Skip to main content

Last Call Review of draft-ietf-eman-battery-mib-12
review-ietf-eman-battery-mib-12-genart-lc-krishnan-2014-07-09-00

Request Review of draft-ietf-eman-battery-mib
Requested revision No specific revision (document currently at 20)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2014-06-30
Requested 2014-06-19
Authors Juergen Quittek , Rolf Winter , Thomas Dietz
I-D last updated 2014-07-09
Completed reviews Genart Last Call review of -12 by Suresh Krishnan (diff)
Genart Telechat review of -15 by Suresh Krishnan (diff)
Secdir Last Call review of -12 by Scott G. Kelly (diff)
Assignment Reviewer Suresh Krishnan
State Completed
Request Last Call review on draft-ietf-eman-battery-mib by General Area Review Team (Gen-ART) Assigned
Reviewed revision 12 (document currently at 20)
Result Ready
Completed 2014-07-09
review-ietf-eman-battery-mib-12-genart-lc-krishnan-2014-07-09-00
I have been selected as the General Area Review Team (Gen-ART) reviewer

for this draft (for background on Gen-ART, please see



http://www.alvestrand.no/ietf/gen/art/gen-art-FAQ.html

).

 

Please wait for direction from your document shepherd or AD before

posting a new version of the draft.

 

Document: draft-ietf-eman-battery-mib-12

Reviewer: Suresh Krishnan

Review Date: 2014/07/08

IESG Telechat date: 2014/07/10

 

Summary: This draft is ready for publication as a Proposed Standard.


Thanks

Suresh