@techreport{wang-detnet-joint-scheduling-03, number = {draft-wang-detnet-joint-scheduling-03}, type = {Internet-Draft}, institution = {Internet Engineering Task Force}, publisher = {Internet Engineering Task Force}, note = {Work in Progress}, url = {https://datatracker.ietf.org/doc/draft-wang-detnet-joint-scheduling/03/}, author = {Heng Wang and Ping Wang and Hang Yang}, title = {{Joint Real-Time Scheduling Methods for Deterministic Industrial Field/Backhaul Networks}}, pagetotal = 13, year = 2018, month = may, day = 14, abstract = {In industrial field/backhaul networks, joint real-time scheduling method is important to make end-to-end flows meet their deadline. This document proposes four joint scheduling methods, and they involve four scenarios: time-slotted industrial backhaul network, regarding industrial backhaul network as a black box system, ignoring delay of industrial backhaul and establishing latency model of industrial backhaul network.}, }