Review request
draft-ietf-payload-flexible-fec-scheme

Request Review of draft-ietf-payload-flexible-fec-scheme
Requested rev. no specific revision (document currently at 20)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2019-02-01
Requested 2019-01-18
Draft last updated 2019-05-24
Completed reviews Secdir Last Call review of -16 by Radia Perlman (diff)
Genart Last Call review of -16 by Meral Shirazipour (diff)
Tsvart Last Call review of -16 by Bernard Aboba (diff)
Secdir Telechat review of -17 by Radia Perlman (diff)
Assignment Reviewer Meral Shirazipour
State Completed
Review review-ietf-payload-flexible-fec-scheme-16-genart-lc-shirazipour-2019-02-21
Reviewed rev. 16 (document currently at 20)
Review result Ready with Nits
Review completed: 2019-02-21