Skip to main content

HPC/AI Service Intent Tunnel Realization Model
draft-xkk-teas-hpc-tunnel-realization-00

Document Type Active Internet-Draft (individual)
Authors Quan Xiong , Kireeti Kompella , Daniel King
Last updated 2026-06-29
RFC stream (None)
Intended RFC status (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state I-D Exists
Telechat date (None)
Responsible AD (None)
Send notices to (None)
draft-xkk-teas-hpc-tunnel-realization-00
teas                                                            Q. Xiong
Internet-Draft                                           ZTE Corporation
Intended status: Standards Track                             K. Kompella
Expires: 31 December 2026                                            HPE
                                                                 D. King
                                                    Lancaster University
                                                            29 June 2026

             HPC/AI Service Intent Tunnel Realization Model
                draft-xkk-teas-hpc-tunnel-realization-00

Abstract

   This document defines a tunnel realization model for admitted HPC and
   AI service intent.  The model describes how a service intent instance
   can be associated with network realization state, including tunnel
   references, lifecycle, path, policy, resources, protection, admission
   outcome, and performance monitoring.

Status of This Memo

   This Internet-Draft is submitted in full conformance with the
   provisions of BCP 78 and BCP 79.

   Internet-Drafts are working documents of the Internet Engineering
   Task Force (IETF).  Note that other groups may also distribute
   working documents as Internet-Drafts.  The list of current Internet-
   Drafts is at https://datatracker.ietf.org/drafts/current/.

   Internet-Drafts are draft documents valid for a maximum of six months
   and may be updated, replaced, or obsoleted by other documents at any
   time.  It is inappropriate to use Internet-Drafts as reference
   material or to cite them other than as "work in progress."

   This Internet-Draft will expire on 31 December 2026.

Copyright Notice

   Copyright (c) 2026 IETF Trust and the persons identified as the
   document authors.  All rights reserved.

Xiong, et al.           Expires 31 December 2026                [Page 1]
Internet-Draft          HPC/AI tunnel realization              June 2026

   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents (https://trustee.ietf.org/
   license-info) in effect on the date of publication of this document.
   Please review these documents carefully, as they describe your rights
   and restrictions with respect to this document.  Code Components
   extracted from this document must include Revised BSD License text as
   described in Section 4.e of the Trust Legal Provisions and are
   provided without warranty as described in the Revised BSD License.

Table of Contents

   1.  Introduction  . . . . . . . . . . . . . . . . . . . . . . . .   2
   2.  Conventions Used in This Document . . . . . . . . . . . . . .   3
     2.1.  Requirements Language . . . . . . . . . . . . . . . . . .   3
   3.  Terminology . . . . . . . . . . . . . . . . . . . . . . . . .   3
   4.  Model Scope . . . . . . . . . . . . . . . . . . . . . . . . .   3
   5.  Model Structure . . . . . . . . . . . . . . . . . . . . . . .   4
   6.  Mapping from Service Intent . . . . . . . . . . . . . . . . .   5
   7.  Open Issues and Design Considerations . . . . . . . . . . . .   5
   8.  YANG Data Model . . . . . . . . . . . . . . . . . . . . . . .   6
   9.  Security Considerations . . . . . . . . . . . . . . . . . . .  20
   10. IANA Considerations . . . . . . . . . . . . . . . . . . . . .  20
   11. Acknowledgements  . . . . . . . . . . . . . . . . . . . . . .  21
   12. References  . . . . . . . . . . . . . . . . . . . . . . . . .  21
     12.1.  Normative References . . . . . . . . . . . . . . . . . .  21
     12.2.  Informative References . . . . . . . . . . . . . . . . .  21
   Appendix A.  Example  . . . . . . . . . . . . . . . . . . . . . .  22
   Authors' Addresses  . . . . . . . . . . . . . . . . . . . . . . .  24

1.  Introduction

   A service intent request describes the desired network connectivity
   outcome for an HPC or AI workload.  Once such a request is admitted,
   a network controller or orchestrator may realize it using one or more
   tunnels, traffic engineering paths, policy objects, resource
   reservations, or other technology-specific mechanisms.

   The HP-WAN context for high-throughput, completion-time-aware data
   transfer and host-network collaboration is described in
   [I-D.kcrh-hpwan-state-of-art] and [I-D.xhy-hpwan-framework].

