Telechat Review of draft-ietf-dime-load-08
review-ietf-dime-load-08-genart-telechat-even-2017-03-11-00

Request Review of draft-ietf-dime-load
Requested rev. no specific revision (document currently at 09)
Type Telechat Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2017-03-14
Requested 2017-02-14
Draft last updated 2017-03-11
Completed reviews Opsdir Last Call review of -07 by Will LIU (diff)
Genart Last Call review of -07 by Roni Even (diff)
Genart Telechat review of -08 by Roni Even (diff)
Assignment Reviewer Roni Even
State Completed
Review review-ietf-dime-load-08-genart-telechat-even-2017-03-11
Reviewed rev. 08 (document currently at 09)
Review result Ready
Review completed: 2017-03-11

Review
review-ietf-dime-load-08-genart-telechat-even-2017-03-11

I am the assigned Gen-ART reviewer for this draft. The General Area
Review Team (Gen-ART) reviews all IETF documents being processed
by the IESG for the IETF Chair. Please wait for direction from your
document shepherd or AD before posting a new version of the draft.

For more information, please see the FAQ at

<https://trac.ietf.org/trac/gen/wiki/GenArtfaq>.

Document: draft-ietf-dime-load-??
Reviewer: Roni Even
Review Date: 2017-03-11
IETF LC End Date: 2017-02-27
IESG Telechat date: 2017-03-16

Summary: The document is ready for publication as a standard track RFC

Major issues:

Minor issues:

Nits/editorial comments: