Skip to main content

Early Review of draft-ietf-lime-yang-connectionless-oam-methods-03
review-ietf-lime-yang-connectionless-oam-methods-03-yangdoctors-early-moberg-2017-06-02-00

Request Review of draft-ietf-lime-yang-connectionless-oam-methods-00
Requested revision 00 (document currently at 13)
Type Early Review
Team YANG Doctors (yangdoctors)
Deadline 2017-02-28
Requested 2017-02-07
Requested by Mehmet Ersue
Authors Deepak Kumar , Zitao Wang , Qin Wu , Reshad Rahman , Srihari Raghavan
I-D last updated 2017-06-02
Completed reviews Yangdoctors Early review of -03 by Carl Moberg (diff)
Opsdir Telechat review of -10 by Jouni Korhonen (diff)
Secdir Telechat review of -11 by Benjamin Kaduk (diff)
Genart Telechat review of -09 by Brian E. Carpenter (diff)
Assignment Reviewer Carl Moberg
State Completed
Request Early review on draft-ietf-lime-yang-connectionless-oam-methods by YANG Doctors Assigned
Reviewed revision 03 (document currently at 13)
Result On the Right Track
Completed 2017-06-02
review-ietf-lime-yang-connectionless-oam-methods-03-yangdoctors-early-moberg-2017-06-02-00
I am the assigned YANG Doctor for the LIME YANG modules, this is the notes from
my initial review of draft-ietf-lime-yang-oam-model done with the authors:

The CODE BEGINS statement has a date designation in the file name for
ietf-connectionless-oam-methods but not for
ietf-connectionless-oam-persistent-methods. Pick one.