Hello,
ROLL WG kindly request for a routing directorate review and security directorate review of draft-ietf-roll-dao-projection-31.
The review deadline is 22 of January. If you need more time please let us know.
Abstract: "This document extends RFC 6550, RFC 6553, and RFC 8138 to enable a RPL Root to install and maintain Projected Routes within its DODAG, along a selected set of nodes that may or may not include itself, for a chosen duration. This potentially enables routes that are more optimized or resilient than those obtained with the classical distributed operation of RPL, either in terms of the size of a Routing Header or in terms of path length, which impacts both the latency and the packet delivery ratio."
Many thanks,
Ines.