Telechat Review of draft-ietf-ecrit-ecall-23
review-ietf-ecrit-ecall-23-genart-telechat-shirazipour-2017-01-19-00
| Request | Review of | draft-ietf-ecrit-ecall |
|---|---|---|
| Requested revision | No specific revision (document currently at 27) | |
| Type | Telechat Review | |
| Team | General Area Review Team (Gen-ART) (genart) | |
| Deadline | 2017-01-17 | |
| Requested | 2016-12-16 | |
| Authors | Randall Gellens , Hannes Tschofenig | |
| I-D last updated | 2018-12-20 (Latest revision 2017-02-14) | |
| Completed reviews |
Genart IETF Last Call review of -21
by Meral Shirazipour
(diff)
Secdir IETF Last Call review of -21 by Dacheng Zhang (diff) Opsdir IETF Last Call review of -21 by Nevil Brownlee (diff) Genart Telechat review of -23 by Meral Shirazipour (diff) |
|
| Assignment | Reviewer | Meral Shirazipour |
| State | Completed | |
| Request | Telechat review on draft-ietf-ecrit-ecall by General Area Review Team (Gen-ART) Assigned | |
| Reviewed revision | 23 (document currently at 27) | |
| Result | Ready | |
| Completed | 2017-01-19 |
review-ietf-ecrit-ecall-23-genart-telechat-shirazipour-2017-01-19-00
I am the assigned Gen-ART reviewer for this draft. The General Area Review Team (Gen-ART) reviews all IETF documents being processed by the IESG for the IETF Chair. Please wait for direction from your document shepherd or AD before posting a new version of the draft. For more information, please see the FAQ at <http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>. Document: draft-ietf-ecrit-ecall-23 Reviewer: Meral Shirazipour Review Date: 2017-01-18 IETF LC End Date: 2017-01-06 IESG Telechat date: 2017-01-19 Summary: This draft is ready to be published as Standards RFC. Major issues: Minor issues: Nits/editorial comments: Best Regards, Meral --- Meral Shirazipour Ericsson Research www.ericsson.com