Skip to main content

Last Call Review of draft-ietf-pce-stateful-sync-optimizations-09
review-ietf-pce-stateful-sync-optimizations-09-genart-lc-holmberg-2017-03-02-00

Request Review of draft-ietf-pce-stateful-sync-optimizations
Requested revision No specific revision (document currently at 10)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2017-02-28
Requested 2017-02-14
Authors Edward Crabbe , Ina Minei , Jan Medved , Robert Varga , Xian Zhang , Dhruv Dhody
I-D last updated 2017-03-02
Completed reviews Rtgdir Last Call review of -07 by Tomonori Takeda (diff)
Genart Last Call review of -09 by Christer Holmberg (diff)
Secdir Last Call review of -09 by Daniel Fox Franke (diff)
Tsvart Last Call review of -08 by Adrian Farrel (diff)
Assignment Reviewer Christer Holmberg
State Completed
Request Last Call review on draft-ietf-pce-stateful-sync-optimizations by General Area Review Team (Gen-ART) Assigned
Reviewed revision 09 (document currently at 10)
Result Ready
Completed 2017-03-02
review-ietf-pce-stateful-sync-optimizations-09-genart-lc-holmberg-2017-03-02-00
I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART,
please see the FAQ at <http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>

Document:                      
draft-ietf-pce-stateful-sync-optimizations-09.txt

Reviewer:                         Christer Holmberg

Review Date:                   2 March 2017

IETF LC End Date:           28 February 2017

IETF Telechat Date:        16 March 2017

Summary: The document is well written, and is ready for publication.

Major Issues: None

Minor Issues: None

Editorial Issues: None