Skip to main content

Last Call Review of draft-ietf-mpls-lsp-ping-lag-multipath-05
review-ietf-mpls-lsp-ping-lag-multipath-05-genart-lc-holmberg-2018-12-18-00

Request Review of draft-ietf-mpls-lsp-ping-lag-multipath
Requested revision No specific revision (document currently at 08)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2018-12-11
Requested 2018-11-27
Authors Nobo Akiya , George Swallow , Stephane Litkowski , Bruno Decraene , John Drake , Mach Chen
I-D last updated 2018-12-18
Completed reviews Rtgdir Early review of -03 by Jonathan Hardwick (diff)
Secdir Last Call review of -05 by Linda Dunbar (diff)
Genart Last Call review of -05 by Christer Holmberg (diff)
Tsvart Last Call review of -05 by Joerg Ott (diff)
Opsdir Last Call review of -05 by Zitao Wang (diff)
Secdir Telechat review of -06 by Linda Dunbar (diff)
Assignment Reviewer Christer Holmberg
State Completed
Request Last Call review on draft-ietf-mpls-lsp-ping-lag-multipath by General Area Review Team (Gen-ART) Assigned
Reviewed revision 05 (document currently at 08)
Result Ready
Completed 2018-12-18
review-ietf-mpls-lsp-ping-lag-multipath-05-genart-lc-holmberg-2018-12-18-00
I am the assigned Gen-ART reviewer for this draft. The General Area
Review Team (Gen-ART) reviews all IETF documents being processed
by the IESG for the IETF Chair.  Please treat these comments just
like any other last call comments.

For more information, please see the FAQ at

<https://trac.ietf.org/trac/gen/wiki/GenArtfaq>.

Document: draft-ietf-mpls-lsp-ping-lag-multipath-05
Reviewer: Christer Holmberg
Review Date: 2018-12-18
IETF LC End Date: 2018-12-11
IESG Telechat date: Not scheduled for a telechat

Summary: The document is well written, and is ready for publication.

Major issues:None

Minor issues: None

Nits/editorial comments: None