Last Call Review of draft-ietf-multimob-handover-optimization-05
review-ietf-multimob-handover-optimization-05-genart-lc-brim-2013-11-01-00
| Request | Review of | draft-ietf-multimob-handover-optimization |
|---|---|---|
| Requested revision | No specific revision (document currently at 07) | |
| Type | Last Call Review | |
| Team | General Area Review Team (Gen-ART) (genart) | |
| Deadline | 2013-11-01 | |
| Requested | 2013-10-21 | |
| Authors | Luis M. Contreras , Carlos J. Bernardos , Ignacio Soto | |
| Draft last updated | 2013-11-01 | |
| Completed reviews |
Genart Last Call review of -05
by
Scott W. Brim
(diff)
Genart Telechat review of -06 by Scott W. Brim (diff) Secdir Last Call review of -05 by Chris M. Lonvick (diff) |
|
| Assignment | Reviewer | Scott W. Brim |
| State | Completed | |
| Review |
review-ietf-multimob-handover-optimization-05-genart-lc-brim-2013-11-01
|
|
| Reviewed revision | 05 (document currently at 07) | |
| Result | Ready | |
| Completed | 2013-11-01 |
review-ietf-multimob-handover-optimization-05-genart-lc-brim-2013-11-01-00
I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART, please see the FAQ at < http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>. Please wait for direction from your document shepherd or AD before posting a new version of the draft. Document: draft-ietf-multimob-handover-optimization-06 Reviewer: Scott Brim Review Date: 2013-12-03 IETF LC End Date: 2013-11-01 IESG Telechat date: (if known): 2013-12-05 Summary: This draft is ready for publication as an experimental RFC. Major issues: none Minor issues: none Nits/editorial comments: none Scott