Skip to main content

Last Call Review of draft-ietf-bess-evpn-virtual-eth-segment-08
review-ietf-bess-evpn-virtual-eth-segment-08-genart-lc-shirazipour-2023-04-24-00

Request Review of draft-ietf-bess-evpn-virtual-eth-segment
Requested revision No specific revision (document currently at 19)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2023-04-27
Requested 2023-04-13
Authors Ali Sajassi , Patrice Brissette , Rick Schell , John Drake , Jorge Rabadan
I-D last updated 2023-04-24
Completed reviews Genart Last Call review of -08 by Meral Shirazipour (diff)
Intdir Telechat review of -13 by Brian Haberman (diff)
Rtgdir Last Call review of -07 by Jonathan Hardwick (diff)
Assignment Reviewer Meral Shirazipour
State Completed
Request Last Call review on draft-ietf-bess-evpn-virtual-eth-segment by General Area Review Team (Gen-ART) Assigned
Posted at https://mailarchive.ietf.org/arch/msg/gen-art/KDZjDqHYF-nUsxkJvt9EykS0-kw
Reviewed revision 08 (document currently at 19)
Result Ready w/nits
Completed 2023-04-24
review-ietf-bess-evpn-virtual-eth-segment-08-genart-lc-shirazipour-2023-04-24-00
I am the assigned Gen-ART reviewer for this draft. The General Area
Review Team (Gen-ART) reviews all IETF documents being processed
by the IESG for the IETF Chair.  Please treat these comments just
like any other last call comments.

For more information, please see the FAQ at

<https://trac.ietf.org/trac/gen/wiki/GenArtfaq>.

Document: draft-ietf-bess-evpn-virtual-eth-segment-08
Reviewer: Meral Shirazipour
Review Date: 2023-04-24
IETF LC End Date: 2023-04-27
IESG Telechat date: Not scheduled for a telechat

Summary: This draft is almost ready to be published as Standard RFC, no other
comments than those on the list.

Major issues:

Minor issues:

Nits/editorial comments:
-Section 1 , "This document extends the Ethernet Segment concept so that an ES
can
   be associated to a set of EVCs (e.g., VLANs) or other objects such as
   MPLS Label Switch Paths (LSPs) or Pseudowires (PWs), referred to as
   Virtual Ethernet Segments (vES)." & Section 1.1

It would be great to add a sentence on why we need this and what is the current
alternative.

-[Page 20], Section 5.4, "large numbe of "--->"large number of "