Protocol Independent Multicast (pim)

Group History

DateByText
2014-03-05 Cindy Morgan Shepherding AD changed to Alia Atlas from Adrian Farrel
2013-10-23 Cindy Morgan Changed milestone "Submit a population count extension to PIM to the IESG", resolved as "Done"
2013-10-23 Cindy Morgan Changed milestone "Submit a more reliable PIM solution (refresh reduction) to the IESG", resolved as "Done"
2013-10-23 Cindy Morgan Changed milestone "First WG version of udated RFC 4601", resolved as "Done"
2010-10-14 (System) Changed milestone "Submit an Informational PIM last hop threats document to the IESG", resolved as "Done"
2010-10-14 (System) Changed milestone "Submit a way to authenticate PIM link local messages as PS to the IESG", resolved as "Done"
2010-10-14 (System) Changed milestone "Submit RPF Vector (use of PIM Join Attribute) as PS to the IESG", resolved as "Done"
2010-10-14 (System) Changed milestone "Submit a generic TLV PIM Join Attribute PS draft to the IESG", resolved as "Done"
2010-10-14 (System) Changed milestone "Submit the BSR MIB as a Proposed Standard to the IESG", resolved as "Done"
2010-10-14 (System) Changed milestone "Submit the BSR spec as a Proposed Standard to the IESG", resolved as "Done"
2007-08-30 (System) Changed milestone "Ratify new WG charter and milestones", resolved as "Done"
2006-10-18 (System) Changed milestone "Submit PIMv2 MIB to IESG for consideration as draft standard.", resolved as "Done"
2006-05-30 (System) Changed milestone "Submit PIMv2 MIB to IESG for consideration as proposed standard.", resolved as "Done"
2005-02-23 (System) Changed milestone "Submit PIM-SM version 2 and PIM-DM version 2 specifications to IESG for consideration as Draft Standards.", resolved as "Done"
2005-02-23 (System) Changed milestone "Submit updated PIM-SM and PIM-DM internet-drafts, clarifying any inconsistencies or ambiguities in the previous drafts.", resolved as "Done"
2005-02-23 (System) Changed milestone "Submit PIM-SM Applicability Statements", resolved as "Done"
2005-02-23 (System) Changed milestone "Resubmit the latest PIM-SM version 2 specification to IESG for consideration as a proposed standard RFC", resolved as "Done"
2004-04-01 (System) Changed milestone "Update the PIM-DM version 2 Internet-draft. Go to WG last call. Submission to IESG for considerations as proposed  standard.", resolved as "Done"
2004-04-01 (System) Changed milestone "Hold the first Working Group meeting and discuss the charter and the state of progress on the chartered items.", resolved as "Done"
1998-07-28 (System) Started group
1998-07-09 (System) Proposed group