.ietf.org/doc/html/draft-
              ietf-tvr-off-path-exposure-03>.

   [I-D.ietf-tvr-requirements]
              King, D., Contreras, L. M., Sipos, B., and L. Zhang,
              "Time-Variant Routing (TVR) Requirements", Work in
              Progress, Internet-Draft, draft-ietf-tvr-requirements-11,
              2 July 2026, <https://datatracker.ietf.org/doc/html/draft-
              ietf-tvr-requirements-11>.

   [RFC2119]  Bradner, S., "Key words for use in RFCs to Indicate
              Requirement Levels", BCP 14, RFC 2119,
              DOI 10.17487/RFC2119, March 1997,
              <https://www.rfc-editor.org/info/rfc2119>.

   [RFC8174]  Leiba, B., "Ambiguity of Uppercase vs Lowercase in RFC
              2119 Key Words", BCP 14, RFC 8174, DOI 10.17487/RFC8174,
              May 2017, <https://www.rfc-editor.org/info/rfc8174>.

Contreras                  Expires 6 May 2027                  [Page 11]
Internet-Draft  Lifecycle and State Extensions for TVR S   November 2026

   [RFC9657]  Birrane, III, E., Kuhn, N., Qu, Y., Taylor, R., and L.
              Zhang, "Time-Variant Routing (TVR) Use Cases", RFC 9657,
              DOI 10.17487/RFC9657, October 2024,
              <https://www.rfc-editor.org/info/rfc9657>.

Author's Address

   Luis M. Contreras
   Telefonica
   Ronda de la Comunicacion, s/n
   28050 Madrid
   Spain
   Email: luismiguel.contrerasmurillo@telefonica.com
   URI:   http://lmcontreras.com

Contreras                  Expires 6 May 2027                  [Page 12]