Telechat Review of draft-ietf-soc-load-control-event-package-11
review-ietf-soc-load-control-event-package-11-genart-telechat-romascanu-2013-12-03-00
| Request | Review of | draft-ietf-soc-load-control-event-package |
|---|---|---|
| Requested revision | No specific revision (document currently at 13) | |
| Type | Telechat Review | |
| Team | General Area Review Team (Gen-ART) (genart) | |
| Deadline | 2013-12-03 | |
| Requested | 2013-11-25 | |
| Authors | Charles Shen , Henning Schulzrinne , Arata Koike | |
| I-D last updated | 2015-10-14 (Latest revision 2013-12-14) | |
| Completed reviews |
Genart IETF Last Call review of -10
by Dan Romascanu
(diff)
Genart Telechat review of -11 by Dan Romascanu (diff) Secdir IETF Last Call review of -10 by Donald E. Eastlake 3rd (diff) Opsdir Telechat review of -13 by Benoît Claise |
|
| Assignment | Reviewer | Dan Romascanu |
| State | Completed | |
| Request | Telechat review on draft-ietf-soc-load-control-event-package by General Area Review Team (Gen-ART) Assigned | |
| Reviewed revision | 11 (document currently at 13) | |
| Result | Ready | |
| Completed | 2013-12-03 |
review-ietf-soc-load-control-event-package-11-genart-telechat-romascanu-2013-12-03-00
I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART, please see the FAQ at < http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>. Please wait for direction from your document shepherd or AD before posting a new version of the draft. Document: draft-ietf-soc-load-control-event-package-11 Reviewer: Dan Romascanu Review Date: 12/3/13 (for the telechat) IETF LC End Date: IESG Telechat date: 12/5/13 Summary: ready - all issues raised in the IETF LC review were addressed by edits or clarified by explanations. Major issues: Minor issues: Nits/editorial comments: