Skip to main content

Telechat Review of draft-ietf-extra-imap-status-size-02
review-ietf-extra-imap-status-size-02-genart-telechat-shirazipour-2018-06-07-00

Request Review of draft-ietf-extra-imap-status-size
Requested revision No specific revision (document currently at 02)
Type Telechat Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2018-06-05
Requested 2018-05-10
Authors Stephan Bosch
I-D last updated 2018-06-07
Completed reviews Genart Last Call review of -01 by Meral Shirazipour (diff)
Secdir Last Call review of -01 by Kyle Rose (diff)
Opsdir Last Call review of -01 by Linda Dunbar (diff)
Genart Telechat review of -02 by Meral Shirazipour
Opsdir Telechat review of -01 by Linda Dunbar (diff)
Assignment Reviewer Meral Shirazipour
State Completed
Request Telechat review on draft-ietf-extra-imap-status-size by General Area Review Team (Gen-ART) Assigned
Reviewed revision 02
Result Ready
Completed 2018-06-07
review-ietf-extra-imap-status-size-02-genart-telechat-shirazipour-2018-06-07-00
I am the assigned Gen-ART reviewer for this draft. The General Area Review Team
(Gen-ART) reviews all IETF documents being processed by the IESG for the IETF
Chair. Please wait for direction from your document shepherd or AD before
posting a new version of the draft.

For more information, please see the FAQ at
<http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>.

Document: draft-ietf-extra-imap-status-size-02
Reviewer: Meral Shirazipour
Review Date: 2018-05-31
IETF LC End Date: 2018-05-10
IESG Telechat date: 2018-06-07

Summary: This draft is ready to be published as Standards RFC.

Major issues:
Minor issues:
Nits/editorial comments:

Best Regards,
Meral
---
Meral Shirazipour
Ericsson Research
www.ericsson.com