Skip to main content

PQC Certificate Rotation Requirements for Multi-Tenant PKI Environments
draft-vicente-pquip-multitenant-pki-requirements-05

Document Type Active Internet-Draft (individual)
Author Brian Vicente
Last updated 2026-09-12
RFC stream (None)
Intended RFC status (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state I-D Exists
Telechat date (None)
Responsible AD (None)
Send notices to (None)
draft-vicente-pquip-multitenant-pki-requirements-05
Post-Quantum Use In Protocols                            B. Vicente, Ed.
Internet-Draft                                        Sanctum SecOps LLC
Intended status: Informational                         13 September 2026
Expires: 17 March 2027

PQC Certificate Rotation Requirements for Multi-Tenant PKI Environments
          draft-vicente-pquip-multitenant-pki-requirements-05

Abstract

   This document specifies requirements for post-quantum cryptography
   (PQC) certificate rotation in multi-tenant public key infrastructure
   (PKI) environments.  Multi-tenant PKI deployments — in which a single
   PKI platform issues and manages certificates for multiple distinct
   tenant organizations — face coordination challenges that single-
   tenant PKI deployments do not encounter during PQC migration.

Supplementary Materials

   This note is to be removed before publishing as an RFC.

   Reference implementation: CygnetLib
   (https://github.com/sanctumsecopsmssp/CygnetLib
   (https://github.com/sanctumsecopsmssp/CygnetLib)).  JSON evidence:
   algorithm registry, CNSA 2.0 compliance matrix, IETF PQC
   interoperability status, and ACTV test vectors are in the evidence/
   directory.  CAGE/NCAGE: 20XS3.  Apex website:
   https://www.sanctumsecops.com/ (https://www.sanctumsecops.com/).

Source and Archival

   This note is to be removed before publishing as an RFC.

   Source maintained at https://github.com/Sanc-Admin/pquip-multitenant-
   pki-requirements (https://github.com/Sanc-Admin/pquip-multitenant-
   pki-requirements).  Author ORCID iD:
   https://orcid.org/0009-0006-6395-5308
   (https://orcid.org/0009-0006-6395-5308).

IPR Considerations

   This note is to be removed before publishing as an RFC.

   Certain technology described in this document is covered or may be
   covered by pending United States patent applications owned by Sanctum
   SecOps LLC, including U.S.  Application Nos. 64/080,137 and
   19/698,870.  Brian Vicente is the inventor.  Patent pending.

Vicente                   Expires 17 March 2027                 [Page 1]
Internet-Draft      Multitenant PKI PQC Requirements      September 2026

   Sanctum SecOps LLC is prepared to grant to all implementers, under a
   separate written agreement, a non-exclusive, worldwide license on
   reasonable and non-discriminatory terms that may include reasonable
   fees or royalties, under Necessary Patent Claims owned or controlled
   by Sanctum SecOps LLC.

   "Necessary Patent Claims" means claims subject to the applicable IETF
   disclosure that would necessarily be infringed by implementing
   technology required by this specification and for which no
   technically and commercially feasible non-infringing alternative is
   available.

   The license applies only to the compliant portion of a product or
   service implementing required technology.  It does not extend to
   optional features, proprietary enhancements, noncompliant
   implementations, methods not required by the specification, unrelated
   Sanctum SecOps LLC products, hosted control planes, managed services,
   trade secrets or claims that are not Necessary Patent Claims.

   Licensing may be conditioned on reciprocal licensing on reasonable
   and non-discriminatory terms for necessary claims owned or controlled
   by the licensee.  Sanctum SecOps LLC reserves defensive suspension
   and available remedies if the licensee or an affiliate asserts
   patents against Sanctum SecOps LLC, its affiliates, licensees,
   customers, compliant products or compliant services, except for a
   defensive claim compelled by a prior assertion.

   Nothing in this document admits or warrants issuance, validity,
   enforceability, infringement, essentiality, claim scope, absence of
   alternatives or freedom to operate.  No patent license arises merely
   from publication of this specification.  The controlling IETF
   Datatracker IPR disclosures remain authoritative.

Status of This Memo

   This Internet-Draft is submitted in full conformance with the
   provisions of BCP 78 and BCP 79.

   Internet-Drafts are working documents of the Internet Engineering
   Task Force (IETF).  Note that other groups may also distribute
   working documents as Internet-Drafts.  The list of current Internet-
   Drafts is at https://datatracker.ietf.org/drafts/current/.

