Master at: https://notes.ietf.org/notes-ietf-125-anima
IETF125 is a hybrid IETF meeting.
Please familiarize yourself with the new&changed procedures for
participating in-person or remote:
https://www.ietf.org/how/meetings/preparation/
ANIMA will have one 2 hour session, chaired by Sheng Jiang and Toerless
Eckert, Thursday, Session I, "Auditorium", 09:00 - 11:00 Meeting Time
Number of participants on meetecho: 23 In the room: 18
Notetakers: Toerless, Sheng, ... collaborative editing by WG members.
Presenter: Sheng Jiang (local), Toerless Eckert (local)
Time: 10 minutes
Draft: draft-ietf-anima-constrained-voucher-30 (was -29 at IETF124)
Draft: draft-ietf-anima-constrained-join-proxy-18 (no update since
IETF124)
Presenter: Esko Dijk (remote)
Time: 20 min
Esko: for cBRSKI, do we first add DTLS security parameter details, or
first ask security early review?
Toerless TBD: Shepherd review, then look into early DIR reviews before
passing on to AD
Draft: draft-ietf-anima-rfc8366bis-26 (was -16 at IETF124)
Presenter: Michael Richardson (remote)
Time: 15 Min
Mahesh: Not a question. Just wanted to thank the authors to try to
finish up the document. It was a blocking document for several other
documents. Will review it in April and send it to IESG for review.
Thanks from Brian - document is quite special expert knowledge, thats
why there may be less comments than it deserves.
Draft: draft-ietf-anima-registrar-considerations-01 (was -00 at IETF124)
Draft: draft-ietf-anima-masa-considerations-01 (was -00 at IETF124)
Presenter: Michael Richardson (remote)
Time: 15 min
Toerless: Maybe we want to rename registrar considerations to "BRSKI
owner recommendations" and "MASA considerations" to "Manufacturer
recommendations", which is also a good reason to keep the document
separate - they address different reader communities.
Steffen: May need to add knowledge about the othrer side (owner vs.
manufacturer) - eg: owners may want to understand some aspects of
manufacturer and vice versa...
Toerless: assign item to me re. realistic ACP related operational
issues.
Draft: draft-ietf-anima-brski-discovery-09
Presenter: Toerless Eckert (local)
Time: 10 min
Draft: draft-ietf-anima-constrained-grasp-02 (was -01 at IETF124)
Presenter: Longwei Zhu
Time: 10 Min
Brian Carpenter: consider leaving out M_WAIT to simplify constrained
GRASP and just push problem up to the GRASP application layer.
(Brian also suggested to just increase the timeout, if the problem is
that the standard timeout is too short. And not implement M_WAIT.)
Presenter: Sheng Jiang (local)
Time: 10 min
Drafts: draft-ietf-anima-network-service-auto-deployment
Toerless: Maybe also approach NMRG for feedback.
There is also an NMRG/ETSI workshop on the weekend, where one of us
might want to present about this work.
Presenter: Longwei Zhu & Jialu Du (local)
Time: 10 min
Drafts: draft-zhu-anima-service-intent,
draft-du-anima-service-intent-auto-deployment
Local/remote: local
Presenter(s): Mengyao Han (local)
Time: 10 min
Drafts: draft-han-anima-ai-asa-01 &
draft-han-anima-grasp-congestion-relief-00
Presenter: Kehan Yao (local)
Time: 10 min
Drafts: draft-yao-anima-grasp-cats-metrics-distribution
Presenter: Bing Liu (local)
Time: 10min
Document: new draft to be uploaded
Toerless to send out request for reviews for 8366bis to WG - check all
non-YANG stuff.
Toerless to check for Sub-CA and outsourcing in MASA considerations.