PCE Working Group Meeting – Tuesday, July 18, 2017; 3:50-5:50 PM



1. Introduction

1.1. Administrivia, Agenda Bashing (chairs, 5 min)

1.2. WG Status (chairs, 20 min) [25/120]



2. WG’s I-Ds

2.1. PCEP Extensions for Association Groups (Dhruv Dhody, 10 min) [35/120]

draft-ietf-pce-association-group



3. New I-Ds

3.1. PCEP Extensions for Residual Bandwidth (Daniele Ceccarelli, 10 min) [45/120]

draft-lazzeri-pce-residual-bw

3.2. PCEP Extensions for Flexible Grid (Young Lee, 10 min) [55/120]

draft-lee-pce-flexible-grid

3.3. PCEP Extensions for Multilayer LSP Association (Fangwei Hu, 10 min) [65/120]

draft-xiong-pce-multilayer-lsp-association

3.4. PCEP Extensions for Stitching with H-PCE (Young Lee/Dhruv Dhody, 10 min) [75/120]

draft-lee-pce-lsp-stitching-hpce



4. Previously Discussed Topics

4.1. PCEP Extension for Flow Specification (Adrian Farrel, 10 min) [85/120]

draft-li-pce-pcep-flowspec

4.2. PCE as Central Controller (Dhruv Dhody/Satish Karunanithi, 10 min) [95/120]

draft-zhao-pce-pcep-extension-for-pce-controller

draft-zhao-pce-pcep-extension-pce-controller-sr

draft-palle-pce-controller-labeldb-sync

4.3. PCEP for Distribution of Link State and TE (Young Lee, 10 min) [105/120]

draft-dhodylee-pce-pcep-ls