   Related work, such as [I-D.kompella-rtgwg-mlnwsched], discusses
   environments where network behavior can affect the outcome of
   scheduled machine learning workloads.  This document describes the
   network-side realization state associated with an admitted service
   intent request.

Xiong, et al.           Expires 31 December 2026                [Page 2]
Internet-Draft          HPC/AI tunnel realization              June 2026

   The workload manager does not need to configure or understand those
   realization details.  However, operators and controllers need a model
   that correlates admitted service intent with network realization
   state.  This document defines that realization model.

   The model is intended to complement, not replace, existing TE tunnel
   and network configuration models.  It provides HPC/AI-specific
   correlation, policy, resource, lifecycle, and monitoring context
   associated with service intent realization.

2.  Conventions Used in This Document

2.1.  Requirements Language

   The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT",
   "SHOULD", "SHOULD NOT", "RECOMMENDED", "NOT RECOMMENDED", "MAY", and
   "OPTIONAL" in this document are to be interpreted as described in BCP
   14 [RFC2119] [RFC8174] when, and only when, they appear in all
   capitals, as shown here.

3.  Terminology

   The terms Workload, Job, Task, Scheduler, Scheduler Job Metadata,
   Service Intent, Tunnel Realization, and Correlation Identifier are
   defined in [I-D.xkk-teas-hpc-scheduler-job-metadata].  This document
   uses those terms with the meanings defined there.

   In this document, a tunnel realization instance is the network-side
   realization associated with an admitted service intent instance.  It
   is identified by a realization identifier and can reference the
   corresponding service intent, workload, job, and correlation
   identifiers.

4.  Model Scope

   The tunnel realization model represents the network-side state
   created or selected to satisfy an admitted HPC/AI service intent
   request.  It includes references to intent, tunnels, paths, policy,
   resources, protection, and observed performance.

   The model does not define scheduler metadata and does not define the
   service intent request format.  Those are defined separately.

   The model is intended for controllers and orchestrators that realize
   admitted workload-driven service intent within data center and inter-
   data-center network environments.

Xiong, et al.           Expires 31 December 2026                [Page 3]
Internet-Draft          HPC/AI tunnel realization              June 2026

5.  Model Structure

         module: ietf-hpc-tunnel-realization
           augment /te:te/te:tunnels/te:tunnel:
             +--rw hpc-tunnel-realization
                +--rw realization-id?           string
                +--rw intent-ref?               string
                +--rw workload-ref
                |  +--rw workload-id?           string
                |  +--rw job-id?                string
                |  +--rw correlation-id?        string
                +--rw tunnel-type?              identityref
                +--rw realization-status?       identityref
                +--rw admission
                |  +--rw admission-status?      identityref
                |  +--rw decision-time?         yang:date-and-time
                |  +--rw reason?                string
                +--rw tunnel-policy
                |  +--rw rate-policy
                |  |  +--rw min-rate?           uint64
                |  |  +--rw max-rate?           uint64
                |  |  +--rw fixed-rate?         uint64
                |  |  +--rw rate-unit?          identityref
                |  +--rw admission-control-policy
                |  |  +--rw enable?             boolean
                |  +--rw preemption-policy?     identityref
                +--rw tunnel-lifecycle
                |  +--rw requested-start-time?  yang:date-and-time
                |  +--rw admitted-start-time?   yang:date-and-time
                |  +--rw admitted-end-time?     yang:date-and-time
                |  +--rw activation-time?       yang:date-and-time
                |  +--rw completion-time?       yang:date-and-time
                +--rw tunnel-path
                |  +--rw path-ref*              string
                |  +--rw terminals
                |     +--rw source-endpoint?    string
                |     +--rw destination-endpoint? string
                |     +--rw endpoint-group-ref* string
                +--rw tunnel-protection
                |  +--rw protection-type?       identityref
                |  +--rw restoration-priority?  uint32
                +--rw tunnel-resource
                |  +--rw bandwidth?             uint64
                |  +--rw buffer?                uint64
                |  +--rw queue?                 string
                |  +--rw time-slot?             string
                |  +--rw compute-affinity?      string
                +--ro performance-monitor

Xiong, et al.           Expires 31 December 2026                [Page 4]
Internet-Draft          HPC/AI tunnel realization              June 2026

                   +--ro metrics
                    +--ro measured-throughput? uint64
                      +--ro measured-latency?   uint32
                      +--ro measured-loss?      decimal64
                      +--ro last-updated?       yang:date-and-time

                 Figure 1: Tunnel realization model structure

6.  Mapping from Service Intent

   A single service intent instance may be realized by one or more
   tunnels or network service instances.  The realization model uses an
   intent reference to correlate network state with the accepted service
   intent.  For multipoint or endpoint-group communication patterns,
   multiple realization instances may be required.

