Skip to main content

Telechat Review of draft-ietf-trill-multi-topology-05
review-ietf-trill-multi-topology-05-opsdir-telechat-chown-2018-03-06-00

Request Review of draft-ietf-trill-multi-topology
Requested revision No specific revision (document currently at 06)
Type Telechat Review
Team Ops Directorate (opsdir)
Deadline 2018-03-06
Requested 2018-02-15
Authors Donald E. Eastlake 3rd , Mingui Zhang , Ayan Banerjee
I-D last updated 2018-03-06
Completed reviews Rtgdir Early review of -01 by Martin Vigoureux (diff)
Opsdir Telechat review of -05 by Tim Chown (diff)
Secdir Telechat review of -05 by Magnus Nyström (diff)
Genart Telechat review of -05 by Brian E. Carpenter (diff)
Assignment Reviewer Tim Chown
State Completed
Request Telechat review on draft-ietf-trill-multi-topology by Ops Directorate Assigned
Reviewed revision 05 (document currently at 06)
Result Ready
Completed 2018-03-06
review-ietf-trill-multi-topology-05-opsdir-telechat-chown-2018-03-06-00
I have reviewed this document as part of the Operational directorate's ongoing
effort to review all IETF documents being processed by the IESG.  These
comments were written with the intent of improving the operational aspects of
the IETF drafts. Comments that are not addressed in last call may be included
in AD reviews during the IESG review.  Document editors and WG chairs should
treat these comments just like any other last call comments.

This document specifies extensions to the TRILL protocol to support
multi-topology routing of unicast and multi-destination traffic based on IS-IS
multi-topology as specified in RFC 5120.

The document is well-structured and written, and Ready for publication.