Skip to main content

Last Call Review of draft-ietf-netconf-yang-patch-12
review-ietf-netconf-yang-patch-12-genart-lc-holmberg-2016-10-27-00

Request Review of draft-ietf-netconf-yang-patch
Requested revision No specific revision (document currently at 14)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2016-11-01
Requested 2016-10-06
Authors Andy Bierman , Martin Björklund , Kent Watsen
I-D last updated 2016-10-27
Completed reviews Genart Early review of -07 by Roni Even (diff)
Genart Last Call review of -12 by Christer Holmberg (diff)
Secdir Early review of -07 by Dacheng Zhang (diff)
Opsdir Last Call review of -12 by Jouni Korhonen (diff)
Assignment Reviewer Christer Holmberg
State Completed
Request Last Call review on draft-ietf-netconf-yang-patch by General Area Review Team (Gen-ART) Assigned
Reviewed revision 12 (document currently at 14)
Result Ready
Completed 2016-10-27
review-ietf-netconf-yang-patch-12-genart-lc-holmberg-2016-10-27-00
I am the assigned Gen-ART reviewer for this draft. For background on
Gen-ART, please see the FAQ at
<

http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>.

Please resolve these comments along with any other Last Call comments you
may receive.

Document:             draft-ietf-netconf-yang-patch-12
Reviewer:             Christer Holmberg

Review Date:          26 October 2016
IETF LC End Date:     17 October 2016
IESG Telechat date:   3 November 2016

 
Summary:              The document is well written, and ready for
publication.

 
 
 
Major issues:            None
 
 
Minor issues:            None
 
 
 
Nits/editorial comments: None