@techreport{jdfalk-marf-acceptance-criteria-00, number = {draft-jdfalk-marf-acceptance-criteria-00}, type = {Internet-Draft}, institution = {Internet Engineering Task Force}, publisher = {Internet Engineering Task Force}, note = {Work in Progress}, url = {https://datatracker.ietf.org/doc/draft-jdfalk-marf-acceptance-criteria/00/}, author = {J.D. Falk}, title = {{A Review of Published Criteria for Acceptance Into a Complaint Feedback Loop Program}}, pagetotal = 17, year = 2010, month = jul, day = 4, abstract = {All known Feedback Generators (the operators of complaint feedback loops) have some criteria for acceptance of requests to receive feedback. This document is a review of such criteria, where publicly available. It is intended to inform design decisions within the Mail Abuse Reporting Format (MARF) Working Group {[}MARF-WG{]}, and likely will never advance beyond internet-draft status. The information included herein was gathered from public web sites.}, }