Last Call Review of draft-ietf-softwire-map-t-08
review-ietf-softwire-map-t-08-genart-lc-romascanu-2014-12-16-00
Request | Review of | draft-ietf-softwire-map-t |
---|---|---|
Requested revision | No specific revision (document currently at 08) | |
Type | Last Call Review | |
Team | General Area Review Team (Gen-ART) (genart) | |
Deadline | 2014-12-29 | |
Requested | 2014-12-15 | |
Authors | Xing Li , Congxiao Bao , Wojciech Dec , Ole Trøan , Satoru Matsushima , Tetsuya Murakami | |
I-D last updated | 2014-12-16 | |
Completed reviews |
Genart Last Call review of -05
by Dan Romascanu
(diff)
Genart Last Call review of -05 by Dan Romascanu (diff) Genart Telechat review of -06 by Dan Romascanu (diff) Genart Last Call review of -08 by Dan Romascanu Secdir Last Call review of -05 by Taylor Yu (diff) Opsdir Last Call review of -05 by Victor Kuarsingh (diff) |
|
Assignment | Reviewer | Dan Romascanu |
State | Completed | |
Request | Last Call review on draft-ietf-softwire-map-t by General Area Review Team (Gen-ART) Assigned | |
Reviewed revision | 08 | |
Result | Ready | |
Completed | 2014-12-16 |
review-ietf-softwire-map-t-08-genart-lc-romascanu-2014-12-16-00
I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART, please see the FAQ at < https://urldefense.proofpoint.com/v2/url?u=http-3A__wiki.tools.ietf.org_area_gen_trac_wiki_GenArtfaq&d=AAICAg&c=BFpWQw8bsuKpl1SgiZH64Q&r=I4dzGxR31OcNXCJfQzvlsiLQfucBXRucPvdrphpBsFA&m=wU47cwzdbQA3EthgiqiHsK8wRMdaCD1eucz7eZT_jp4&s=9eC4mYiWqVGeaX_6SSW4A5vbej46w2gZDsZtVb0JKmI&e= >. Please resolve these comments along with any other Last Call comments you may receive. Document: draft-ietf-softwire-map-t-08 Reviewer: Dan Romascanu Review Date: 12/16/14 IETF LC End Date: 12/29/14 IESG Telechat date: not yet Summary: Ready The last pending issue from my initial review was resolved by changing the Intended Status of the document from Experimental to Standards Track Major issues: Minor issues: Nits/editorial comments: