Skip to main content

Deployment Model of Control Plane and User Plane Separated BNG
draft-cuspdt-rtgwg-cu-separation-bng-deployment-01

The information below is for an old version of the document.
Document Type
This is an older version of an Internet-Draft whose latest revision state is "Expired".
Expired & archived
Authors Rong Gu , Sujun Hu , Zitao Wang , fangwei hu
Last updated 2018-08-30 (Latest revision 2018-02-26)
RFC stream (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state Expired
Telechat date (None)
Responsible AD (None)
Send notices to (None)

This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:

Abstract

This document introduces deployment model of BNG device with Control Plane and User Plane separation in order to give guidance of the deployment of CP and UP separated BNG devices in operators' network.

Authors

Rong Gu
Sujun Hu
Zitao Wang
fangwei hu

(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)