   The admitted parameters in the realization model can differ from the
   originally requested parameters when the controller accepts a
   modified service.  For example, an admitted start time or admitted
   rate can represent the outcome of admission control and resource
   allocation.

   Future work can define how realization state maps to specific tunnel
   or signaling mechanisms.  Examples of mechanisms that may inform such
   instantiations include Multipath Traffic Engineering
   [I-D.kompella-teas-mpte] and RSVP-based HP-WAN host-network
   collaboration signaling [I-D.xiong-hpwan-signaling-solution].  These
   examples do not constrain the realization model to a specific tunnel
   technology.

7.  Open Issues and Design Considerations

   Future revisions need to define the identity values for realization
   status, admission status, tunnel type, protection type, preemption
   policy, and rate units.  The model also needs to refine how
   realization references are represented when the underlying network
   uses multiple TE technologies or multiple administrative domains.

   The relationship between a service intent instance and one or more
   realized tunnel instances needs further definition, including whether
   explicit tunnel identifiers and names are required in the model.

   The semantics of minimum, maximum, and fixed rate policies need to be
   specified.  The model also needs to distinguish between requested
   resources, allocated resources, and observed resource state, and
   determine how resilience and protection expectations are represented.

Xiong, et al.           Expires 31 December 2026                [Page 5]
Internet-Draft          HPC/AI tunnel realization              June 2026

   Telemetry, monitoring, and status feedback need further definition,
   including how operational measurements are associated with the
   lifecycle of an HPC or AI service request and how those measurements
   are exposed to workload managers and orchestration systems.

8.  YANG Data Model

   The YANG data model is as follows:

module ietf-hpc-tunnel-realization {
  yang-version 1.1;
  namespace "urn:ietf:params:xml:ns:yang:ietf-hpc-tunnel-realization";
  prefix hpc-tunnel;

  import ietf-te {
    prefix te;
    reference
      "RFC 8776: Traffic Engineering Common YANG Types";
  }
  import ietf-yang-types {
    prefix yang;
    reference
      "RFC 6991: Common YANG Data Types";
  }
  import ietf-hpc-service-intent {
    prefix hpc-service;
    reference
      "draft-xkk-teas-hpc-service-intent: HPC/AI Service Intent Model";
  }

  organization
    "IETF Traffic Engineering Architecture and Signaling (TEAS)
     Working Group";
  contact
    "WG Web:   <https://datatracker.ietf.org/wg/teas/>
     WG List:  <mailto:teas@ietf.org>

     Editor:   Quan Xiong
               <mailto:xiong.quan@zte.com.cn>

     Editor:   Kireeti Kompella
               <mailto:kireeti.ietf@gmail.com>

     Editor:   Daniel King
               <mailto:d.king@lancaster.ac.uk>";

  description
    "This module defines a tunnel realization model for admitted HPC

Xiong, et al.           Expires 31 December 2026                [Page 6]
Internet-Draft          HPC/AI tunnel realization              June 2026

     and AI service intent. The model describes how service intent
     instances are associated with network realization state including
     tunnel references, lifecycle, path, policy, resources, protection,
     admission outcome, and performance monitoring.

     Copyright (c) 2026 IETF Trust and the persons identified as
     authors of the code. All rights reserved.

     Redistribution and use in source and binary forms, with or
     without modification, is permitted pursuant to, and subject
     to the license terms contained in, the Revised BSD License
     set forth in Section 4.c of the IETF Trust's Legal Provisions
     Relating to IETF Documents
     (https://trustee.ietf.org/license-info).

