Skip to main content

Scheduling Function One (SF1) for hop-by-hop Scheduling in 6tisch Networks
draft-satish-6tisch-6top-sf1-03

The information below is for an old version of the document.
Document Type
This is an older version of an Internet-Draft whose latest revision state is "Expired".
Expired & archived
Authors Satish Anamalamudi , Mingui Zhang , Abdur Rashid Sangi , Charles E. Perkins , S.V.R Anand
Last updated 2017-08-06 (Latest revision 2017-02-02)
RFC stream (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state Expired
Telechat date (None)
Responsible AD (None)
Send notices to (None)

This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:

Abstract

This document defines a 6top Scheduling Function called "Scheduling Function One" (SF1) to reserve, label and schedule the end-to-end resources hop-by-hop through the Distributed Resource Reservation Protocol(RSVP). SF1 uses the 6P signaling messages with a global TrackID to add or delete the cells in L2-bundles of isolated traffic flows.

Authors

Satish Anamalamudi
Mingui Zhang
Abdur Rashid Sangi
Charles E. Perkins
S.V.R Anand

(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)