Skip to main content

Last Call Review of draft-ietf-tcpm-newcwv-10
review-ietf-tcpm-newcwv-10-genart-lc-even-2015-05-20-00

Request Review of draft-ietf-tcpm-newcwv
Requested revision No specific revision (document currently at 13)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2015-05-22
Requested 2015-05-14
Authors Gorry Fairhurst , Arjuna Sathiaseelan , Raffaello Secchi
I-D last updated 2015-05-20
Completed reviews Genart Last Call review of -10 by Roni Even (diff)
Secdir Last Call review of -10 by Benjamin Kaduk (diff)
Assignment Reviewer Roni Even
State Completed
Request Last Call review on draft-ietf-tcpm-newcwv by General Area Review Team (Gen-ART) Assigned
Reviewed revision 10 (document currently at 13)
Result Ready w/nits
Completed 2015-05-20
review-ietf-tcpm-newcwv-10-genart-lc-even-2015-05-20-00
I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART,
please see the FAQ at <http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq>.

Please resolve these comments along with any other Last Call comments you may
receive.

Document:

draft-ietf-tcpm-newcwv-10

Reviewer: Roni Even

Review Date:2015–5-20

IETF LC End Date: 2015–5-22

IESG Telechat date:



Summary: This draft is ready for publication as an Experimental RFC.

Major issues:

Minor issues:



Nits/editorial comments:

I am not sure that there is a need for the first sentence in section 1.2

In section 4.4.1 MSS is used but not expanded Maximum Segment  Size (MSS)