     This version of this YANG module is part of RFC XXXX; see
     the RFC itself for full legal notices.";

  revision 2026-04-23 {
    description
      "Initial version of the HPC/AI tunnel realization model.";
    reference
      "RFC XXXX: HPC/AI Service Intent Tunnel Realization Model";
  }

  /*
   * Identity definitions
   */
  identity tunnel-type {
    description
      "Base identity for tunnel types.";
  }

  identity mpls-te {
    base tunnel-type;
    description
      "MPLS Traffic Engineering tunnel.";
  }

  identity sr-te {
    base tunnel-type;
    description
      "Segment Routing Traffic Engineering tunnel.";
  }

  identity sr-policy {
    base tunnel-type;
    description

Xiong, et al.           Expires 31 December 2026                [Page 7]
Internet-Draft          HPC/AI tunnel realization              June 2026

      "Segment Routing policy.";
  }

  identity detnet {
    base tunnel-type;
    description
      "Deterministic Networking tunnel.";
  }

  identity ipsec {
    base tunnel-type;
    description
      "IPsec tunnel.";
  }

  identity realization-status {
    description
      "Base identity for realization status values.";
  }

  identity configuring {
    base realization-status;
    description
      "Tunnel realization is being configured.";
  }

  identity active {
    base realization-status;
    description
      "Tunnel realization is active and operational.";
  }

  identity failed {
    base realization-status;
    description
      "Tunnel realization has failed.";
  }

  identity completed {
    base realization-status;
    description
      "Tunnel realization has completed successfully.";
  }

  identity terminated {
    base realization-status;
    description
      "Tunnel realization has been terminated.";

Xiong, et al.           Expires 31 December 2026                [Page 8]
Internet-Draft          HPC/AI tunnel realization              June 2026

  }

  identity admission-status {
    description
      "Base identity for admission status values.";
  }

  identity pending {
    base admission-status;
    description
      "Admission decision is pending.";
  }

  identity accepted {
    base admission-status;
    description
      "Service intent accepted as requested.";
  }

  identity modified {
    base admission-status;
    description
      "Service intent accepted with modifications.";
  }

  identity rejected {
    base admission-status;
    description
      "Service intent rejected.";
  }

  identity protection-type {
    description
      "Base identity for protection types.";
  }

  identity none {
    base protection-type;
    description
      "No protection.";
  }

  identity path-protection {
    base protection-type;
    description
      "Path protection.";
  }

Xiong, et al.           Expires 31 December 2026                [Page 9]
Internet-Draft          HPC/AI tunnel realization              June 2026

  identity node-protection {
    base protection-type;
    description
      "Node protection.";
  }

  identity link-protection {
    base protection-type;
    description
      "Link protection.";
  }

  identity preemption-policy {
    description
      "Base identity for preemption policies.";
  }

  identity preemptible {
    base preemption-policy;
    description
      "Tunnel can be preempted.";
  }

  identity non-preemptible {
    base preemption-policy;
    description
      "Tunnel cannot be preempted.";
  }

  identity conditionally-preemptible {
    base preemption-policy;
    description
      "Tunnel can be preempted under certain conditions.";
  }

  identity rate-unit {
    description
      "Base identity for rate units.";
  }

  identity bps {
    base rate-unit;
    description
      "Bits per second.";
  }

  identity kbps {
    base rate-unit;

Xiong, et al.           Expires 31 December 2026               [Page 10]
Internet-Draft          HPC/AI tunnel realization              June 2026

    description
      "Kilobits per second.";
  }

  identity mbps {
    base rate-unit;
    description
      "Megabits per second.";
  }

  identity gbps {
    base rate-unit;
    description
      "Gigabits per second.";
  }

  /*
   * Groupings
   */
  grouping workload-reference-grouping {
    description
      "Workload reference for correlating with service intent.";
    leaf workload-id {
      type string;
      description
        "Reference to workload identifier from service intent.";
    }
    leaf job-id {
      type string;
      description
        "Reference to job identifier from service intent.";
    }
    leaf correlation-id {
      type string;
      description
        "Correlation identifier for cross-system tracing.";
    }
  }

  grouping admission-grouping {
    description
      "Admission control state and decision.";
    leaf admission-status {
      type identityref {
        base admission-status;
      }
      description
        "Admission status of the service intent.";

Xiong, et al.           Expires 31 December 2026               [Page 11]
Internet-Draft          HPC/AI tunnel realization              June 2026

