Skip to main content

Dynamic Placement of Pseudowires using a Path Computation Element
draft-martini-pwe3-ms-pw-pce-01

Document Type Expired Internet-Draft (individual)
Expired & archived
Author Luca Martini
Last updated 2006-10-23
RFC stream (None)
Intended RFC status (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state Expired
Telechat date (None)
Responsible AD (None)
Send notices to (None)

This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:

Abstract

When dynamically established Pseudowires (PW) span across multiple service providers networks, or across multiple autonomous systems, there is a need to calculate the best route among a set of switching point PEs (S- PE). A method for calculating said "best route", and choosing the S-PEs is described in this document using the existing Path Computation Element work done in the PCE WG.

Authors

Luca Martini

(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)