Skip to main content

Telechat Review of draft-ietf-bess-pta-flags-02
review-ietf-bess-pta-flags-02-genart-telechat-carpenter-2016-04-28-00

Request Review of draft-ietf-bess-pta-flags
Requested revision No specific revision (document currently at 03)
Type Telechat Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2016-05-03
Requested 2016-04-14
Authors Eric C. Rosen , Thomas Morin
I-D last updated 2016-04-28
Completed reviews Genart Last Call review of -02 by Brian E. Carpenter (diff)
Genart Telechat review of -02 by Brian E. Carpenter (diff)
Secdir Last Call review of -02 by Christian Huitema (diff)
Opsdir Last Call review of -02 by Nevil Brownlee (diff)
Assignment Reviewer Brian E. Carpenter
State Completed
Request Telechat review on draft-ietf-bess-pta-flags by General Area Review Team (Gen-ART) Assigned
Reviewed revision 02 (document currently at 03)
Result Ready
Completed 2016-04-28
review-ietf-bess-pta-flags-02-genart-telechat-carpenter-2016-04-28-00
I am the assigned Gen-ART reviewer for this draft. The General Area
Review Team (Gen-ART) reviews all IETF documents being processed
by the IESG for the IETF Chair. Please wait for direction from your
document shepherd or AD before posting a new version of the draft.

For more information, please see the FAQ at
<

http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>.

Document: draft-ietf-bess-pta-flags-02.txt
Reviewer: Brian Carpenter
Review Date: 2016-04-28
IETF LC End Date: 2016-04-13
IESG Telechat date: 2016-05-05

Summary: Ready
--------

Comment: It was a pleasure to read such a well-written draft.
--------