    }
    leaf decision-time {
      type yang:date-and-time;
      description
        "Time when the admission decision was made.";
    }
    leaf reason {
      type string;
      description
        "Reason for the admission decision.";
    }
  }

  grouping rate-policy-grouping {
    description
      "Rate policy for the tunnel.";
    leaf min-rate {
      type uint64;
      description
        "Minimum guaranteed rate.";
    }
    leaf max-rate {
      type uint64;
      description
        "Maximum allowed rate.";
    }
    leaf fixed-rate {
      type uint64;
      description
        "Fixed committed rate.";
    }
    leaf rate-unit {
      type identityref {
        base rate-unit;
      }
      description
        "Unit for rate values.";
    }
  }

  grouping admission-control-policy-grouping {
    description
      "Admission control policy.";
    leaf enable {
      type boolean;
      description
        "Whether admission control is enabled.";
    }

Xiong, et al.           Expires 31 December 2026               [Page 12]
Internet-Draft          HPC/AI tunnel realization              June 2026

  }

  grouping tunnel-policy-grouping {
    description
      "Tunnel policy configuration.";
    container rate-policy {
      description
        "Rate policy for the tunnel.";
      uses rate-policy-grouping;
    }
    container admission-control-policy {
      description
        "Admission control policy.";
      uses admission-control-policy-grouping;
    }
    leaf preemption-policy {
      type identityref {
        base preemption-policy;
      }
      description
        "Preemption policy for the tunnel.";
    }
  }

  grouping tunnel-lifecycle-grouping {
    description
      "Tunnel lifecycle timing information.";
    leaf requested-start-time {
      type yang:date-and-time;
      description
        "Requested start time from service intent.";
    }
    leaf admitted-start-time {
      type yang:date-and-time;
      description
        "Admitted start time after admission control.";
    }
    leaf admitted-end-time {
      type yang:date-and-time;
      description
        "Admitted end time for the tunnel.";
    }
    leaf activation-time {
      type yang:date-and-time;
      description
        "Time when the tunnel was activated.";
    }
    leaf completion-time {

Xiong, et al.           Expires 31 December 2026               [Page 13]
Internet-Draft          HPC/AI tunnel realization              June 2026

      type yang:date-and-time;
      description
        "Time when the tunnel completed successfully.";
    }
  }

  grouping tunnel-path-grouping {
    description
      "Tunnel path and endpoint information.";
    leaf-list path-ref {
      type string;
      description
        "References to TE paths or LSPs realizing this tunnel.";
    }
    container terminals {
      description
        "Terminal endpoints of the tunnel.";
      leaf source-endpoint {
        type string;
        description
          "Source endpoint identifier.";
      }
      leaf destination-endpoint {
        type string;
        description
          "Destination endpoint identifier.";
      }
      leaf-list endpoint-group-ref {
        type string;
        description
          "References to endpoint groups from service intent.";
      }
    }
  }

  grouping tunnel-protection-grouping {
    description
      "Tunnel protection configuration.";
    leaf protection-type {
      type identityref {
        base protection-type;
      }
      description
        "Type of protection for the tunnel.";
    }
    leaf restoration-priority {
      type uint32;
      description

Xiong, et al.           Expires 31 December 2026               [Page 14]
Internet-Draft          HPC/AI tunnel realization              June 2026

        "Restoration priority for the tunnel.";
    }
  }

  grouping tunnel-resource-grouping {
    description
      "Tunnel resource allocation.";
    leaf bandwidth {
      type uint64;
      description
        "Allocated bandwidth for the tunnel.";
    }
    leaf buffer {
      type uint64;
      description
        "Allocated buffer space for the tunnel.";
    }
    leaf queue {
      type string;
      description
        "Queue identifier for the tunnel traffic.";
    }
    leaf time-slot {
      type string;
      description
        "Time slot allocation for time-aware scheduling.";
    }
    leaf compute-affinity {
      type string;
      description
        "Compute affinity or placement constraints.";
    }
  }

  grouping performance-metrics-grouping {
    description
      "Performance monitoring metrics.";
    leaf measured-throughput {
      type uint64;
      description
        "Measured throughput of the tunnel.";
    }
    leaf measured-latency {
      type uint32;
      description
        "Measured latency of the tunnel.";
    }
    leaf measured-loss {