   Internet-Drafts are draft documents valid for a maximum of six months
   and may be updated, replaced, or obsoleted by other documents at any
   time.  It is inappropriate to use Internet-Drafts as reference
   material or to cite them other than as "work in progress."

Vicente                   Expires 17 March 2027                 [Page 2]
Internet-Draft      Multitenant PKI PQC Requirements      September 2026

   This Internet-Draft will expire on 17 March 2027.

Copyright Notice

   Copyright (c) 2026 IETF Trust and the persons identified as the
   document authors.  All rights reserved.

   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents (https://trustee.ietf.org/
   license-info) in effect on the date of publication of this document.
   Please review these documents carefully, as they describe your rights
   and restrictions with respect to this document.  Code Components
   extracted from this document must include Revised BSD License text as
   described in Section 4.e of the Trust Legal Provisions and are
   provided without warranty as described in the Revised BSD License.

Table of Contents

   1.  Introduction  . . . . . . . . . . . . . . . . . . . . . . . .   3
     1.1.  Background  . . . . . . . . . . . . . . . . . . . . . . .   3
     1.2.  Scope and Differentiation . . . . . . . . . . . . . . . .   4
   2.  Conventions and Definitions . . . . . . . . . . . . . . . . .   4
   3.  Requirements  . . . . . . . . . . . . . . . . . . . . . . . .   5
     3.1.  Tenant Isolation Requirements . . . . . . . . . . . . . .   5
     3.2.  Platform Coordination Requirements  . . . . . . . . . . .   5
     3.3.  Interoperability Requirements . . . . . . . . . . . . . .   5
   4.  Implementation Status . . . . . . . . . . . . . . . . . . . .   6
   5.  Security Considerations . . . . . . . . . . . . . . . . . . .   7
     5.1.  Tenant Isolation Failure  . . . . . . . . . . . . . . . .   7
     5.2.  Algorithm-Agility Horizon Enforcement . . . . . . . . . .   7
   6.  IANA Considerations . . . . . . . . . . . . . . . . . . . . .   7
   7.  Normative References  . . . . . . . . . . . . . . . . . . . .   7
   8.  Informative References  . . . . . . . . . . . . . . . . . . .   7
   Appendix A.  Acknowledgements . . . . . . . . . . . . . . . . . .   8
   Changelog . . . . . . . . . . . . . . . . . . . . . . . . . . . .   8
   Author's Address  . . . . . . . . . . . . . . . . . . . . . . . .   8

1.  Introduction

1.1.  Background

   The transition to post-quantum cryptography requires PKI operators to
   replace classical (RSA, ECDSA) certificates with PQC certificates
   across their entire issuing hierarchy.  In single-tenant PKI
   deployments, this transition is coordinated by a single
   organizational policy owner.  In multi-tenant PKI deployments, the
   transition must be coordinated across multiple tenant organizations,
   each of which may have distinct: (a) contractual terms governing

Vicente                   Expires 17 March 2027                 [Page 3]
Internet-Draft      Multitenant PKI PQC Requirements      September 2026

   certificate issuance, (b) application stacks with varying PQC
   algorithm support, (c) compliance deadlines imposed by sector-
   specific regulators, and (d) revocation and renewal SLAs.

   NIST FIPS 204 [FIPS204] (ML-DSA) and FIPS 205 [FIPS205] (SLH-DSA)
   define the primary PQC signature algorithms to which PKI platforms
   must migrate.  This document defines requirements that a multi-tenant
   PKI platform MUST satisfy to support orderly, tenant-isolated PQC
   certificate rotation.

1.2.  Scope and Differentiation

   This document addresses multi-tenant PKI coordination requirements.
   It does not define: the PQC certificate format (see [FIPS204],
   [FIPS205], and LAMPS WG work); the composite-signature format (see
   draft-ietf-lamps-pq-composite-sigs); or the certificate rotation
   protocol mechanics (see ACME [RFC8555]).  It defines the
   _requirements_ that a multi-tenant PKI platform and its ACME-
   compatible CA must satisfy during PQC migration.

2.  Conventions and Definitions

   The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT",
   "SHOULD", "SHOULD NOT", "RECOMMENDED", "NOT RECOMMENDED", "MAY", and
   "OPTIONAL" in this document are to be interpreted as described in BCP
   14 [RFC2119] [RFC8174].

   Multi-Tenant PKI Platform:
      A PKI platform that issues and manages certificates for multiple
      distinct tenant organizations using shared infrastructure.

