Telechat Review of draft-ietf-isis-extended-sequence-no-tlv-06
review-ietf-isis-extended-sequence-no-tlv-06-genart-telechat-holmberg-2015-04-27-00
| Request | Review of | draft-ietf-isis-extended-sequence-no-tlv |
|---|---|---|
| Requested revision | No specific revision (document currently at 06) | |
| Type | Telechat Review | |
| Team | General Area Review Team (Gen-ART) (genart) | |
| Deadline | 2015-04-21 | |
| Requested | 2015-04-16 | |
| Authors | Uma Chunduri , Wenhu Lu , Albert Tian , Naiming Shen | |
| Draft last updated | 2015-04-27 | |
| Completed reviews |
Genart Last Call review of -05
by
Christer Holmberg
(diff)
Genart Telechat review of -06 by Christer Holmberg Secdir Last Call review of -04 by Adam W. Montville (diff) Opsdir Last Call review of -04 by Nevil Brownlee (diff) |
|
| Assignment | Reviewer | Christer Holmberg |
| State | Completed Snapshot | |
| Review |
review-ietf-isis-extended-sequence-no-tlv-06-genart-telechat-holmberg-2015-04-27
|
|
| Reviewed revision | 06 | |
| Result | Ready | |
| Completed | 2015-04-27 |
review-ietf-isis-extended-sequence-no-tlv-06-genart-telechat-holmberg-2015-04-27-00
I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART, please see the FAQ at <http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq> Document: draft-ietf-isis-extended-sequence-no-tlv-06 Reviewer: Christer Holmberg Review Date: 27 April 2015 IETF LC End Date: 8 April 2015 IETF Telechat Date: 23 April 2015 Summary: My comments on the previous version (-05) of the document have been addressed, and the document is now ready for publication. Major Issues: None Minor Issues: None Editorial nits: None