Xiong, et al.           Expires 31 December 2026               [Page 15]
Internet-Draft          HPC/AI tunnel realization              June 2026

      type decimal64 {
        fraction-digits 6;
      }
      description
        "Measured packet loss rate.";
    }
    leaf last-updated {
      type yang:date-and-time;
      description
        "Time when metrics were last updated.";
    }
  }

  grouping performance-monitor-grouping {
    description
      "Performance monitoring container.";
    container metrics {
      description
        "Performance metrics for the tunnel.";
      uses performance-metrics-grouping;
    }
  }

  /*
   * Augment to TE tunnel model
   */
  augment "/te:te/te:tunnels/te:tunnel" {
    description
      "Augment TE tunnel with HPC/AI realization information.";

    container hpc-tunnel-realization {
      description
        "HPC/AI tunnel realization information.";

      leaf realization-id {
        type string;
        description
          "Unique identifier for this tunnel realization instance.";
      }

      leaf intent-ref {
        type leafref {
          path "/hpc-service:hpc-service-intent/hpc-service:intent/hpc-service:intent-id";
        }
        description
          "Reference to the service intent instance being realized.";
      }

Xiong, et al.           Expires 31 December 2026               [Page 16]
Internet-Draft          HPC/AI tunnel realization              June 2026

      container workload-ref {
        description
          "Reference to workload metadata from service intent.";
        uses workload-reference-grouping;
      }

      leaf tunnel-type {
        type identityref {
          base tunnel-type;
        }
        description
          "Type of tunnel used for realization.";
      }

      leaf realization-status {
        type identityref {
          base realization-status;
        }
        description
          "Current status of the tunnel realization.";
      }

      container admission {
        description
          "Admission control state and decision.";
        uses admission-grouping;
      }

      container tunnel-policy {
        description
          "Tunnel policy configuration.";
        uses tunnel-policy-grouping;
      }

      container tunnel-lifecycle {
        description
        "Tunnel lifecycle timing information.";
        uses tunnel-lifecycle-grouping;
      }

      container tunnel-path {
        description
          "Tunnel path and endpoint information.";
        uses tunnel-path-grouping;
      }

      container tunnel-protection {
        description

Xiong, et al.           Expires 31 December 2026               [Page 17]
Internet-Draft          HPC/AI tunnel realization              June 2026

          "Tunnel protection configuration.";
        uses tunnel-protection-grouping;
      }

      container tunnel-resource {
        description
          "Tunnel resource allocation.";
        uses tunnel-resource-grouping;
      }

      container performance-monitor {
        config false;
        description
          "Performance monitoring information (read-only).";
        uses performance-monitor-grouping;
      }
    }
  }

  /*
   * Notifications
   */
  notification tunnel-realization-status-change {
    description
      "Notification sent when tunnel realization status changes.";

    leaf realization-id {
      type leafref {
        path "/te:te/te:tunnels/te:tunnel/hpc-tunnel-realization:hpc-tunnel-realization/hpc-tunnel-realization:realization-id";
      }
      description
        "Identifier of the tunnel realization instance.";
    }

    leaf intent-ref {
      type leafref {
        path "/te:te/te:tunnels/te:tunnel/hpc-tunnel-realization:hpc-tunnel-realization/hpc-tunnel-realization:intent-ref";
      }
      description
        "Reference to the associated service intent.";
    }

    leaf old-status {
      type identityref {
        base realization-status;
      }
      description
        "Previous status of the tunnel realization.";

Xiong, et al.           Expires 31 December 2026               [Page 18]
Internet-Draft          HPC/AI tunnel realization              June 2026

    }

    leaf new-status {
      type identityref {
        base realization-status;
      }
      description
        "New status of the tunnel realization.";
    }

    leaf change-time {
      type yang:date-and-time;
      description
        "Time when the status change occurred.";
    }

    leaf reason {
      type string;
      description
        "Reason for the status change.";
    }
  }

  notification tunnel-performance-threshold-breached {
    description
      "Notification sent when tunnel performance breaches threshold.";

    leaf realization-id {
      type leafref {
        path "/te:te/te:tunnels/te:tunnel/hpc-tunnel-realization:hpc-tunnel-realization/hpc-tunnel-realization:realization-id";
      }
      description
        "Identifier of the tunnel realization instance.";
    }

    leaf metric {
      type enumeration {
        enum throughput {
          description "Throughput metric.";
        }
        enum latency {
          description "Latency metric.";
        }
        enum loss {
          description "Loss metric.";
        }
      }
      description

