Skip to main content

Last Call Review of draft-ietf-bess-evpn-vpls-seamless-integ-04
review-ietf-bess-evpn-vpls-seamless-integ-04-rtgdir-lc-qu-2018-05-28-00

Request Review of draft-ietf-bess-evpn-vpls-seamless-integ
Requested revision No specific revision (document currently at 07)
Type Last Call Review
Team Routing Area Directorate (rtgdir)
Deadline 2018-05-28
Requested 2018-05-07
Requested by Martin Vigoureux
Authors Ali Sajassi , Samer Salam , Nick Del Regno , Jorge Rabadan
I-D last updated 2018-05-28
Completed reviews Rtgdir Last Call review of -04 by Yingzhen Qu (diff)
Genart Last Call review of -05 by Pete Resnick (diff)
Opsdir Last Call review of -05 by Linda Dunbar (diff)
Secdir Last Call review of -05 by Stephen Kent (diff)
Assignment Reviewer Yingzhen Qu
State Completed
Request Last Call review on draft-ietf-bess-evpn-vpls-seamless-integ by Routing Area Directorate Assigned
Reviewed revision 04 (document currently at 07)
Result Ready
Completed 2018-05-28
review-ietf-bess-evpn-vpls-seamless-integ-04-rtgdir-lc-qu-2018-05-28-00
Hello,

I have been selected as the Routing Directorate reviewer for this draft. The
Routing Directorate seeks to review all routing or routing-related drafts as
they pass through IETF last call and IESG review, and sometimes on special
request. The purpose of the review is to provide assistance to the Routing ADs.
For more information about the Routing Directorate, please see
​http://trac.tools.ietf.org/area/rtg/trac/wiki/RtgDir<http://trac.tools.ietf.org/area/rtg/trac/wiki/RtgDir>

Although these comments are primarily for the use of the Routing ADs, it would
be helpful if you could consider them along with any other IETF Last Call
comments that you receive, and strive to resolve them through discussion or by
updating the draft.

Document: draft-ietf-bess-evpn-vpls-seamless-integ-04.txt
Reviewer: Yingzhen Qu
Review Date: 5/28/2018
IETF LC End Date: 4/23/2018
Intended Status: Standards Track

Summary:
      No issues found. This document is ready for publication.

Comments:
The draft is well written and ready-to-go. It has been widely reviewed and
discussed over a number of years, and nits/editorial comments were addressed
during WG LC. This draft proposes procedures by which EVPN and PBB-EVPN can be
introduced into VPLS and PBB-VPLS networks without requiring any software or
hardware upgrades.

Major Issues:
No major issues found.

Minor Issues:
No minor issues found.

Nits:
No nits found.

Thanks,
Yingzhen