Early Review of draft-ietf-bess-datacenter-gateway-10
review-ietf-bess-datacenter-gateway-10-rtgdir-early-singh-2021-05-01-00
| Request | Review of | draft-ietf-bess-datacenter-gateway |
|---|---|---|
| Requested revision | No specific revision (document currently at 13) | |
| Type | Early Review | |
| Team | Routing Area Directorate (rtgdir) | |
| Deadline | 2021-04-30 | |
| Requested | 2021-04-15 | |
| Requested by | Martin Vigoureux | |
| Authors | Adrian Farrel , John Drake , Eric C. Rosen , Keyur Patel , Luay Jalil | |
| Draft last updated | 2021-05-01 | |
| Completed reviews |
Rtgdir Early review of -06
by
Ravi Singh
(diff)
Rtgdir Early review of -10 by Ravi Singh (diff) Genart Last Call review of -10 by Gyan Mishra (diff) Secdir Last Call review of -10 by Daniel Migault (diff) |
|
| Assignment | Reviewer | Ravi Singh |
| State | Completed | |
| Review |
review-ietf-bess-datacenter-gateway-10-rtgdir-early-singh-2021-05-01
|
|
| Posted at | https://mailarchive.ietf.org/arch/msg/rtg-dir/p2hbzYgQnds3moTEqUW8wyXh57I | |
| Reviewed revision | 10 (document currently at 13) | |
| Result | Ready | |
| Completed | 2021-05-01 |
review-ietf-bess-datacenter-gateway-10-rtgdir-early-singh-2021-05-01-00
Hello I have been selected to do a routing directorate “early” review of this draft. draft-ietf-bess-datacenter-gateway The routing directorate will, on request from the working group chair, perform an “early” review of a draft before it is submitted for publication to the IESG. The early review can be performed at any time during the draft’s lifetime as a working group document. The purpose of the early review depends on the stage that the document has reached. Document: draft-ietf-bess-datacenter-gateway-10.txt Reviewer: Ravi Singh Review Date: 04/30/2021 Intended Status: Standards Track Summary: No issues found. This documents is ready to proceed to the IESG. Regards Ravi