Xiong, et al.           Expires 31 December 2026               [Page 19]
Internet-Draft          HPC/AI tunnel realization              June 2026

        "Performance metric that breached threshold.";
    }

    leaf measured-value {
      type uint64;
      description
        "Measured value that breached the threshold.";
    }

    leaf threshold-value {
      type uint64;
      description
        "Threshold value that was breached.";
    }

    leaf breach-time {
      type yang:date-and-time;
      description
        "Time when the threshold was breached.";
    }
  }
}

9.  Security Considerations

   Tunnel realization state can reveal network topology, resource
   allocation, service timing, endpoint information, and operational
   performance.  Implementations need to restrict access to authorized
   entities and protect management exchanges using authentication,
   authorization, and transport protection.  Write access to realization
   state needs to be controlled to prevent unauthorized resource
   consumption or disruption of admitted workload services.

10.  IANA Considerations

   IANA is requested to register one URI in the "IETF XML Registry"
   [RFC3688].  Following the format in [RFC3688], the following
   registration is requested:

      URI: urn:ietf:params:xml:ns:yang:ietf-hpc-tunnel-realization

      Registrant Contact: The IESG.

      XML: N/A; the requested URI is an XML namespace.

   IANA is requested to register the following YANG module in the "YANG
   Module Names" registry [RFC6020].

Xiong, et al.           Expires 31 December 2026               [Page 20]
Internet-Draft          HPC/AI tunnel realization              June 2026

      name: ietf-hpc-tunnel-realization

      namespace: urn:ietf:params:xml:ns:yang:ietf-hpc-tunnel-realization

      prefix: hpc-tunnel

      reference: RFC XXXX

11.  Acknowledgements

   The authors acknowledge the related HP-WAN framework and problem
   statement work that provides the broader context for this tunnel
   realization model.

12.  References

12.1.  Normative References

   [RFC2119]  Bradner, S., "Key words for use in RFCs to Indicate
              Requirement Levels", BCP 14, RFC 2119,
              DOI 10.17487/RFC2119, March 1997,
              <https://www.rfc-editor.org/info/rfc2119>.

   [RFC8174]  Leiba, B., "Ambiguity of Uppercase vs Lowercase in RFC
              2119 Key Words", BCP 14, RFC 8174, DOI 10.17487/RFC8174,
              May 2017, <https://www.rfc-editor.org/info/rfc8174>.

12.2.  Informative References

   [I-D.kcrh-hpwan-state-of-art]
              King, D., Chown, T., Rapier, C., Huang, D., and K. Yao,
              "Current State of the Art for High Performance Wide Area
              Networks", Work in Progress, Internet-Draft, draft-kcrh-
              hpwan-state-of-art-03, 20 October 2025,
              <https://datatracker.ietf.org/doc/html/draft-kcrh-hpwan-
              state-of-art-03>.

   [I-D.kompella-rtgwg-mlnwsched]
              Kompella, K., Beeram, V. P., Mahale, A., Bhargava, R., and
              N. Geyer, "Scheduling Network Resources for Machine
              Learning Clusters", Work in Progress, Internet-Draft,
              draft-kompella-rtgwg-mlnwsched-02, 1 March 2026,
              <https://datatracker.ietf.org/doc/html/draft-kompella-
              rtgwg-mlnwsched-02>.

   [I-D.kompella-teas-mpte]
              Kompella, K., Jalil, L., Khaddam, M., and A. Smith,
              "Multipath Traffic Engineering", Work in Progress,

Xiong, et al.           Expires 31 December 2026               [Page 21]
Internet-Draft          HPC/AI tunnel realization              June 2026

              Internet-Draft, draft-kompella-teas-mpte-02, 2 March 2026,
              <https://datatracker.ietf.org/doc/html/draft-kompella-
              teas-mpte-02>.

   [I-D.xhy-hpwan-framework]
              Xiong, Q., Huang, G., Yao, K., and C. Lin, "Framework for
              High Performance Wide Area Network (HP-WAN)", Work in
              Progress, Internet-Draft, draft-xhy-hpwan-framework-03, 20
              October 2025, <https://datatracker.ietf.org/doc/html/
              draft-xhy-hpwan-framework-03>.

