Skip to main content

A Review of Published Criteria for Acceptance Into a Complaint Feedback Loop Program
draft-jdfalk-marf-acceptance-criteria-00

Document Type Expired Internet-Draft (individual)
Expired & archived
Author J.D. Falk
Last updated 2010-07-04
RFC stream (None)
Intended RFC status (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state Expired
Telechat date (None)
Responsible AD (None)
Send notices to (None)

This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:

Abstract

All known Feedback Generators (the operators of complaint feedback loops) have some criteria for acceptance of requests to receive feedback. This document is a review of such criteria, where publicly available. It is intended to inform design decisions within the Mail Abuse Reporting Format (MARF) Working Group [MARF-WG], and likely will never advance beyond internet-draft status. The information included herein was gathered from public web sites.

Authors

J.D. Falk

(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)