Skip to main content

Last Call Review of draft-ietf-eman-energy-aware-mib-15
review-ietf-eman-energy-aware-mib-15-genart-lc-gurbani-2014-06-23-00

Request Review of draft-ietf-eman-energy-aware-mib
Requested revision No specific revision (document currently at 17)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2014-06-30
Requested 2014-06-19
Authors John Parello , Benoît Claise , Mouli Chandramouli
I-D last updated 2014-06-23
Completed reviews Genart Last Call review of -15 by Vijay K. Gurbani (diff)
Secdir Last Call review of -15 by Stephen Kent (diff)
Assignment Reviewer Vijay K. Gurbani
State Completed
Request Last Call review on draft-ietf-eman-energy-aware-mib by General Area Review Team (Gen-ART) Assigned
Reviewed revision 15 (document currently at 17)
Result Ready
Completed 2014-06-23
review-ietf-eman-energy-aware-mib-15-genart-lc-gurbani-2014-06-23-00
I am the assigned Gen-ART reviewer for this draft. For background on
Gen-ART, please see the FAQ at
<

http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>.

Please resolve these comments along with any other Last Call comments
you may receive.

Document: draft-ietf-eman-energy-aware-mib-15
Reviewer: Vijay K. Gurbani
Review Date: Jun-23-2014
IETF LC End Date: Jun-30-2014
IESG Telechat date: Not known.

This document is ready as a Proposed Standard.

A couple of nits can be fixed; more information below.

Major: 0
Minor: 0
Nits: 2

Nits

- S4, third paragraph:
 s/and secondly on identification, context/on identification, and
 context/

- S5.4, third paragraph: spacing appears to be off since the relation-
 ships appear distended to the left, beyond the margin.

Thanks,

- vijay
--
Vijay K. Gurbani, Bell Laboratories, Alcatel-Lucent
1960 Lucent Lane, Rm. 9C-533, Naperville, Illinois 60563 (USA)
Email: vkg@{bell-labs.com,acm.org} / vijay.gurbani at alcatel-lucent.com
Web: 

http://ect.bell-labs.com/who/vkg/

  | Calendar: 

http://goo.gl/x3Ogq