Skip to main content

Telechat Review of draft-ietf-softwire-unified-cpe-06
review-ietf-softwire-unified-cpe-06-genart-telechat-kyzivat-2016-09-27-00

Request Review of draft-ietf-softwire-unified-cpe
Requested revision No specific revision (document currently at 08)
Type Telechat Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2016-09-27
Requested 2016-09-01
Authors Mohamed Boucadair , Ian Farrer
I-D last updated 2016-09-27
Completed reviews Genart Last Call review of -04 by Paul Kyzivat (diff)
Genart Telechat review of -06 by Paul Kyzivat (diff)
Secdir Last Call review of -04 by Ólafur Guðmundsson (diff)
Opsdir Last Call review of -04 by Fred Baker (diff)
Rtgdir Early review of -04 by John Scudder (diff)
Assignment Reviewer Paul Kyzivat
State Completed
Request Telechat review on draft-ietf-softwire-unified-cpe by General Area Review Team (Gen-ART) Assigned
Reviewed revision 06 (document currently at 08)
Result Ready
Completed 2016-09-27
review-ietf-softwire-unified-cpe-06-genart-telechat-kyzivat-2016-09-27-00
I am the assigned Gen-ART reviewer for this draft. The General Area
Review Team (Gen-ART) reviews all IETF documents being processed by the
IESG for the IETF Chair. Please wait for direction from your document
shepherd or AD before posting a new version of the draft. For more
information, please see the FAQ at <​
http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>.

Document: draft-ietf-softwire-unified-cpe-06
Reviewer: Paul Kyzivat
Review Date:
IETF LC End Date: 2016-08-25
IESG Telechat date: 2016-09-29

Summary:

This draft is ready for publication as a Standards Track RFC.