   Tenant:
      An organization that consumes certificate issuance services from a
      Multi-Tenant PKI Platform under a distinct administrative domain.

   Tenant Migration State:
      The per-tenant record of PQC migration progress, including which
      certificate profiles have been migrated, which remain classical,
      and any tenant-specific compliance deadline.

   Platform Migration Epoch:
      A platform-defined time window during which PQC migration is
      executed for a cohort of tenants.

   Algorithm-Agility Horizon:
      The date by which a tenant's certificate profile must be migrated
      to a NIST-approved PQC algorithm to remain compliant with the
      platform's migration policy.

Vicente                   Expires 17 March 2027                 [Page 4]
Internet-Draft      Multitenant PKI PQC Requirements      September 2026

3.  Requirements

3.1.  Tenant Isolation Requirements

   *REQ-MT-1: Tenant Migration State Isolation.* The platform MUST
   maintain Tenant Migration State independently for each tenant.  The
   migration state of one tenant MUST NOT affect the certificate
   issuance or validation service for any other tenant during the
   migration period.

   *REQ-MT-2: Tenant-Specific Algorithm-Agility Horizon.* The platform
   MUST support configuring a distinct Algorithm-Agility Horizon per
   tenant.  A tenant with an earlier regulatory compliance deadline MUST
   be migrable to PQC independently of tenants with later deadlines.

   *REQ-MT-3: Classical Fallback for Non-Migrated Tenants.* During the
   Platform Migration Epoch, the platform MUST continue to issue
   classical (RSA/ECDSA) certificates for tenants that have not yet
   completed PQC migration without requiring those tenants to accept PQC
   certificates before their Algorithm-Agility Horizon.

3.2.  Platform Coordination Requirements

   *REQ-MT-4: Phased Rollout Sequencing.* The platform SHOULD support a
   phased rollout model in which tenants are migrated in sequenced
   cohorts, with each cohort validated before the next cohort begins
   migration.  The sequencing policy MUST be documented and made
   available to tenants.

   *REQ-MT-5: Per-Tenant Migration Notification.* The platform MUST
   notify each tenant of its scheduled Platform Migration Epoch and
   Algorithm-Agility Horizon at least 90 days before the epoch begins,
   via a machine-readable notification mechanism (e.g., ACME Directory
   metadata or a platform API endpoint).

   *REQ-MT-6: Cross-Tenant Revocation Isolation.* An emergency
   revocation of certificates in one tenant's domain due to a PQC
   migration failure MUST NOT trigger revocation of certificates in
   other tenants' domains, even if those certificates were issued by the
   same intermediate CA.

3.3.  Interoperability Requirements

   *REQ-MT-7: ACME Protocol Compatibility.* The platform's certificate
   rotation mechanism MUST be compatible with ACME [RFC8555] as the
   primary automated certificate rotation protocol.  PQC certificate
   issuance MUST be accessible via ACME without requiring proprietary
   extensions that break ACME client compatibility.

Vicente                   Expires 17 March 2027                 [Page 5]
Internet-Draft      Multitenant PKI PQC Requirements      September 2026

   *REQ-MT-8: Dual-Mode Issuance During Transition.* During the Platform
   Migration Epoch, the platform MUST support issuing both classical and
   PQC certificates to different tenants simultaneously.  The platform
   MUST NOT require a flag-day cutover that forces all tenants to
   migrate simultaneously.

   *REQ-MT-9: Machine-Readable Migration Metadata.* The platform MUST
   expose per-tenant migration state via a machine-readable metadata
   endpoint (e.g., JSON API or ACME Directory extension) that tenant
   systems can poll to determine their current migration status and
   upcoming Algorithm-Agility Horizon.

4.  Implementation Status

   This section records the status of known implementations of the
   mechanisms described in this document at the time of posting, based
   on the proposal in [RFC7942].  A listing here does not imply
   endorsement by the IETF, and this section is expected to be removed
   by the RFC Editor before publication.

   Implementation:  CygnetSSL certification authority driver, Sanctum
      SecOps LLC.

   Description:  Certificate issuance, revocation, chain and profile
      verification, CRL generation and publication, and OCSP status
      responses, built on OpenSSL 3 with the FIPS provider active.

   Maturity:  Operated on a single administrator-managed estate.  No
      interoperability testing against independent implementations has
      been performed.

   Licensing:  Proprietary; source not publicly available.

