- Introduction (blue sheets, scribe etc) (1 min) - Agenda Bashing (2 mins) - Report on completed work (12 mins) - Base spec status (20 mins) - MIME loops draft (20 mins) - Regex draft "workshop" (20 mins) - Reject/refuse draft (5 mins) - Notification draft (10 mins) - Other topics: Date draft status (5 mins) Manage Sieve protocol (5 mins) Include draft (10 mins) Proposals for adding exception handling/optional require to Sieve (10 mins) Total: 120 minutes