Skip to main content

Concluded WG Performance Implications of Link Characteristics (pilc)

Group history

Date By Action
2004-01-08 (System) Concluded group
2003-03-03 (System) Changed milestone "Document on link-layer design considerations submitted for publication as BCP.", resolved as "Done"
2003-03-03 (System) Changed milestone "Draft of TCP Over Wireless document to the IESG as BCP", resolved as "Done"
2002-02-01 (System) Changed milestone "Document on asymmetric network paths submitted to the IESG for publication as BCP.", resolved as "Done"
2001-08-29 (System) Changed milestone "Document on low bandwidth links to IESG for publication as BCP.", resolved as "Done"
2001-03-27 (System) Changed milestone "Document on PEP capabilities and limitations submitted for publication as Informational.", resolved as "Done"
2001-03-27 (System) Changed milestone "Document on lossy links to IESG for publication as BCP.", resolved as "Done"
1999-11-09 (System) Changed milestone "Draft on asymmetric network paths.", resolved as "Done"
1999-11-09 (System) Changed milestone "Draft of PEP capabilities and limitations document.", resolved as "Done"
1999-11-09 (System) Changed milestone "Draft of link-layer design considerations document.", resolved as "Done"
1999-11-09 (System) Changed milestone "Submit Internet-Draft on long-thin networks (based on draft-montenegro-pilc-ltn-01.txt) submitted to the IESG for publication.", resolved as "Done"
1999-11-09 (System) Changed milestone "Submit Internet-Draft on significantly lossy links.", resolved as "Done"
1999-11-09 (System) Changed milestone "Submit Internet-Draft on significantly low bandwidth links.", resolved as "Done"
1999-04-22 (System) Started group
1999-04-02 (System) Proposed group