Telechat Review of draft-ietf-softwire-unified-cpe-06
review-ietf-softwire-unified-cpe-06-genart-telechat-kyzivat-2016-09-27-00
| Request | Review of | draft-ietf-softwire-unified-cpe |
|---|---|---|
| Requested revision | No specific revision (document currently at 08) | |
| Type | Telechat Review | |
| Team | General Area Review Team (Gen-ART) (genart) | |
| Deadline | 2016-09-27 | |
| Requested | 2016-09-01 | |
| Authors | Mohamed Boucadair , Ian Farrer | |
| Draft last updated | 2016-09-27 | |
| Completed reviews |
Genart Last Call review of -04
by
Paul Kyzivat
(diff)
Genart Telechat review of -06 by Paul Kyzivat (diff) Secdir Last Call review of -04 by Ólafur Guðmundsson (diff) Opsdir Last Call review of -04 by Fred Baker (diff) Rtgdir Early review of -04 by John Scudder (diff) |
|
| Assignment | Reviewer | Paul Kyzivat |
| State | Completed | |
| Review |
review-ietf-softwire-unified-cpe-06-genart-telechat-kyzivat-2016-09-27
|
|
| Reviewed revision | 06 (document currently at 08) | |
| Result | Ready | |
| Completed | 2016-09-27 |
review-ietf-softwire-unified-cpe-06-genart-telechat-kyzivat-2016-09-27-00
I am the assigned Gen-ART reviewer for this draft. The General Area Review Team (Gen-ART) reviews all IETF documents being processed by the IESG for the IETF Chair. Please wait for direction from your document shepherd or AD before posting a new version of the draft. For more information, please see the FAQ at < http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>. Document: draft-ietf-softwire-unified-cpe-06 Reviewer: Paul Kyzivat Review Date: IETF LC End Date: 2016-08-25 IESG Telechat date: 2016-09-29 Summary: This draft is ready for publication as a Standards Track RFC.