Last Call Review of draft-ietf-softwire-gateway-init-ds-lite-
review-ietf-softwire-gateway-init-ds-lite-genart-lc-gurbani-2012-01-02-00
Request | Review of | draft-ietf-softwire-gateway-init-ds-lite |
---|---|---|
Requested revision | No specific revision (document currently at 08) | |
Type | Last Call Review | |
Team | General Area Review Team (Gen-ART) (genart) | |
Deadline | 2012-01-03 | |
Requested | 2011-12-30 | |
Authors | Frank Brockners , Sri Gundavelli , Sebastian Speicher , David Ward | |
I-D last updated | 2012-01-02 | |
Completed reviews |
Genart Last Call review of -??
by Vijay K. Gurbani
Secdir Last Call review of -?? by Tobias Gondrom |
|
Assignment | Reviewer | Vijay K. Gurbani |
State | Completed | |
Request | Last Call review on draft-ietf-softwire-gateway-init-ds-lite by General Area Review Team (Gen-ART) Assigned | |
Completed | 2012-01-02 |
review-ietf-softwire-gateway-init-ds-lite-genart-lc-gurbani-2012-01-02-00
I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART, please see the FAQ at < http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>. Please resolve these comments along with any other Last Call comments you may receive. Document: draft-ietf-softwire-gateway-init-ds-lite-06 Reviewer: Vijay K. Gurbani Review Date: Jan-02-2012 IETF LC End Date: Jan-04-2012 IESG Telechat date: Jan-05-2012 Summary: This draft is ready as an Proposed Standard. Major issues: 0 Minor issues: 0 Nits/editorial comments: 0 Thanks, - vijay -- Vijay K. Gurbani, Bell Laboratories, Alcatel-Lucent 1960 Lucent Lane, Rm. 9C-533, Naperville, Illinois 60566 (USA) Email: vkg at {bell-labs.com,acm.org} / vijay.gurbani at alcatel-lucent.com Web: http://ect.bell-labs.com/who/vkg/