   Contact:  bvicente@sanctumsecops.com

   Observations recorded on 2026-09-12 on that implementation: the
   OpenSSL base, default and FIPS providers were active with the kernel
   FIPS indicator set; 22 end-entity certificates were issued and
   verified across two profiles; all certificates used ECDSA on P-384
   with ecdsa-with-SHA384 signatures and carried non-sequential 20-octet
   serial numbers drawn from a CSPRNG; the certificate revocation list
   was published in DER form at the URI named in the CRL distribution
   points extension; and a newly issued certificate returned an OCSP
   status of "good" and, following revocation with reason
   cessationOfOperation, returned "revoked" with a matching revocation
   time.

Vicente                   Expires 17 March 2027                 [Page 6]
Internet-Draft      Multitenant PKI PQC Requirements      September 2026

5.  Security Considerations

5.1.  Tenant Isolation Failure

   Failure to maintain Tenant Migration State isolation (REQ-MT-1) can
   cause a PQC migration failure in one tenant to cascade to other
   tenants via shared intermediate CA state.  Platform implementations
   MUST use separate intermediate CA contexts per tenant or enforce
   strict logical isolation at the issuance policy layer.

5.2.  Algorithm-Agility Horizon Enforcement

   The Algorithm-Agility Horizon (REQ-MT-2) is only effective if the
   platform enforces it.  Platforms MUST implement automated enforcement
   that prevents issuance of classical certificates to tenants that have
   passed their Algorithm-Agility Horizon, except in documented
   emergency override scenarios with explicit audit logging.

6.  IANA Considerations

   This document has no IANA actions.

7.  Normative References

   [RFC2119]  Bradner, S., "Key words for use in RFCs to Indicate
              Requirement Levels", BCP 14, RFC 2119,
              DOI 10.17487/RFC2119, March 1997,
              <https://www.rfc-editor.org/info/rfc2119>.

   [RFC8174]  Leiba, B., "Ambiguity of Uppercase vs Lowercase in RFC
              2119 Key Words", BCP 14, RFC 8174, DOI 10.17487/RFC8174,
              May 2017, <https://www.rfc-editor.org/info/rfc8174>.

   [RFC8555]  Barnes, R., Hoffman-Andrews, J., McCarney, D., and J.
              Kasten, "Automatic Certificate Management Environment
              (ACME)", RFC 8555, DOI 10.17487/RFC8555, March 2019,
              <https://www.rfc-editor.org/info/rfc8555>.

8.  Informative References

   [FIPS204]  NIST, "Module-Lattice-Based Digital Signature Standard",
              FIPS 204, August 2024.

   [FIPS205]  NIST, "Stateless Hash-Based Digital Signature Standard",
              FIPS 205, August 2024.

Vicente                   Expires 17 March 2027                 [Page 7]
Internet-Draft      Multitenant PKI PQC Requirements      September 2026

   [RFC7942]  Sheffer, Y. and A. Farrel, "Improving Awareness of Running
              Code: The Implementation Status Section", BCP 205,
              RFC 7942, DOI 10.17487/RFC7942, July 2016,
              <https://www.rfc-editor.org/info/rfc7942>.

Appendix A.  Acknowledgements

   The author thanks Mike Ounsworth (Entrust) for valuable feedback on
   draft structure and boilerplate compliance, and the IETF PQUIP,
   LAMPS, and OAuth working groups for their ongoing work on post-
   quantum cryptography standardization.

   CygnetLib (https://github.com/sanctumsecopsmssp/CygnetLib
   (https://github.com/sanctumsecopsmssp/CygnetLib)) serves as the
   reference implementation for algorithms described in this document.
   JSON evidence files including the algorithm registry, CNSA 2.0
   compliance matrix, IETF PQC interoperability status, and ACTV test
   vector results are available in the evidence/ directory of the
   CygnetLib repository.

Changelog

   This revision (-03) adds a unified Posture B IPR notice, a section
   noting awareness of the existing IPR disclosure on record for this
   draft (IPR: 1 on Datatracker), and machine-readable JSON evidence.
   Readers MUST consult the IETF Datatracker IPR tab for this document
   for all current IPR disclosure status.

Author's Address

   Brian Vicente (editor)
   Sanctum SecOps LLC
   128 Dry Run Rd
   Pine City, NY 14871
   United States of America
   Email: bvicente@sanctumsecops.com
   URI:   https://orcid.org/0009-0006-6395-5308

Vicente                   Expires 17 March 2027                 [Page 8]