Last Call Review of draft-ietf-pwe3-p2mp-pw-requirements-07
review-ietf-pwe3-p2mp-pw-requirements-07-genart-lc-carpenter-2014-03-18-00
| Request | Review of | draft-ietf-pwe3-p2mp-pw-requirements |
|---|---|---|
| Requested revision | No specific revision (document currently at 10) | |
| Type | Last Call Review | |
| Team | General Area Review Team (Gen-ART) (genart) | |
| Deadline | 2014-03-27 | |
| Requested | 2014-03-13 | |
| Authors | Frederic JOUNAY , Yuji Kamite , Giles Heron , Matthew Bocci | |
| Draft last updated | 2014-03-18 | |
| Completed reviews |
Genart Last Call review of -07
by
Brian E. Carpenter
(diff)
Genart Telechat review of -09 by Brian E. Carpenter (diff) Secdir Last Call review of -07 by Tobias Gondrom (diff) Opsdir Last Call review of -07 by Linda Dunbar (diff) |
|
| Assignment | Reviewer | Brian E. Carpenter |
| State | Completed | |
| Review |
review-ietf-pwe3-p2mp-pw-requirements-07-genart-lc-carpenter-2014-03-18
|
|
| Reviewed revision | 07 (document currently at 10) | |
| Result | Ready | |
| Completed | 2014-03-18 |
review-ietf-pwe3-p2mp-pw-requirements-07-genart-lc-carpenter-2014-03-18-00
I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART, please see the FAQ at < http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>. Please resolve these comments along with any other Last Call comments you may receive. Document: draft-ietf-pwe3-p2mp-pw-requirements-07.txt Reviewer: Brian Carpenter Review Date: 2014-03-18 IETF LC End Date: 2014-03-27 IESG Telechat date: Summary: Ready -------- Minor issues: ------------- The document is scoped for MPLS substrates, but I see very little in it that requires MPLS. Archtecturally, it is quite general. Was there any consideration of making it applicable to a non-MPLS substrate? > 3.4.7. Scalability > > The solution SHOULD scale at least linearly with the number of Leaf > PEs. I think this should be "at worst linearly".