Review request
draft-ietf-roll-dao-projection
| Request | Review of | draft-ietf-roll-dao-projection-31 |
|---|---|---|
| Requested revision | 31 (document currently at 40) | |
| Type | IETF Last Call Review | |
| Team | Routing Area Directorate (rtgdir) | |
| Deadline | 2023-09-01 | |
| Requested | 2023-01-05 | |
| Requested by | Ines Robles | |
| Authors | Pascal Thubert , Rahul Jadhav , Michael Richardson | |
| WG chairs | Ines Robles , Remous-Aris Koutsiamanis | |
| I-D last updated | 2026-02-27 (Latest revision 2025-03-11) | |
| IESG document state | RFC Ed Queue | |
| Completed reviews |
Rtgdir IETF Last Call review of -32
by Susan Hares
(diff)
Secdir IETF Last Call review of -31 by Klaas Wierenga (diff) Tsvart Telechat review of -36 by Michael Scharf (diff) Opsdir Telechat review of -39 by Ran Chen (diff) |
|
| Comments |
Hello, ROLL WG kindly request for a routing directorate review and security directorate review of draft-ietf-roll-dao-projection-31. The review deadline is 22 of January. If you need more time please let us know. Abstract: "This document extends RFC 6550, RFC 6553, and RFC 8138 to enable a RPL Root to install and maintain Projected Routes within its DODAG, along a selected set of nodes that may or may not include itself, for a chosen duration. This potentially enables routes that are more optimized or resilient than those obtained with the classical distributed operation of RPL, either in terms of the size of a Routing Header or in terms of path length, which impacts both the latency and the packet delivery ratio." Many thanks, Ines. |
|
| Assignments | Reviewer | Susan Hares |
| State | Completed | |
| Review |
review-ietf-roll-dao-projection-32-rtgdir-lc-hares-2023-08-23
|
|
| Posted at | https://mailarchive.ietf.org/arch/msg/rtg-dir/9rBQj-dOldU2W-4nvfspE2QqqaQ | |
| Reviewed revision | 32 (document currently at 40) | |
| Result | Has issues | |
| Completed | 2023-08-23 | |
| Reviewer | Christian Hopps | |
| State | Rejected | |
| Reviewer | Julien Meuric | |
| State | Rejected |
History
| Date | By | Description |
|---|---|---|
| 2023-08-30 | Haomian Zheng | Assignment of request for Last Call review by RTGDIR to Julien Meuric was rejected |
| 2023-08-23 | Susan Hares | Request for Last Call review by RTGDIR Completed: Has Issues. Reviewer: Susan Hares. |
| 2023-08-04 | Susan Hares | Assignment for Susan Hares accepted |
| 2023-08-03 | Haomian Zheng | Request for Last Call review by RTGDIR is assigned to Susan Hares |
| 2023-01-23 | Julien Meuric | Assignment for Julien Meuric accepted |
| 2023-01-16 | Luc André Burdet | Request for Last Call review by RTGDIR is assigned to Julien Meuric |
| 2023-01-16 | Christian Hopps | Assignment of request for Last Call review by RTGDIR to Christian Hopps was rejected |
| 2023-01-16 | Luc André Burdet | Request for Last Call review by RTGDIR is assigned to Christian Hopps |
| 2023-01-05 | Ines Robles | Requested Last Call review by RTGDIR |