datatracker.ietf.org
Sign in
Version 5.3.1, 2014-04-16
Report a bug

ADSL MIB (adslmib)
(concluded WG)

Note: The data for concluded WGs is occasionally incorrect.
Group
Name: ADSL MIB
Acronym:adslmib
Area:Operations and Management Area (ops)
State: Concluded
Charter: charter-ietf-adslmib-07 (Approved)
Personnel
Chair: Menachem Dodge <menachemdodge1@gmail.com>
Area Director: Benoit Claise <bclaise@cisco.com>
Editors: Edward Beili <edward.beili@actelis.com>
Moti Morgenstern <moti.Morgenstern@ecitele.com>
Scott Baillie <scott.baillie@nec.com.au>
Umberto Bonollo <umberto.bonollo@nec.com.au>
Mailing List
Address:adslmib@ietf.org
To Subscribe:https://www.ietf.org/mailman/listinfo/adslmib
Archive:http://www.ietf.org/mail-archive/web/adslmib/

Charter for Working Group


The working group will define:

1. A set of managed objects to handle the bonding of xDSL lines
according to the ITU-T Recommendations G.998.1 (ATM), G.998.2 (Ethernet)
and G.998.3 (TDIM). A common MIB module will be developed to handle the
common objects and three specific MIB modules will be developed to
handle the three separate layer-2 technologies. Use will be made of the
ifStack and ifInvStack Tables defined in RFC 2863 and RFC 2864
respectively. Use will also be made of the ifCapStack and ifInvCapStack
tables as defined in RFC 5066. The Broadband forum TR-159 will be used
in the definition of these MIBs.

2. The working group will develop a set of managed objects as an
optional extension to RFC 5650 that shall provide an alternative
approach, known as the "Vector of Profiles", for the configuration of
DSL lines. The Vector of Profiles MIB will be based on the Broadband
Forum TR-165 document. The ITU-T G.997.1 will also be considered in the
definition of this extension.

The MIB modules defined by this group will be generated using SMIv2,
will be consistent with the SNMP management framework, and will
describe the relationship of the objects defined to existing MIBs such
as those described in other work products of this Working Group, the
interfaces MIB, the Ethernet MIB modules and the AToM MIB.

Milestones

Done
Submit Internet-Draft to cover subscriber equipment
Done
Meet at Chicago IETF to review Internet-Drafts
Done
Submit Internet-Draft to IESG for consideration as Proposed Standard.
Done
Meet at Oslo IETF to review new Internet-Drafts and discuss implementation experience on initial MIB
Done
Submit supplementary Internet-Draft to IESG for consideration as Proposed Standard.
Done
Produce Internet-Draft covering HDSL2 management objects.
Done
Submit updated HDSL2/SHDSL Internet-Draft
Done
Complete WG last call for HDSL2/SHDSL management objects
Done
Collect implementation reports for ADSL MIB
Done
Submit HDSL2/SHDSL MIB to IESG for consideration as Proposed Standard
Done
Submit initial Internet-Draft VDSL MIB
Done
Complete WG last call on VDSL MIB
Done
Submit updated VDSL MIB Internet-Draft
Done
Submit final VDSL MIB Internet-Draft
Done
Submit VDSL MIB to IESG for consideration as Proposed Standard
Done
New WG I-Ds for the LCS MCM and SCM MIB modules
Done
Initial WG Internet-Draft covering ADSL2 management objects
Done
Integrate working group changes and produce revised draft
Done
Complete WG last call on ADSL2 MIB
Done
Submit ADSL2 MIB to IESG for consideration as Proposed Standard
Done
Re-charter or close down
Done
Initial WG Internet-Draft covering VDSL2 management objects
Done
Inform the ITU-T and DSL Forum that work on the VDSL2 MIB has begun
Done
Integrate working group changes and produce revised VDSL2 MIB draft
Done
Post Initial Drafts of all the xDsl Bonding MIB drafts
Done
Post Vdsl2 draft version 03
Done
Post Vdsl2 draft version 04.
Done
Complete Thorough Working Group Reviews of the Vdsl2 draft and produce version 05.
Done
Working Group Last Call for the Vdsl2 document.
Done
Early MIB Doctor Reviews of the Vdsl2 draft.
Done
Make Correction to the draft following the review.
Done
Working Group Last Call for the Vdsl2 document following corrections.
Done
Present the Vdsl2 document to the IESG.
Done
Submit updated ATM and Ethernet G.Bond MIB drafts.
Done
Submit G.Bond MIB and TDIM MIB Drafts
Done
Working Group Last Call on all the G. Bond documents.
Done
Submit G.Bond documents to IESG as Proposed Standard
Oct 2012
Initial Vector of Profiles draft to be accepted by the Working Group.
Jan 2013
Submit Vector of Profiles Draft version 01
Apr 2013
Revise the draft and post vector of Profiles draft version 02.
Jul 2013
Post Vector of Profiles Draft version 03.
Oct 2013
Submit Vector of Profiles Draft version 04.
Nov 2013
Working Group Last Call for the Vector of Profiles draft.
Dec 2013
Submit the Vector Of Profile document to the IESG as Proposed Standard.
Dec 2013
Re-charter or close down.