Last Call Review of draft-ietf-v6ops-conditional-ras-04
review-ietf-v6ops-conditional-ras-04-genart-lc-haddad-2018-05-25-00
Request | Review of | draft-ietf-v6ops-conditional-ras |
---|---|---|
Requested revision | No specific revision (document currently at 08) | |
Type | Last Call Review | |
Team | General Area Review Team (Gen-ART) (genart) | |
Deadline | 2018-05-21 | |
Requested | 2018-05-07 | |
Authors | Jen Linkova , Massimiliano Stucchi | |
I-D last updated | 2018-05-25 | |
Completed reviews |
Rtgdir Last Call review of -04
by Ravi Singh
(diff)
Genart Last Call review of -04 by Wassim Haddad (diff) Opsdir Last Call review of -04 by Sheng Jiang (diff) Genart Telechat review of -05 by Wassim Haddad (diff) Tsvart Telechat review of -05 by Yoshifumi Nishida (diff) Opsdir Telechat review of -05 by Sheng Jiang (diff) |
|
Assignment | Reviewer | Wassim Haddad |
State | Completed | |
Request | Last Call review on draft-ietf-v6ops-conditional-ras by General Area Review Team (Gen-ART) Assigned | |
Reviewed revision | 04 (document currently at 08) | |
Result | Ready | |
Completed | 2018-05-25 |
review-ietf-v6ops-conditional-ras-04-genart-lc-haddad-2018-05-25-00
I am the assigned Gen-ART reviewer for this draft. The General Area Review Team (Gen-ART) reviews all IETF documents being processed by the IESG for the IETF Chair. Please treat these comments just like any other last call comments. For more information, please see the FAQ at: https://trac.ietf.org/trac/gen/wiki/GenArtfaq Document: draft-ietf-v6ops-conditional-ras-04 Reviewer: Wassim Haddad Review Date: 21 May 2018 IETF LC End Date: 21 May 2018 IESG Telechat Date: Unknown Summary: This draft is ready for publication as Informational RFC - Major Issues: None - Minor Issues: None Regards, Wassim H.