PCEP Operational Clarification
draft-koldychev-pce-operational-00
Document | Type |
This is an older version of an Internet-Draft whose latest revision state is "Expired".
Expired & archived
|
|
---|---|---|---|
Authors | Mike Koldychev , Siva Sivabalan , Mahendra Singh Negi , Diego Achaval , Hari Kotni | ||
Last updated | 2020-01-03 (Latest revision 2019-07-02) | ||
RFC stream | (None) | ||
Formats | |||
Stream | Stream state | (No stream defined) | |
Consensus boilerplate | Unknown | ||
RFC Editor Note | (None) | ||
IESG | IESG state | Expired | |
Telechat date | (None) | ||
Responsible AD | (None) | ||
Send notices to | (None) |
This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:
Abstract
This document is meant to provide better clarity about how PCEP operates and hence to facilitate better interoperability between different equipment vendors. The content of this document has been compiled based on the feedback from several multi-vendor interop exercises. Several constructs are introduced to facilitate this, such as the LSP-DB and the ASSO-DB.
Authors
Mike Koldychev
Siva Sivabalan
Mahendra Singh Negi
Diego Achaval
Hari Kotni
(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)