%% You should probably cite draft-wang-6tisch-6top-sublayer-04 instead of this revision. @techreport{wang-6tisch-6top-sublayer-02, number = {draft-wang-6tisch-6top-sublayer-02}, type = {Internet-Draft}, institution = {Internet Engineering Task Force}, publisher = {Internet Engineering Task Force}, note = {Work in Progress}, url = {https://datatracker.ietf.org/doc/draft-wang-6tisch-6top-sublayer/02/}, author = {Qin Wang and Xavier Vilajosana}, title = {{6TiSCH Operation Sublayer (6top)}}, pagetotal = 14, year = 2015, month = oct, day = 9, abstract = {This document defines the 6TiSCH Operation Sublayer (6top), which offers mechanisms for distributed scheduling in 6TiSCH networks. The 6top sublayer is the next higher layer of the IEEE802.15.4e TSCH medium access control layer. The 6top Protocol (6P) defined in this document allows neighbor nodes to add/delete TSCH cells to one another. To be able to match different application requirements, the algorithm of when to add/delete cells, called the 6top Objective Function (6OF), is left out of scope, and will be specified in one of more companion documents.}, }