Early Review of draft-ietf-mpls-on-path-telemetry-flag-01
review-ietf-mpls-on-path-telemetry-flag-01-opsdir-early-pignataro-2026-07-31-00
| Request | Review of | draft-ietf-mpls-on-path-telemetry-flag |
|---|---|---|
| Requested revision | No specific revision (document currently at 02) | |
| Type | Early Review | |
| Team | Ops Directorate (opsdir) | |
| Deadline | 2026-08-11 | |
| Requested | 2026-07-28 | |
| Requested by | Tony Li | |
| Authors | Haoyu Song , Giuseppe Fioccola , Rakesh Gandhi | |
| I-D last updated | 2026-08-04 (Latest revision 2026-08-04) | |
| Completed reviews |
Opsdir Early review of -01
by Carlos Pignataro
(diff)
|
|
| Comments |
Hi, This document proposes a triggering mechanism for OAM using MPLS Network Actions. We would appreciate your input. Tony |
|
| Assignment | Reviewer | Carlos Pignataro |
| State | Completed | |
| Request | Early review on draft-ietf-mpls-on-path-telemetry-flag by Ops Directorate Assigned | |
| Posted at | https://mailarchive.ietf.org/arch/msg/ops-dir/DUxxOs02hN3TrEmamKyImNvKH5o | |
| Reviewed revision | 01 (document currently at 02) | |
| Result | Serious issues | |
| Completed | 2026-07-31 |
review-ietf-mpls-on-path-telemetry-flag-01-opsdir-early-pignataro-2026-07-31-00
Hi, I have been selected as the Operational Directorate (opsdir) reviewer for this Internet-Draft. The Operational Directorate reviews all operational and management-related Internet-Drafts to ensure alignment with operational best practices and that adequate operational considerations are covered. A complete set of _"Guidelines for Considering Operations and Management in IETF Specifications"_ can be found at https://datatracker.ietf.org/doc/draft-ietf-opsawg-rfc5706bis/. While these comments are primarily for the Operations and Management Area Directors (Ops ADs), the authors should consider them alongside other feedback received. Reviewer: Carlos Pignataro Review type: OPSDIR Document: draft-ietf-mpls-on-path-telemetry-flag-01 Title: MPLS On-Path Telemetry Network Action Flag for OAM Reviewed version: -01 Review date: 6 July 2026 Intended status (per doc header): Standards Track WG: mpls --- ## Summary Choose one: - Has Major Issues: I have significant concerns about this document and recommend that the OPS ADs discuss these issues further with the authors. Problem statement is clear, scope is on-topic for mpls WG, encoding is consistent with RFC 9994's mutable-data placement rules (Format D LSE, bits 24-31, outside both the 20-bit and 23-bit ECMP-sensitive ranges). Main OPSDIR gap: no operational/manageability treatment. The sibling document draft-ietf-mpls-mna-ps-hdr added exactly this section in response to its own OPSDIR review -- same base spec, same WG... ## General Operational Comments Alignment with RFC 5706bis * No Operational/Manageability Considerations section. RFC 9994 §12/12.1 and draft-ietf-mpls-mna-ps-hdr §8/8.1 set the baseline pattern: counters (marked, triggered, dropped, malformed), success/failure tracking per action, rate-limited alarms. Add the PBT-M equivalent. ## Major Issues * Partial PBT-M support along a path isn't addressed operationally. RFC 9994 §12.3 (Backward Compatibility) covers capable/incapable node interaction; this draft doesn't (and should) extend that to "operator sees an incomplete postcard set... is that a hop idle or non-PBT-M-aware?" * Load control / DoS (§4.4, §6) stays descriptive. "Sampling and metering," "security measures must be taken" -- that's a nice intro but it there is no actionable, concrete default posture, despite Req. 4 explicitly framing this as a DoS vector. * Req. 2 config-scalability cost (§3, §4.2) is named, but not resolved. Flow Path Discovery addresses learning the path, not the configuration-churn problem as paths shift. This is, of course, another OPSDIR relevant issue. --- ## Minor Issues List non-blocking but important clarifications (e.g., ambiguous terminology or incomplete examples). * draft-jags-mpls-ps-mna-hdr-05 --> now draft-ietf-mpls-mna-ps-hdr-12! * §6 uses lowercase "must" despite BCP 14 in §1.1 — fix or reword. * §5.3 Use Cases reads aspirational ("critical solution," "critical optimization") — please use **measurable** claims. --- ## Nits * Suggestion: §5 is three short paragraphs for the section that operators really need --> expand or restructure, and leverage for an Operational Considerations section. --- I hope these are clear and useful! Thanks, and best, Carlos Pignataro