Skip to main content

Telechat Review of draft-ietf-xrblock-rtcp-xr-synchronization-08
review-ietf-xrblock-rtcp-xr-synchronization-08-genart-telechat-shirazipour-2014-02-20-00

Request Review of draft-ietf-xrblock-rtcp-xr-synchronization
Requested revision No specific revision (document currently at 09)
Type Telechat Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2014-02-18
Requested 2014-02-13
Authors Hitoshi Asaeda , Qin Wu , Rachel Huang
I-D last updated 2014-02-20
Completed reviews Genart Last Call review of -07 by Meral Shirazipour (diff)
Genart Telechat review of -08 by Meral Shirazipour (diff)
Secdir Last Call review of -07 by Leif Johansson (diff)
Assignment Reviewer Meral Shirazipour
State Completed
Request Telechat review on draft-ietf-xrblock-rtcp-xr-synchronization by General Area Review Team (Gen-ART) Assigned
Reviewed revision 08 (document currently at 09)
Result Ready
Completed 2014-02-20
review-ietf-xrblock-rtcp-xr-synchronization-08-genart-telechat-shirazipour-2014-02-20-00

I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART,
please see the FAQ at <

http://wiki.tools.ietf.org/area/gen/trac/wiki/GenArtfaq> .



Please wait for direction from your document shepherd or AD before posting a
new version of the draft.



Document: draft-ietf-xrblock-rtcp-xr-synchronization-08

Reviewer: Meral Shirazipour

Review Date: 2014-02-19

IETF LC End Date:  2014-02-04

IESG Telechat date: 2014-02-20



Summary: This draft is ready for publication as an Standards Track RFC.







Best Regards,

Meral

---

Meral Shirazipour

Ericsson

Research

www.ericsson.com