Skip to main content

Minutes for TICTOC at IETF-96
minutes-96-tictoc-1

Meeting Minutes Timing over IP Connection and Transfer of Clock (tictoc) WG
Date and time 2016-07-18 16:00
Title Minutes for TICTOC at IETF-96
State Active
Other versions plain text
Last updated 2016-09-12

minutes-96-tictoc-1
Joint TICTOC and NTP WG Meetings
IETF 96 - Berlin

These meetings occurred in 4 segments over the course of the week…
1) Working meeting of NTP security and BCP teams (Mon, 18 July, 14:00 - 17:30
CEST) 2) Joint NTP/TICTOC WG business meeting (Mon, 18 July, 19:00 - 20:00
CEST) 3) Working meeting of the NTS design team (Tue, 18 July, 10:00 - 12:00
CEST) 3) Report out of additional side meetings during the week (Fri, 22 July,
12:20 - 13:20 CEST)

Monday, 18 July 2016, 14:00 - 17:30 CEST, Location: Tegel
=========================================================
The side meeting focused on addressing questions around the requirements and
security posture of the NTS documents and the proposed additional mechanism
based on DTLS. There needs to be some additional work to collect and validate
some requirements and assumptions related to large scale NTP server operations
like NIST. An update to the DTLS proposal along with discussion on how it fits
into the existing solution is required.

* NTP WGLC Design Team discussions:
  draft-ietf-ntp-network-time-security-14
  draft-ietf-ntp-cms-for-nts-message-06
  draft-ietf-ntp-using-nts-for-ntp-05

  draft-dfranke-ntp-keyid0-00
  draft-aanchal4-ntp-mac-00

* NTP BCP (Reilly)
  draft-reilly-ntp-bcp-02

Monday, 18 July, 19:00 - 20:00 CEST, Tiergarten
===============================================
NTP WG Agenda:

* NTP WG status (Chairs)

* NTP WGLC Design Team discussions:
  draft-ietf-ntp-network-time-security-14
  draft-ietf-ntp-cms-for-nts-message-06
  draft-ietf-ntp-using-nts-for-ntp-05

  draft-dfranke-ntp-keyid0-00
  draft-aanchal4-ntp-mac-00

The NTS WGLC design team continues to make progress, but there are still a
number of outstanding questions to be pursued. Daniel Franke plans to provide
an updated proposal for DTLS in the next 3-4 weeks. There is consensus to do a
face to face interim to progress this work in the Boston area in October,
perhaps in conjunction with the IEEE 1588 meeting.

* NTP BCP (Reilly)
  draft-reilly-ntp-bcp-02

The NTP BCP is ready to be adopted as a working group document. Send to WGLC in
advance of the Seoul IETF.

* Extension Field Drafts
  draft-stenn-ntp-i-do
  draft-stenn-ntp-last-extension
  draft-mayer-ntp-mac-extension-field

There were no updates to the extension field drafts. These need further
discussion amongst the key contributors.

* REFID Drafts
  draft-stenn-ntp-ipv6-refid-hash
  draft-stenn-ntp-suggest-refid
  draft-stenn-ntp-leap-smear-refid
  draft-stenn-ntp-not-you-refid

The REFID drafts should also be condensed. There is a difference however in the
drafts that are proposing new mechanisms and drafts that clarify or fix
existing issues related to the REFID.

* NTP Mode 6
  draft-haberman-ntpwg-mode-6-cmds

There was extensive discussion on whether we should pursue this document or
not. The commands exist in the implementation and should be properly
documented. However there is concern that they should actually be made historic
because we don’t want to encourage their continued use. The thought is to
publish them as historic right away.

Tuesday, 19 July 2016, 10:00 - 12:00 CEST, Location: Tegel
==========================================================
The NTS WGLC design team continued discussions related to clarification of
assumptions and requirements and furthering understanding of the details of the
various options under discussion. At this point, a written proposal is really
needed in order to progress the work. It is hoped to have a document within a
month.

Friday, 22 July, 12:20 - 13:20 CEST, Charlottenburg II/III
==========================================================
TICTOC Agenda:

* Next steps on collaboration with IEEE 1588 on MIB and YANG modules
(resolution from joint IEEE/IETF meeting)

There was no resolution from the joint IEEE/IETF meeting regarding the
publication of the MIB. There will be a separate call with IEEE and IETF
leadership and lawyers to resolve this issue. Pat Thayer will be helping to
coordinate that call. The authors have an additional set of comments to address
in the meantime.

* Yang Data Model for IEEE 1588v2
  draft-jlx-tictoc-1588v2-yang-02

It was clarified that the IEEE release being requested was within the scope of
the individual authors responsibility. They are free to sign it if they wish.
The Yang module can be accepted as a working group item.

* Update on Problem Statements for Scalable Synchronization Networks
  draft-hjxl-ssn-ps-00

At this time, there are no spare resources to pursue this work.

* reports from any ad-hoc NTP discussions during the week

The second break out session for the NTS WGLC design team was focused on
further discussion of the requirements and questions for clarification. There
is no additional progress to report.

* Continue monthly virtual meetings

There was consensus to continue the monthly virtual meetings going forward.

* Charter work

There is consensus to combine the two working groups into one and recharter. It
is planned to do this before the IETF in Seoul.