Skip to main content

Last Call Review of draft-ietf-softwire-4rd-09
review-ietf-softwire-4rd-09-genart-lc-holmberg-2014-10-10-00

Request Review of draft-ietf-softwire-4rd
Requested revision No specific revision (document currently at 10)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2014-10-10
Requested 2014-10-08
Authors Rémi Després , Sheng Jiang , Reinaldo Penno , Yiu Lee , Gang Chen , Maoke Chen
I-D last updated 2014-10-10
Completed reviews Genart Last Call review of -08 by Christer Holmberg (diff)
Genart Last Call review of -09 by Christer Holmberg (diff)
Secdir Last Call review of -08 by Derek Atkins (diff)
Assignment Reviewer Christer Holmberg
State Completed
Request Last Call review on draft-ietf-softwire-4rd by General Area Review Team (Gen-ART) Assigned
Reviewed revision 09 (document currently at 10)
Result Ready
Completed 2014-10-10
review-ietf-softwire-4rd-09-genart-lc-holmberg-2014-10-10-00

I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART,
please see the FAQ at <http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>



Document:                      draft-ietf-softwire-4rd-09.txt



Reviewer:                      Christer Holmberg



Review Date:                   18 November 2014



IETF LC End Date:              10 October 2014



IETF Telechat Date:            30 October 2014



Summary:                       My comments and issues on the previous version
have been addressed, and the document is now ready for publication.



Major Issues: None



Minor Issues: None



Editorial nits: None