Skip to main content

Path Computation Element Communication Protocol (PCEP) Requirements for Wavelength Switched Optical Network (WSON) Routing and Wavelength Assignment
RFC 7449

Revision differences

Document history

Date By Action
2017-06-12
Jasmine Magallanes Posted related IPR disclosure: Huawei Technologies Co.,Ltd's Statement about IPR related to RFC 7449
2015-10-14
(System) Notify list changed from pce-chairs@ietf.org, draft-ietf-pce-wson-routing-wavelength@ietf.org to (None)
2015-02-02
(System) RFC published