   [I-D.xiong-hpwan-problem-statement]
              Xiong, Q., Yao, K., Huang, C., Han, Z., and J. Zhao,
              "Problem Statement for High Performance Wide Area
              Networks", Work in Progress, Internet-Draft, draft-xiong-
              hpwan-problem-statement-03, 25 February 2025,
              <https://datatracker.ietf.org/doc/html/draft-xiong-hpwan-
              problem-statement-03>.

   [I-D.xiong-hpwan-signaling-solution]
              Xiong, Q., Zhu, X., and C. Lin, "Signaling Solution for
              HP-WAN", Work in Progress, Internet-Draft, draft-xiong-
              hpwan-signaling-solution-00, 7 July 2025,
              <https://datatracker.ietf.org/doc/html/draft-xiong-hpwan-
              signaling-solution-00>.

   [I-D.xkk-teas-hpc-scheduler-job-metadata]
              Xiong, Q., Kompella, K., and D. King, "HPC/AI Scheduler
              Job Metadata Model", Work in Progress, Internet-Draft,
              draft-xkk-teas-hpc-scheduler-job-metadata-00, 23 April
              2026, <https://datatracker.ietf.org/doc/html/draft-xkk-
              teas-hpc-scheduler-job-metadata-00>.

   [I-D.xkk-teas-hpc-service-intent]
              Xiong, Q., Kompella, K., and D. King, "HPC/AI Service
              Intent Model", Work in Progress, Internet-Draft, draft-
              xkk-teas-hpc-service-intent-00, 23 April 2026,
              <https://datatracker.ietf.org/doc/html/draft-xkk-teas-hpc-
              service-intent-00>.

Appendix A.  Example

   Example tunnel realization for the admitted AI training service
   intent:

Xiong, et al.           Expires 31 December 2026               [Page 22]
Internet-Draft          HPC/AI tunnel realization              June 2026

   "ietf-hpc-tunnel-realization:hpc-tunnel-realization": {
          "realization-id": "tunnel-realization-001",
          "intent-ref": "ai-training-job-2026-001",
          "workload-ref": {
            "workload-id": "distributed-training-001",
            "job-id": "job-2026-04-23-001",
            "correlation-id": "corr-ai-training-001"
          },
          "tunnel-type": "mpls-te",
          "realization-status": "active",
          "admission": {
            "admission-status": "accepted",
            "decision-time": "2026-04-23T09:50:00Z",
            "reason": "Resources allocated as requested"
          },
          "tunnel-policy": {
            "rate-policy": {
              "min-rate": 100000000000,
              "max-rate": 400000000000,
              "fixed-rate": 200000000000,
              "rate-unit": "bps"
            },
            "admission-control-policy": {
              "enable": true
            },
            "preemption-policy": "non-preemptible"
          },
          "tunnel-lifecycle": {
            "requested-start-time": "2026-04-23T10:00:00Z",
            "admitted-start-time": "2026-04-23T10:00:00Z",
            "admitted-end-time": "2026-04-23T12:00:00Z",
            "activation-time": "2026-04-23T09:55:00Z"
          },
          "tunnel-path": {
            "path-ref": [
              "te-tunnel-dc-west-to-dc-east-001"
            ],
            "terminals": {
              "source-endpoint": "192.0.2.10",
              "destination-endpoint": "198.51.100.20",
              "endpoint-group-ref": [
                "worker-nodes"
              ]
            }
          },
          "tunnel-protection": {
            "protection-type": "path-protection",
            "restoration-priority": 50

Xiong, et al.           Expires 31 December 2026               [Page 23]
Internet-Draft          HPC/AI tunnel realization              June 2026

          },
          "tunnel-resource": {
            "bandwidth": 200000000000,
            "buffer": 10000000,
            "queue": "high-priority-queue",
            "time-slot": "2026-04-23T10:00:00Z/2026-04-23T12:00:00Z"
          },
          "performance-monitor": {
            "metrics": {
              "measured-throughput": 195000000000,
              "measured-latency": 4,
              "measured-loss": 0.00005,
              "last-updated": "2026-04-23T10:15:00Z"
            }
          }
        }
      }

Authors' Addresses

   Quan Xiong
   ZTE Corporation
   Email: xiong.quan@zte.com.cn

   Kireeti Kompella
   HPE
   Email: kireeti.ietf@gmail.com

   Daniel King
   Lancaster University
   Email: d.king@lancaster.ac.uk

Xiong, et al.           Expires 31 December 2026               [Page 24]